Loading…
Loading…
The legal instrument is the Department for Promotion of Industry and Internal Trade's (DPIIT) Public Procurement (Preference to Make in India) Order, 2017 (as amended), which mandates a bid-evaluation preference margin for "Class-I local supplier" bidders across central-government and PSU procurement. NHPC Limited applied that standing order to the Lot-3 tender — main dam including coffer dam and hydro-mechanical works — for the Dibang Multipurpose Project (2,880 MW), a nationally strategic hydropower and flood-moderation scheme in Arunachal Pradesh sited close to the India-China border. GTA values the tender at INR 17,069 crore (~USD 2.05bn); a Lot-3 financial-bid finalisation reported in trade press in February 2026 put the winning (L1) bid at roughly INR 14,446 crore, consistent with GTA's figure being the pre-award estimated/reserve value rather than the awarded contract price.
This is the same recurring class of action as the large batch of NHAI/NHIDCL/state-PWD/NHPC localisation-preference filings already in the register, and the largest instance of that class filed to date by contract value. Severity is set at 3 (quant, anchored on the INR 17,069cr / ~USD 2.05bn tender value — roughly 5x the prior NHPC Kamala Hydroelectric filing and the single largest local-content-preference tender in the register), consistent with treating strategically sited, border-region hydropower civil works as a step above the routine NHAI-road baseline (capped at severity 2 regardless of size) while still reflecting a generic-order application rather than a new, bespoke trade instrument.
one of India's largest active dam-construction packages face a structural scoring disadvantage relative to Class-I local suppliers, consistent with India's Atmanirbhar Bharat procurement posture extended into strategic, border-adjacent infrastructure.
public-procurement localisation actions — individually routine in legal mechanism, but this instance is notable for scale and for sitting inside a project with independent strategic-infrastructure significance (largest dam under construction in India, Arunachal Pradesh border region).
NHPC's specific NIT/tender ID for Lot-3 (candidates seen in secondary reporting include IDs in the 2024_NHPC_8xxxxx and 2025_NHPC_8xxxxx ranges) was not independently reconciled against NHPC's own tender portal during filing; GTA's full state-act detail sits behind an account-gated view.
for this specific tender were not visible in the publicly accessible excerpt.