Loading…
Loading…
Anchored on the GrantConnect contracted value (measured, grants.gov.au): AUD 15,618,958.30 to Lynas Kalgoorlie Pty Ltd, and the press-reported ~50% cost-share figure (stated, Kitco). Severity 2, below the 2021-02-01 DOD Lynas Texas award (severity 3), because this funds a single onshore refining-process upgrade rather than establishing new separation capacity, and the announced amount (AUD 14.8M / USD ~11M) is smaller in scale.
Grant issued under the Modern Manufacturing Initiative's Manufacturing Integration Stream (Resources Technology and Critical Minerals Processing Priority, Round 1), administered by the Department of Industry, Science and Resources. Funds go to Lynas Kalgoorlie Pty Ltd to commercialise a new Rare Earth Carbonate Refining Circuit — a process developed to refine rare earth ore from Lynas's Mt Weld, WA deposit with lower chemical consumption and cost, to be installed at the Kalgoorlie processing facility under construction at the time. GrantConnect records the grant term as 29 October 2021 to 8 May 2024.
midstream processing, alongside the contemporaneous US DOD/DOE Lynas and rare-earth-processing awards in this register (see 2021-01-20-us-doe-fecm-rare-earth-processing-foa and 2021-02-01-us-dod-lynas-lree-processing-texas).
earths processing plant.
contracted value (AUD 15,618,958.30) differ by roughly AUD 0.8M; likely a GST or scope adjustment between announcement and signed grant deed, not independently confirmed.