Loading…
Loading…
What they make, where they produce, the materials that matter — then what is coming, what it would do to the business, and the moves available. Sector: mining metals. Ownership re-checked 2026-10-01 — exposure claims not re-checked since fill. Company profile →
Atalaya Mining Copper, S.A. (LSE Main Market: ATYM) is a European copper producer whose entire asset portfolio sits in Spain, concentrated in the Iberian Pyrite Belt.
Its producing asset is Riotinto in Andalucía — the Cerro Colorado open pit feeding a 15 Mtpa processing plant that the company describes as the largest in the Iberian Pyrite Belt — which produced 51,139 tonnes of copper in FY2025 from 16.6 Mt of ore, at the higher end of its 49,000–52,000 t guidance range. Alongside it Atalaya runs the E-LIX Phase I plant, a hydrometallurgical unit that recovered zinc precipitates from copper-zinc concentrate during Q4 2025. The rest of the portfolio is pre-production: Proyecto Masa Valverde (polymetallic Cu-Zn-Pb-Au-Ag underground deposits 28 km south of the Riotinto plant, acquired 2020) and Proyecto Touro in Galicia at development stage, and Proyecto Ossa Morena at exploration stage. The company completed a cross-border conversion from Cyprus to Spain on 9 January 2025, changing its registered name from Atalaya Mining Plc to Atalaya Mining Copper, S.A. and its registered office to Seville. Its shares continue to trade on the London Stock Exchange's Main Market.
Verbatim from the dossier's “What they do” section — sources on the company profile.
This is where Atalaya Mining Copper, S.A. produces — approximate output shares from its dossier — not where it sells. Sales geography is not yet in our corpus for any company, so we cannot compute exposure to measures that bite on where products ship: an extraterritorial re-export rule follows the shipment and its material content, not the factory. Where such a measure touches its materials, the policy sections below flag it — but its sales-side incidence is not computable yet, and we say so rather than substitute the production map for it.
Of everything in its products, we track the critical inputs — the materials whose supply is concentrated in few countries, policy-exposed, or hard to substitute — because those are the ones a single measure can move. Each carries its role in the product, quoted from the dossier's own exposure note.
Copper — *primary product*. Copper concentrate is the sole key product of the Riotinto plant, and the company's own year-by-year table gives 51,139 t of contained copper (48,158 t payable) from 298,108 t of concentrate in FY2025.
Zinc — *by-product, small and intermittent*. The E-LIX Phase I plant produced zinc precipitates from copper-zinc concentrates in Q4 2025 and sold all of what it produced, but the company states the plant ran intermittently and at variable, reduced capacity, and discloses no tonnage.
Silver — *by-product, carried in the copper concentrate*. 1.
Scope. The non-critical remainder of the bill of materials — structural steel, polymers, glass and the like — is not tracked here because it is not supply-constrained: this section covers the constrained inputs, which is where policy risk concentrates, not a full bill of materials.
The top 5 are ranked mechanically — what the instrument does (its transmission class: an export ban is not a reporting duty), × how close to law (stage-derived likelihood band, never a probability) × how much of your tracked bill of materials it touches. Each unfolds as a chain: trigger → what it hits → the response the instrument actually calls for. A measure touching a material you produce can be an opportunity, not a threat.
CD · stage passed-vote → high likelihood · touches copper · flagged 11 Aug 2026, 57d pending
On 29 June 2026 DRC's Vice-Prime Minister for the National Economy (Daniel Mukoko Samba), Minister of Mines (Louis Watum Kabamba) and Minister of Foreign Trade (Julien Paluku Kahongya) jointly signed an arrêté interministériel regulating the commercialisation, export and nomenclature of marketable mining products, which for the first time BANS the export of unprocessed copper and cobalt concentrates outright — replacing the entire framework adopted 4 August 2023. Mining-rights holders, processing entities and buying counters (comptoirs) may seek a ministerial derogation to export less-elaborated products for up to one year, assessed against national mining policy and the technical/economic constraints of each mineral. A new tax regime for economically significant mining byproducts is introduced with a 3-month transition period. This is broader and more foundational than the existing filed/queued DRC cobalt-specific instruments — it is a national concentrate EXPORT BAN (not a quota or hydroxide-specific measure) covering BOTH copper and cobalt, issued under joint Economy/Mines/Trade authority rather than ARECOMS sectoral rulemaking. DRC = priority-tier chokepoint (cobalt, copper, tantalum). Severity 4 expected (national ban, dual-metal, replaces a 3-year-old framework).
source ↗Copper — *primary product*. Copper concentrate is the sole key product of the Riotinto plant, and the company's own year-by-year table gives 51,139 t of contained copper (48,158 t payable) from 298,108 t of concentrate in FY2025.
