Loading…
Loading…
Spain notified the Commission of a EUR 700 million horizontal scheme under CISAF Section 6.1 (Clean Industrial Deal State Aid Framework, adopted 25 June 2025), the strand that lets Member States subsidise new manufacturing capacity for net-zero technologies rather than decarbonising existing output. Eligible technologies mirror the CISAF Annex II list already seen in peer approvals (Italy SA. unpublished, Hungary SA.120705, Germany SA.121215, Greece SA.117469, Luxembourg SA.120921, France SA.120765): batteries, solar panels, wind turbines, heat pumps, electrolysers, and carbon capture, storage and utilisation (CCUS) equipment, plus production of the critical raw materials that feed these product lines. Aid is delivered as direct grants, open to projects anywhere in Spain, grantable until 31 December 2028. The Commission assessed the measure under Article 107(3)(c) TFEU and found it necessary, appropriate and proportionate under CISAF criteria.
This is a separate approval from Spain's EUR 408 million SA.119880 scheme (filed 2025-12-15 in this register), which was notified and approved five weeks later under CISAF Section 5 to fund electrification, hydrogen switching, waste-heat recovery and CCUS retrofits inside existing industrial processes. Together the two schemes give Spain roughly EUR 1.1 billion in CISAF-backed industrial capital: SA.119884 for building new clean-tech product lines, SA.119880 for cutting emissions in incumbent heavy industry (chemicals, ceramics, paper, metallurgy).
decarbonisation-retrofit at EUR 408m), matching the pattern seen in Germany, Italy and France of running parallel schemes rather than a single combined instrument.
scheme explicitly extends aid eligibility to production of the critical raw materials feeding battery, solar and electrolyser manufacturing — relevant to the EU's CRMA onshoring push and to lithium/polysilicon supply-chain diversification away from China.
potential exposure to Spanish beneficiaries once individual awards are disclosed.
checking the EC competition-cases database for backfill.
Bulgaria and Slovenia have done.
Spain's regions and whether any single project draws the EUR 200m per-project cap seen in the sister scheme.