Loading…
Loading…
Standard BNDES development-bank co-financing of a private biogas project: BRL 101.5m from the Fundo Clima (concessional climate-fund rate) plus BRL 47.1m from the general Finem infrastructure line, covering roughly 76% of the BRL 196m total project cost. The plant converts agricultural/agro-industrial biomass and organic waste from western Paraná into biomethane (11 Mm³/year) and an organic fertilizer by-product for the regional agribusiness sector — part of the broader Brazilian pattern of BNDES climate-fund-backed biogas/biomethane project finance (São Leopoldo, Gás Verde, and others already in the register) rather than a novel policy instrument.
Severity is kept at qual/1: the loan is small relative to BNDES's typical infrastructure book, it is a routine sectoral-financing approval rather than a new statute or trade-restrictive measure, and no figure here maps to the register's magnitude: schema (tariff/quota/ coverage-share) — BRL 148.5m is a financing amount, not one of those three fields, so no magnitude: block is set per the omit-rather-than- force rule.
western Paraná agribusiness waste streams as a renewable-gas feedstock source alongside RS's São Leopoldo project.
Brazil's domestic biomethane industry ahead of the 2026 fuel-blend mandates.
available coverage.
vehicular/industrial sale) not specified.