The prohibition covers the raw/unprocessed form; material processed in DR Congo stays exportable under the order's own exemption — so a DR Congo processing route remains open alongside the alternatives below.
copper — you sit on the supply side: a measure tightening others' supply pushes buyers toward you, so your move is positioning, not substitution (chokepoint page).
CN · stage passed-vote → high likelihood · touches copper · flagged 25 Jul 2026, 74d pending
Effective 1 May 2026 China suspended exports of all ordinary industrial sulfuric acid — including the acid co-produced from copper/zinc smelting — with only electronic-grade high-purity acid still exportable under special approval; reporting attributes the measure to a joint Ministry of Commerce (MOFCOM) + General Administration of Customs (GACC) notice, expected to run through end-2026. Sulfuric acid is the indispensable leach/process input for copper hydrometallurgy (SX-EW), phosphate-fertilizer production, and battery-metal (nickel HPAL, lithium) processing, so a China export halt tightens a systemic upstream chokepoint hitting seaborne-acid buyers (Chile/Peru copper, Morocco/India phosphate, Indonesia nickel). This is a DISTINCT instrument from the already-filed 2025-12-12-china-ndrc-phosphate-fertilizer-export-suspension (finished-fertilizer export control) and 2026-03-31-russia-decree-350-sulphur-export-ban-extension (elemental sulphur, different country/product) — it controls the acid itself.
source ↗Copper — *primary product*. Copper concentrate is the sole key product of the Riotinto plant, and the company's own year-by-year table gives 51,139 t of contained copper (48,158 t payable) from 298,108 t of concentrate in FY2025.
copper — you sit on the supply side: a measure tightening others' supply pushes buyers toward you, so your move is positioning, not substitution (chokepoint page).
PE · stage passed-committee → elevated likelihood · touches copperzincsilver · flagged 14 Jun 2026, 115d pending
Reduces maximum idle-concession period from 30 to 15 years (initial production deadline unchanged at 10 yr; penalty extension cut from 20 yr to just 5 yr); eliminates irrevocable legal status of mining concessions for first time in Peruvian law history, making concessions revocable by administrative authority; introduces higher annual fees and stronger production/investment requirements; threatens legal certainty for Peru's undeveloped copper and silver project pipeline — Peru = #2 copper, #4 silver, #1 lead, #2 zinc globally
source ↗Copper — *primary product*. Copper concentrate is the sole key product of the Riotinto plant, and the company's own year-by-year table gives 51,139 t of contained copper (48,158 t payable) from 298,108 t of concentrate in FY2025.
Zinc — *by-product, small and intermittent*. The E-LIX Phase I plant produced zinc precipitates from copper-zinc concentrates in Q4 2025 and sold all of what it produced, but the company states the plant ran intermittently and at variable, reduced capacity, and discloses no tonnage.
Silver — *by-product, carried in the copper concentrate*. 1.
The filed text doesn't state this instrument's mechanism clearly enough to classify, so we don't guess a response — the measure text above is the read.
copper — you sit on the supply side: a measure tightening others' supply pushes buyers toward you, so your move is positioning, not substitution (chokepoint page).
zinc — you sit on the supply side: a measure tightening others' supply pushes buyers toward you, so your move is positioning, not substitution (chokepoint page).
Further materials are covered in section 6 below.
ZM · stage passed-vote → high likelihood · touches copper · flagged 31 Jul 2026, 68d pending
Minister of Finance, acting under s. 89 of the Customs and Excise Act, cut the copper-concentrate export duty to ZERO for tariff headings 2603. 00. 21 / 2603. 00. 22 / 2603. 00. 23 / 2603. 00. 29, capped at 271,742 t, effective 1 June 2026 with automatic lapse 30 September 2026, with per-entity tonnage caps and (per one secondary) a requirement that exempt shipments channel through Industrial Resources Limited. This is a SUPPLY-RELIEF (liberalising) action — a net EASING of a copper/cobalt chokepoint for ~4 months, explicitly to clear stockpiled unprocessed concentrate while Zambia's major smelters are down for extended maintenance. It is the "(No. 2)" successor instrument to the already-filed 2026-03-05-zambia-si-15-2026-copper-concentrates-export-duty-suspension (a distinct SI with its own number, tonnage cap and validity window). Severity ~2 expected.
source ↗Copper — *primary product*. Copper concentrate is the sole key product of the Riotinto plant, and the company's own year-by-year table gives 51,139 t of contained copper (48,158 t payable) from 298,108 t of concentrate in FY2025.
