Loading…
Loading…
1 critical material scored · binding chokepoint: Manganese (🇨🇳 CN 90% of refining) · 12 restrictive government measures on record
Element 25 produces 1 of the 1 scored material above (Manganese). For those, a supply restriction by the controlling country is a tailwind, not a headwind — the exposure is to disruption of a market this company supplies, not to a chokepoint it depends on. Every scored material here sits on its output side, so the High · 83/100 band should be read as chokepoint salience, not as buyer vulnerability, and the Art. 24 input-side duties below are qualified accordingly.
Role from an explicit dossier role: tag or the producer-sector classifier behind the /minerals alternatives bench (one classifier on disk, generated 2026-10-06) — the same source the company page uses. A material the classifier has no entry for defaults to a buyer dependency, which can understate a producer's output side. Descriptive classification only: it enters no score.
The binding exposure is Manganese — 🇨🇳 CN controls 90% of global refining. On this company's production footprint that scores 83/100 (adversarial chokepoint; global 69). The register holds 12 restrictive government measures touching this company's materials — each traced to its primary source below.
Peer rank · Manganese Element 25 is the 19th-most-exposed of the 446 named companies we track on 🇨🇳 CN's Manganese chokepoint; the most-exposed is Rivian Automotive, Inc. (83/100). Ranked on the same footprint-adjusted buyer score as above — a relative read of an existing metric, not a new one.
Element 25 ranks 33rd of 449 verified mining metals companies, tied with 4 others at 83.
Company supply-risk index 83/100 — the binding chokepoint dominates, with a modest add for exposure breadth across 1 scored material. Buyer-relative (first-order): weighted by where the company produces (AU 100%, estimated split — no cited source states these exact shares), applied across all materials — it does not yet trace each input to its specific sourcing step.
> The exposure report this dossier powers is at > /intelligence/dossiers/element-25/report.
Element 25 (ASX: E25) is an Australian mining company whose flagship asset is the Butcherbird Manganese Project in the Pilbara region of Western Australia — a large, long-life manganese ore deposit (Ore Reserve of 101.4 Mt at 10.4% Mn per the 28 Jul 2026 ASX release) producing manganese oxide concentrate. Element 25 is pursuing a downstream pivot: alongside conventional concentrate sales into steel/alloy manganese markets, it is developing a high-purity manganese sulphate monohydrate (HPMSM) refinery in Louisiana, USA, to supply battery-grade manganese sulphate for lithium-ion EV cathode active material — with General Motors as a named offtake partner.
its entire business is manganese ore mining and, prospectively, manganese sulphate refining. No credible public evidence of exposure to other scored critical minerals (cobalt, nickel, copper, chromium, etc.) was found; those sector-default exposures inherited from the mining-metals auto-onboard have been removed as unverified.
concentration and (planned) refining stage of the manganese supply chain, not the battery-manufacturing stage. Its exposure to CRMA-style concentration and trade-policy risk runs through customer/offtake concentration (e.g. GM) and construction/permitting risk on the Louisiana refinery, rather than through upstream input scarcity.
From the company’s own filings and dated disclosures — top-5 concentration and related-party tables where the filer’s regime compels them, named supply and offtake agreements where it does not. This is a disclosure, not a netting: a named supplier concentration is shown beside the exposure score and never adjusts it. Figures are the fiscal years labelled, not a current snapshot.
Up to 32,500 t/yr battery-grade HPMSM from the planned Louisiana facility; GM provided an $85M construction loan. Facility not yet producing (ASX 28 Jul 2026). Trade press (May 2026) reported E25 reassessing the facility and discussing changes to the agreement amid shifting EV demand — not independently confirmed this pass.
Alternative track — a counterparty read from primary filings, never merged into the exposure score. Absence of a name is not absence of a relationship: Filers name only the counterparties their regime compels them to name, and several of this company’s largest are disclosed by size with no name at all.
Ranked by buyer-relative risk, highest first.
1 of 1 of your scored CRMA-strategic material breach the EU’s own Art. 5 65% single-third-country ceiling (global-production proxy).
| Material | Controlled by | You | Global | Band | Art. 5 | Input share | Substitute | Laws | Trend |
|---|---|---|---|---|---|---|---|---|---|
| Manganese | 🇨🇳 CN 90% refining | 83 | 69 | High | EXCEEDS 90% |
Per-material factor scoring on a 1–5 likelihood×impact scale, mapped to the Art. 24(2)(b) risk-factor framework. The headline score above is a portfolio RAG; this matrix is the assessment — it is where two companies with the same binding chokepoint diverge.
| Material | Geopolitical | Concentration | Price / market | Substitutability | Import reliance | Logistics · ESG · Supplier |
|---|---|---|---|---|---|---|
| Manganese | 4 | 4 | 1 | 5 |
Every new filing and every amendment (rate change, scope change, repeal) touching this company's materials in the window above. Append ?since=YYYY-MM-DD to this URL for a custom start date.
