Loading…
Loading…
The legal instrument is the Department for Promotion of Industry and Internal Trade's (DPIIT) Public Procurement (Preference to Make in India) Order, 2017 (as amended, Order No. P-45021/2/2017-B.E.-II), which mandates a bid-evaluation preference margin (ordinarily a 20% purchase-preference margin over a 50% minimum local-content threshold for "Class-I local supplier" status) across central- and state-linked procurement, including central public-sector undertakings such as NEEPCO.
This filing records that standing order applied to a NEEPCO electro-mechanical works tender for the Heo Hydro Electric Project, announced 9 January 2026. The tender itself (EM Works of Heo HEP, NIB No. 477 dated 26 February 2025, Tender ID 2025_NEEPC_228155_1) was independently traced via third-party tender-listing sites (hydropower-dams.com, tendershark.com); it carries a fixed EMD of INR 4.177 crore. Consistent with the companion NHAI/NHIDCL/UPMRC/BMRCL localisation-preference filings on this register, the exact local-content percentage and preference-margin rate applied were not independently confirmed against the full RFP document within the available search budget.
Severity is set low (2), consistent with the companion infrastructure-tender filings: this is a routine, standing domestic-preference policy applied within a single hydropower procurement, not a new trade barrier — it shifts bid-evaluation weighting toward Class-I local suppliers rather than excluding foreign bidders outright.
bidding into NEEPCO's Arunachal Pradesh hydro pipeline face the same structural scoring disadvantage documented across NHAI/NHIDCL/UPMRC/ BMRCL tenders elsewhere on this register.
carrying the same standing preference margin under the Atmanirbhar Bharat procurement posture, this time in the hydropower-generation sector rather than roads/rail/metro.
to this specific tender were not confirmed against the full RFP document; GTA's full detail sits behind an account-gated view.
generator OEMs) are materially affected depends on how NEEPCO defines "local content" for imported hydro-generation components — not disclosed in available public summaries.