This changes the form of what ZM exports, not whether you can buy: raw/unprocessed exports are restricted while domestically processed material stays available — that is the measure's own mechanism. Your ZM-origin raw feed becomes processed-only; the route is a value-added purchase or a ZM processing partner, not a supplier switch.
copper — you sit on the supply side: a measure tightening others' supply pushes buyers toward you, so your move is positioning, not substitution (chokepoint page).
BO · stage draft-published → moderate likelihood · touches copperzincsilver · flagged 17 Jun 2026, 112d pending
New general mining law (distinct from PL-157 lithium/evaporites bill already in index): 20-year tax stability regime for mining projects; eliminates the 12. 5% impuesto adicional IUE-RM on extraordinary commodity-price gains; retains 25% company profits tax (IUE) and 5% royalty; streamlines licensing from current 9–15 years to international norms; enables association contracts between private companies and cooperatives; coordinated with a forthcoming general investment law incorporating fiscal and non-fiscal incentives; framed around reversing 15+ years of investment drought; backing from World Bank; bill to be presented to Asamblea Legislativa Plurinacional after Mining Summit (May 18–20, 2026); target: executive submission late July 2026
source ↗Copper — *primary product*. Copper concentrate is the sole key product of the Riotinto plant, and the company's own year-by-year table gives 51,139 t of contained copper (48,158 t payable) from 298,108 t of concentrate in FY2025.
Zinc — *by-product, small and intermittent*. The E-LIX Phase I plant produced zinc precipitates from copper-zinc concentrates in Q4 2025 and sold all of what it produced, but the company states the plant ran intermittently and at variable, reduced capacity, and discloses no tonnage.
Silver — *by-product, carried in the copper concentrate*. 1.
The filed text doesn't state this instrument's mechanism clearly enough to classify, so we don't guess a response — the measure text above is the read.
copper — you sit on the supply side: a measure tightening others' supply pushes buyers toward you, so your move is positioning, not substitution (chokepoint page).
zinc — you sit on the supply side: a measure tightening others' supply pushes buyers toward you, so your move is positioning, not substitution (chokepoint page).
Further materials are covered in section 6 below.
President Peter Mutharika signed an executive order (dated 23 Oct 2025, effective 21 Oct 2025, announced at Sanjika Palace during a cabinet swearing-in) prohibiting the export of raw/unprocessed mine…
Senate-approved package of amendments to Kazakhstan's Code on Subsoil and Subsoil Use (No.
TZ Finance Bill establishes the Mineral Research Fund capitalised at 10% of gross mineral revenue (~TZS 141 billion/yr at 2025 collection levels); amends the Income Tax Act to formally recognise tax…
First federal statutory framework for critical and strategic minerals; establishes CMCE oversight committee, R$2B Mineral Activity Guarantee Fund (0.
Prohibits raw mineral exports unless 30% value-addition achieved domestically; affects Chinese mining companies (dominant in Nigerian critical minerals sector), Western offtake agreements, and all fo…
Revises 30 CFR Part 580 to streamline 10 provisions governing prospecting, leasing, and operations for hard minerals (manganese nodules, cobalt-rich crusts, seafloor massive sulfides) on the US Outer…
Mongolia's cabinet approved and submitted to the State Great Khural a draft amending ~40% of the 2006 Minerals Law: (i) cuts the maximum exploration-licence duration from 12 to 6 years while raising…
The Energy and Mineral Resources Ministry (ESDM) and Ministry of Finance announced May 11, 2026 that the implementation of higher tiered royalty rates under Government Regulation (PP) 19/2025 — cover…
RESourceEU (COM(2025) 945, 3 Dec 2025) commits the Commission to establish a **European Critical Raw Materials Centre** in early 2026 with four functions: (a) generate **systemic market intelligence…
Binding plurilateral trade agreement among like-minded partners (US, EU, Japan and FORGE coalition members) establishing coordinated trade measures for critical mineral supply chains — including bord…
On 10 July 2026 the African Development Bank Group, with the African Union Commission, the AfCFTA Secretariat and UNECA, convened African ministers of mining/energy/industry in Abidjan for the "Minis…
All DRC mining operators (Glencore, CMOC, Ivanhoe Mines, Eurasian Resources Group, and 50+ others) must transfer 5% of share capital to Congolese employees by July 31, 2026 or face permit suspension;…
State-owned QMSD (Qatar Mining Company subsidiary), paused since Sudan's 2023 civil war, confirmed at a 13 May 2026 Port Sudan meeting between Sudan's Minister of Minerals Nour al-Daim Taha and Qatar…
Saudi sovereign mining vehicle Manara Minerals (PIF + Ma'aden JV) is in advanced negotiations to acquire a 15-20% equity stake (deal value ~USD 1.
