Loading…
Loading…
The legal instrument is the Department for Promotion of Industry and Internal Trade's (DPIIT) Public Procurement (Preference to Make in India) Order, 2017 (as amended, most recently effective 16 September 2020), issued under Rule 153(iii) of the General Financial Rules 2017. RVNL, a central-government public-sector undertaking under the Ministry of Railways, applies the Order's standing local-content preference mechanism to its own procurement: where nodal-ministry- declared local capacity exists, Class-I local suppliers (minimum local-content threshold, ordinarily paired with a purchase-preference margin in bid evaluation) receive an evaluation advantage over other bidders regardless of tender value.
This filing records one instance of that standing order applied to a specific, quantified tender: RVNL/KOL/EL/Metro/20, covering Design, Supply, Erection, Testing and Commissioning of Environmental Control Systems and Tunnel Ventilation Systems for four underground stations on the Kolkata Metro, with a disclosed contract value of INR 305.81 crore.
Severity is set low-moderate (2) and severity_basis: mixed — the contract value is quantified and disclosed, but the specific local-content percentage threshold applied to the Class-I designation for this tender was not independently confirmed (GTA's full tender detail sits behind an account-gated view). This is a routine application of a standing central-government procurement policy, not a new trade barrier — it shifts bid-evaluation weighting toward Class-I local suppliers without outright excluding foreign bidders.
systems bidding into RVNL's Kolkata Metro underground-station package face a structural scoring disadvantage relative to Class-I local suppliers on a contract sized at roughly USD 36 million.
infrastructure tenders carrying the same Preference-to-Make-in-India margin (see the existing register cluster of NHAI/Railways/BMRCL/ RVNL/DVC filings under the EM logistics/trade-facilitation theme).
designation for this specific tender was not independently confirmed against the full RFP/NIT document.
filing date.