Restrictive government measures on this company's materials, newest first — each links to its primary government source.
The Art. 24(2)(c) vulnerability assessment, made explicit. For each leading exposure we model the move in this company's buyer-relative score under two distinct supply-disruption scenarios — the production footprint held fixed, only one lever moved at a time so each delta isolates one shock:
| Type | Scenario | Today | Stressed | Δ |
|---|---|---|---|---|
| Policy | Manganese — 🇨🇳 CN escalates manganese controls to a full export-licensing / ban regime | 83 | 88 | +5 |
| Concentration |
No material crosses the significant-vulnerability threshold on the input side — every scored material here is one Element 25 produces, and Art. 24 addresses the use of a strategic raw material as an input. The Art. 24(4) mitigation duty is not triggered on the public-source evidence; the mitigations below are precautionary.
Reported separately (not an Art. 24(4) trigger): Manganese clears the same numeric bar but is a material Element 25 produces. That is an output-market concentration — relevant to revenue and to counterparties who buy from this company — not an input dependency the company must mitigate under Art. 24(4).
Stated threshold (so the conclusion is reproducible and auditable): buyer-relative band ≥ High AND substitutability hard/none AND ≥ 1 in-force restrictive measure on the material, assessed over the 0 materials this company buys (the 1 it produces are excluded from the test and listed above). The CRMA does not fix a numeric definition of “significant”; the company may adopt a stricter or looser threshold and should record it here.
Proposed, announced or draft regulation that is not yet in force but would touch this company's at-risk materials if it passes. Forward-looking early-warning — the likelihood shown is an honest band derived from the legislative stage, not a forecast or a fabricated probability. Kept separate from the enacted register above: nothing here is law yet.
Forward-looking read on the binding chokepoint, from the recent trajectory of policy on these materials. Directional, not a forecast.
Every scored material here is one Element 25 produces, so the Art. 24(4) buyer levers — qualify an alternative supplier, re-source, substitute the input — do not apply to this company. The output-side items below are what a concentrated producer's risk office actually acts on. We render them rather than a generic diversification list because a prescription addressed to the wrong side of the market is worse than none.
Under the EU Critical Raw Materials Act (Reg. (EU) 2024/1252), a Member State identifies the large companies (Art. 2(29): >500 employees and >€150M net worldwide turnover) using strategic raw materials to manufacture a listed strategic technology (batteries, renewables, hydrogen, traction motors, heat pumps, aircraft, data-storage equipment, robotics, drones, satellites, advanced chips). Those companies must, at least every three years and to the extent the information is available to them (Art. 24(2)), assess their strategic-raw-material supply chain. Where suppliers do not provide the data on request, the assessment may rely on the Commission's monitoring dashboard (Art. 20(4)) or other publicly available information (Art. 24(3)) — which is the evidence base this report assembles. Board reporting (Art. 24(5)) is voluntary unless the Member State mandates it (Art. 24(6)).
| CRMA provision | Obligation | Where addressed |
|---|---|---|
| Art. 24(1) | Member State identifies the company as in-scope (uses an SRM to make a listed strategic technology). | Scope & applicability |
| Art. 24(2)(a) | Map where the strategic raw materials are extracted, processed and recycled. | Exposure register + Supply-risk factor analysis |
| Art. 24(2)(b) |
Article 24 applies only when both size thresholds are met and a Member State has identified the company as making a listed strategic technology with strategic raw materials.
| Threshold test | This assessment |
|---|---|
| Average employees (last FY) > 500 | company input |
| Net worldwide turnover (last FY) > €150M | company input |
| Uses a strategic raw material as an input | company input — all 1 scored SRM here is one this company produces, not buys; input use is not evidenced by this assessment |
| Manufactures a listed strategic technology | mining-metals (confirm against Annex) |
| Formally identified by a Member State authority | company input |
Production-concentration figures: USGS Mineral Commodity Summaries 2026 + the production dataset behind each material page. Policy measures trace to the primary government sources below.
Each material's global supply-risk index blends five weighted factors: concentration of refining/processing (35%), active trade-control & policy pressure (25%), import reliance (15%), substitutability (15%), and price stress (10%). The buyer-relative score then scales the relational factors (concentration / policy / import) by this company's production-footprint alignment against each material's controlling country — bloc-neutral factors (substitutability, price) are left intact.
Caveats. The footprint is the company's assembly / manufacturing geography applied uniformly across all materials — a first-order proxy, not per-material input tracing. Scores are an analytical judgement on public data with a transparent weighting, not a market forecast or investment advice. Production shares reflect 2024-2025 figures and the policy position as of 2026-09-30; the register is continuously maintained and should be re-pulled against each new policy action.