Saudi state mining-investment vehicle Manara Minerals (the PIF/Ma'aden JV) is negotiating to buy a 10–20% stake in the Reko Diq copper-gold project (Balochistan, Pakistan) for ~$500M–$1bn, acquiring…
Saudi sovereign mining vehicle Manara Minerals (PIF + Ma'aden JV) is in negotiation to buy a 10-20% stake (deal value ~USD 500m-1bn) in the Reko Diq copper-gold project in Balochistan, Pakistan — one…
Full replacement of the Mining Act 1992 with sweeping new statute: state acquires up to 30% equity in any new mining project (Kumul Minerals free-carry); special mining leases (SML) issued for initia…
Ministry of Mines issued operational guidelines for the Mining Sector Reforms component under Scheme for Special Assistance to States for Capital Investment (SASCI) FY2026-27, with total ₹5,000 crore…
2 of 44 filed an explicit in-force stage; the rest (flagged below) default from an absent stage: field, not a filed assertion. Each links to the register entry with its primary source.
For a material it buys, a restriction tightens supply and raises input cost — a headwind. For the 3 it produces, the same restriction supports pricing — a tailwind. Scores are footprint-adjusted and buyer-relative (0–100, higher = more exposed).
Its customers sit in ev batteries, permanent magnets, ev motors, wind turbines, defence… — read via the graph's critical minerals node, the nearest equivalent of its sector. A measure supporting those sectors supports demand for this company's products; one restricting them puts that demand at risk. The sign shown is the mechanical read — click through to judge whether a measure protects or constrains the customer.
Every tracked material is on the supply side — the strategy here is positioning, not substitution.
This company sits on the supply side of copper. Restrictions by 🇨🇳 CN push buyers toward ex-CN producers — the strategy is to be visible where those buyers look: the copper chokepoint page and the watchlist.
This company sits on the supply side of zinc. Restrictions by 🇨🇳 CN push buyers toward ex-CN producers — the strategy is to be visible where those buyers look: the zinc chokepoint page and the watchlist.
This company sits on the supply side of silver. Restrictions by 🇲🇽 MX push buyers toward ex-MX producers — the strategy is to be visible where those buyers look: the silver chokepoint page and the watchlist.
lib/policy-transmission.ts): an export prohibition in the measure's name/text → supply restriction; a raw/unprocessed-export limit or local-processing mandate → beneficiation (form change, not unavailability); reporting/disclosure/due-diligence language → compliance obligation; tariff/trade-remedy language → import cost; subsidy/fast-track/relaxation language → support; investment-screening/M&A language → investment control. When the text carries no signal we fall back to the action-type default and label the chip inferred; when neither exists the card says so and derives no response — we never assert a class the evidence doesn't support.lib/iptm-material-country-production.ts; mining stage preferred, refining as fallback — the stage and source year are in each figure's hover text). Ex-issuer supply removes the ISSUING country and renormalises the remaining listed shares (so they sum to 100% of what's left) — alternatives to the country making the rule, never a default ex-China list. Where the issuer holds no measurable share, the card says so plainly instead of implying supply loss.lib/alternative-viability.ts): each named alternative carries a deployment status — operating / ramping / restarting / development / unknown — derived from word-boundary signal phrases in its own dossier (“operating since 1896”, “restarting the … mine”, “FID taken”), and the verbatim matched phrase is shown as the basis so the claim is auditable; a dossier with no signal stays unknown, never guessed. Any evidenced production date is quoted verbatim (“first production targeted H2 2029” → “no tonnes before 2029”) — we never synthesize one. A measure whose own text claims extraterritorial / re-export / de-minimis / foreign-direct-product / percentage-of-value scope triggers the origin-switching warning above the list: such a rule follows the material, not the seller, so a foreign-made alternative can still be captured. Same-issuer register actions targeting an alternative's country and material mark it may be captured, with the entries linked. “Capacity partly committed” lines quote the dossier verbatim — we hold no structured free-capacity numbers and never imply a utilisation figure.How MacroLens tracks this for you. The policy register files new measures daily and this page recomputes from it — the same chokepoints are monitored live on the watchlist and in the full register.