Loading…
Loading…
MCTI and FINEP opened a public call (chamada pública) under the "Mais Inovação Brasil" program's second round, directing BRL 300 million in non-repayable economic-subsidy funding — drawn from the National Fund for Scientific and Technological Development (FNDCT) — toward Brazilian companies developing new products, processes or services for the defence sector. Applicants choose between two thematic lines: "Tecnologias para Defesa Nacional" (National Defence Technologies) or "Sustentabilidade econômica para Base Industrial de Defesa — BID" (Economic Sustainability for the Defence Industrial Base). The stated policy goals are reducing dependence on foreign defence technologies and expanding cooperation between companies and scientific/technological institutions. Funding is non-reimbursable but requires a financial counterpart from the applicant company proportional to the subsidy received. Submissions are accepted in continuous flow rather than a single deadline, closing when the budget is committed or by the stated cutoff date.
Severity is set at 2/5 (quant-anchored): the disclosed program budget is BRL 300 million (~USD 56.9 million at announcement-date rates). This is a national, open-call subsidy scheme spanning an entire strategic sector (defence industrial base) rather than a single-company grant, which keeps it above the register's smallest FINEP awards (e.g. the BRL 90m single-company Eve Air Mobility eVTOL grant, severity 1), but the headline volume is still modest relative to Brazil's largest national industrial-policy or BNDES funding-line packages already in the register (e.g. the BRL 2.6bn BNDES/IDB/JICA MSME-health credit lines, also rated 2), keeping this in the low-to-mid range rather than higher.
industrial capacity and reduce import dependence, alongside the broader Nova Indústria Brasil national industrial policy.
signals FINEP is trying to both spur new defence technology and shore up the financial viability of existing defence suppliers.
projects are approved under the continuous-flow process.
filing time; the call was newly opened.
or project type was not specified in the primary source excerpt reviewed.