Loading…
Loading…
France's 2020 Stratégie nationale pour le développement de l'hydrogène décarboné set a 6.5 GW electrolyser-capacity target by 2030 and allocated €7.2 bn under the original France Relance envelope. SNH II, adopted at the Comité interministériel de l'Innovation on 10 April 2025, recalibrates this framework for the post-IRA / EU Green Deal Industrial Plan competitive environment.
Capacity targets: 6.5 GW low-carbon H₂ production capacity by 2030 (maintained), 10 GW by 2035 (new horizon). France treats both nuclear-electricity-based hydrogen and renewable-electricity-based hydrogen as "décarboné" under its national taxonomy — a deliberate divergence from EU RFNBO additionality rules that has been a persistent Franco-German fault line in EU hydrogen policy negotiations.
Price-support mechanism (€4 bn): A 15-year production-subsidy scheme covering the spread between low-carbon H₂ market prices and fossil H₂ costs. This mirrors the structure of the UK Hydrogen Production Business Model and the US §45V clean-hydrogen PTC, providing long-duration revenue certainty to electrolyser developers. Paired with the first H₂ call for tenders whose specifications were published the same week.
France 2030 hydrogen envelope (€9 bn total):
Sectoral demand priorities (in order): 1. Industrial decarbonisation: ammonia, methanol, refinery hydrogen substitution 2. Heavy mobility: trucks, shipping, aviation kerosene-substitution via synthetic fuels (e-SAF) 3. Grid-balancing / seasonal storage (longer horizon, not the primary 2030 driver)
New call for tenders for hydrogen vehicles: SNH II launches a separate tender for H₂-powered commercial utility vehicles (heavy trucks), addressing a gap in the 2020 strategy that focused mainly on production-side.
IPCEI alignment: France is co-signatory to both IPCEI Hy2Tech (22 EU members, electrolyser & fuel-cell manufacturing) and IPCEI Hy2Use (industrial usage pathways). SNH II explicitly extends the 2030 IPCEI co-funding commitment through the 2035 horizon.
RFNBO Delegated Act additionality rules; IPCEI state-aid approvals for nuclear-backed projects remain a Commission flashpoint
McPhy, Elogen/Plug Power) seeking 15-year offtake certainty — comparable to IRA §45V in its bankability effect
intersecting with EU ReFuelEU Aviation and FuelEU Maritime mandates coming into force 2025
Toyota, and Hyzon-successor projects after the earlier FCH tender undersubscription
manufacturers if France + Germany (NWS) targets aggregate — significant capex signal
Crisis and Transition Framework) expiry and the permanent Green Deal Industrial Plan notification framework?
equivalent additionality conditions?
awards H1 2026