MACROLENS · CICONIALABS · GEOPOLITICAL SUPPLY-RISK REPORT (EU CRMA ART. 20–25) · report generated 2026-10-06
Tip: the change log above defaults to the last 30 days. Append ?since=YYYY-MM-DD to this URL for a custom start date (e.g. ?since=2026-04-01).
This is a description of the actual automated pipeline (verifiable against this repo's own cron schedule), not a contractual commitment.
Same sector_primary, ranked on the company supply-risk index. Restricted to hand-verified dossiers — 127 further mining metals companies are tracked but auto-onboarded, and excluded here because their exposure list is a sector template rather than company research. A peer scoring lower is the useful read: it usually means a different production geography or a qualified second source.
no satisfactory substitute in major steel applications) vs. the newer battery-grade HPMSM market tied to US/EV policy support (the Louisiana project was selected for a US Department of Energy grant), giving the company two distinct demand and policy exposures on the same ore base.
planned downstream refining capacity in the United States (Louisiana), making it relevant to both AU critical-minerals policy and US Inflation Reduction Act / DoE battery-supply-chain funding streams.
Note: current construction/operational status of the Louisiana refinery and latest Butcherbird production figures were not independently cross-checked against Element 25's own ASX filings for this pass — treat as directionally current, not as-of-today confirmed. Trade press (gmauthority.com, May 2026, not independently fetchable — 403 as of 2026-10-03) reported Element 25 reassessing the Louisiana facility and discussing changes to the GM agreement amid shifting EV demand; unconfirmed this pass, flagged not asserted.
| High |
| none |
| 12 |
| ▲ rising |
You = buyer-relative score (this company's disclosed footprint vs. the controller). Global = buyer-agnostic supply risk. Substitute = ease of swapping the material out (none = locked in). Input share = the material's disclosed magnitude in the company's input basket (HIGH/MED/LOW only where a public filing quantifies it; — = unrated). Descriptive effect-size, never scored.
Art. 5 = does the global top single-country share breach the EU's own CRMA Art. 5 diversification ceiling (no more than 65% of a strategic raw material from a single third country)? A conservative global-production PROXY for the EU-import denominator — descriptive only, sits beside the score, never merged into it (— = non-strategic material). Reg. (EU) 2024/1252 Art. 5 ↗
| 3 |
| company input |
1 = very low … 5 = very high — a standard supply-risk likelihood×impact scale (the form a competent authority expects for the Art. 24(2)(b) factor analysis, not a CRMA-numbered scale). Public-source factors are pre-filled from the engine's primary sources (USGS concentration, IPTM government actions, EU import data); the three rightmost factor categories need company / Tier-1 supplier data and are flagged as input under Art. 24(3). Hover any cell for its evidence.
| Manganese — 🇨🇳 CN becomes the single source for manganese — the second source is lost (full 90%+ monopoly) |
| 83 |
| 88 |
| +5 |
A zero delta means that lever is already modelled at maximum on that material — today's score already prices it in. This is why the two scenarios are shown together: where a material's policy lever is already maxed (zero policy delta), the concentration shock still carries a real delta, and vice-versa. Each stressed score isolates its one lever; all other factors are held at current values.
Bills at introduction (pre-committee) in US historically become law ~5% of the time (n=37,132, GovTrack — 117th–118th Congresses) — a base rate for comparable bills, not a forecast for this one. source ↗
Bills at out of committee in US historically become law ~21% of the time (n=1,687, GovTrack — 117th Congress (2021–2023)) — a base rate for comparable bills, not a forecast for this one. source ↗
Likelihood band is derived deterministically from the legislative stage (announced → low; draft-published / in-consultation → moderate; passed-committee → elevated; passed-vote / awaiting-signature → high) — a reproducible, source-traceable proxy, not a probability estimate. Where shown, the modelled impact-if-passed re-uses the same buyer-relative stress engine as the enacted scenarios above: it holds this company's production footprint fixed and escalates the proposed measure to a full export-licensing / control regime — the conservative upper bound for a measure that may pass only as a partial cap. The delta is the move from today's score to that stressed score; companies with no modelled production footprint show no delta.
| Analyse the factors that might affect supply. |
| Supply-risk factor analysis (factor matrix) + The laws that threaten it |
| Art. 24(2)(c) | Assess vulnerabilities to supply disruptions. | Stress test + significant-vulnerability conclusion |
| Art. 24(3) | Where supplier data is unavailable, rely on Commission (Art. 20(4)) / public sources. | This report's basis — see Methodology & sources |
| Art. 24(4) | Where significant vulnerabilities are found, assess diversifying or substituting. | Significant-vulnerability conclusion + Priority mitigations |
| Art. 24(5)–(6) | Report results, sources, significant risks and mitigations to the board. | This document — board-ready, PDF-exportable |
This report pre-fills the Art. 24(3) public-source half of the assessment. The company-specific inputs — employee/turnover thresholds, bill-of-materials volumes, the tiered supplier map, and formal board adoption — remain the company's to complete; they are flagged as “company input” where they appear.