Loading…
Loading…
DIC Corporation is a major Japanese chemicals producer whose Functional Products segment includes epoxy resins used in semiconductor packaging and encapsulation compounds. As AI-accelerator and advanced-logic packaging volumes rise, domestic supply security for the resin inputs that feed substrate and mold-compound production has become a METI policy focus alongside the fabs themselves.
METI's Supply Security Plan mechanism (under the 2022 Economic Security Promotion Act, see 2022-05-18-japan-economic-security-promotion-act) lets a company file a plan committing to a minimum continuous-production period for a designated "specified critical good" in exchange for a capex grant. This is plan certification No. 2 in the 2025 semiconductor tranche (2025半導体第2号), following the tranche's No. 1 certification for JX Metals (sputtering-target capacity, approved 18 July 2025) and preceding No. 3 for Nitto Boseki (low-thermal-expansion glass cloth, see 2025-08-07-japan-meti-nitto-boseki-glass-cloth-supply-security-grant).
The certified project: a new epoxy-resin plant at DIC's Chiba factory (Ichihara City, Chiba Prefecture), max grant ~JPY 3bn (~USD 20.1m), targeting a ~59% increase in domestic production capacity for semiconductor-grade epoxy resin, with supply starting July 2029.
Severity is set low (2/5, quant) — this is a single-company capex subsidy of modest absolute size (~USD 20m), not a trade-restrictive measure. It is filed because it is a concrete data point in the broader Japan ESPA supply-chain-resilience program and extends the same materials-layer resilience push (following JX Metals and Nitto Boseki) into semiconductor-packaging chemistry rather than fab-layer or substrate-layer inputs.
designated under Japan's specified-critical-goods regime, alongside sputtering targets (JX Metals) and glass cloth (Nitto Boseki) from the same 2025 tranche — a materials-layer, not just fab-layer, resilience push.
data point for semiconductor-packaging-chemistry bottleneck watchers.
semicon hub page for further tranche certifications (plan numbers 2025半導体第4号 onward).
(plan 2), and Nitto Boseki (plan 3) name other materials chokepoints worth tracking individually.
publishes execution data.