Siemens Gamesa Renewable Energy Ltd is the UK entity (Companies House no. 10253129) behind the Hull Blade Factory at Alexandra Dock, a Β£310m offshore wind blade plant that opened in 2016 and was expanded by a further Β£186m in 2021-23 to build 108-metre B108 IntegralBlades for the SG 14-222 DD offshore turbine.
Named counterparties identified by open-source research and written only where a primary source states the relationship β never inferred from sector or co-mention. 1 customer-side. This is a partial view: it covers the relationships we could evidence, not the company's full supply base.
RWE press release: Hull factory is producing 108m B108 IntegralBlades for all 100 of the 14MW turbines on RWEs 1.4GW Sofia Offshore Wind Farm (300 blades total); no share of Hulls overall output or revenue is disclosed. Also already named in this dossiers body text alongside Dudgeon, Beatrice, Triton Knoll, Hornsea One/Two and Moray West, but no source names those projects specifically as Hull-blade customers -- RWE/Sofia is the only one with a primary citation confirming the Hull link, so it is the only one recorded here.
Scope. Absence of a counterparty here is not evidence that none exists β most commercial sourcing is confidential and never becomes public. Rows without a share figure mean no share was disclosed, not that the relationship is small.
2 other tracked dossiers name this company as a counterparty in its own sourced disclosure β this platform never wrote these rows on this company's own page, they are read here inverted from the dossier that disclosed them. This is a partial view: 989 additional named-counterparty rows across the corpus could not be matched to a tracked dossier by name at all (mostly non-Latin legal names), so the true count is higher than what renders here.
Siemens Gamesa named as supplier of 14 SG 5.0-145 wind turbines for ACEN's Capa Wind project (Pagudpud); press release does not disclose contract value or share of ACEN's total capex.
Arafura ASX announcement: five-year NdPr offtake with Siemens Gamesa Renewable Energy A/S, contract volumes of NdPr metal 200 tpa commencing 2026, 360 tpa in year two and 400 tpa in years three to five, binding subject to conditions precedent (German UFK untied loan guarantee eligibility, completion of construction, commercial production) by no later than 30 September 2026. Nolans is in the Northern Territory, Australia; the NdPr is for magnets in turbines assembled at Siemens Gamesa's Cuxhaven, Germany facility. A not-yet-started offtake is not a purchase, so the route is recorded without a destination until deliveries begin. The earlier 520 t/y figure (secondary press) is not in the announcement and was dropped with its share_pct.
Scope. This section is inverted evidence: each linked dossier wrote the original row about itself, describing its own relationship to this company. It is never a claim this company itself disclosed. Absence here is not evidence of no relationship β most of the corpus has no named-counterparty block at all yet.
Every exposure is read as a buyer dependency by model default, not a company disclosure; the top 1 are its binding chokepoints. If this company actually produces one of these materials rather than buying it, that would be misclassified here β no producer-classifier entry exists for any of them.
As a buyer, policy pressure across its consumed materials is flat.
Descriptive trend in official policy actions on this companyβs materials β a policy-pressure trend, not a price or trading signal. No forward probability is implied. Direction is measured on actions we have discovered, and discovery lags events: where the recent window is too thin to support a calm reading, the row says coverage-limited instead of easing.
No actions in the register have named or swept this company in the last 24 months.