Loading…
Loading…
GL X marks the widest point so far in the GL U → GL X → GL Y/Z → GL AA/BB → GL CC/DD sequence of Iran-oil relief valves: where GL U (March 20, 2026) authorized only the completion of sales on cargo already loaded onto vessels, GL X extended to new purchases and loadings — the first time this maximum-pressure architecture (NSPM-2, Feb 4, 2025) permitted fresh transactions in Iranian crude rather than merely unwinding a pre-existing pipeline backlog. That breadth did not last: GL X1, issued just 16 days later on July 7, 2026, revoked GL X outright and shut the door on new purchases again. The GL U file's open question — "whether GL X … and the underlying talks it references are already filed in this register" — is resolved here: GL X existed, and its own supersession is the headline, not an unrelated talks-driven event. As with GL U, OFAC did not publish either license in the Federal Register until well after both had run their course (September 30, 2026, nearly three months after GL X1's issuance).
relief chain with its first rapid reversal: a 16-day round-trip from broad relief to full revocation signals the maximum-pressure architecture is being tested and pulled back under real-time pressure, not loosened on a stable trajectory.
their Federal Register publication, no live compliance obligation currently attaches to either; filed here for corpus completeness and to close the GL U file's open question.
filing — that reflects a gap in what we had tracked, not the absence of the license itself.
the July 7 revocation 16 days after GL X's issuance — no primary source located in this pass discloses the trigger.
expired" in the September 30, 2026 Federal Register notice.