What they make, where they produce, the materials that matter — then what is coming, what it would do to the business, and the moves available. Sector: utility energy. Company profile →
Hera Group is Italy's largest multi-utility, headquartered in Bologna and publicly listed (Borsa Italiana: HER). It runs regulated waste management (Italy's largest treater by tonnage, ~7.6m tonnes/year), water services (second-largest nationally, ~3.
6m customers), gas distribution (third-largest, ~1.8m customers) and electricity distribution (fifth-largest, ~16.3 TWh sold to ~2.5m customers) across Emilia-Romagna, Friuli-Venezia Giulia, Marche, Tuscany and Veneto. It is expanding a company-owned photovoltaic generation fleet — including the 9 MW Bondeno park near Ferrara (inaugurated 2024, ~9 hectares) — as part of a stated buildout toward 300+ MW of solar capacity. A separate agrivoltaic project (Cesena, via the Horowatt joint venture) is distinct from Bondeno, which is a conventional ground-mounted array.
Verbatim from the dossier's “What they do” section — sources on the company profile.
This is where Hera Group S.p.A. produces — approximate output shares from its dossier — not where it sells. Sales geography is not yet in our corpus for any company, so we cannot compute exposure to measures that bite on where products ship: an extraterritorial re-export rule follows the shipment and its material content, not the factory. Where such a measure touches its materials, the policy sections below flag it — but its sales-side incidence is not computable yet, and we say so rather than substitute the production map for it.
Of everything in its products, we track the critical inputs — the materials whose supply is concentrated in few countries, policy-exposed, or hard to substitute — because those are the ones a single measure can move. Each carries its role in the product, quoted from the dossier's own exposure note.
Silicon — structural component, but only within Hera's own (small, growing) generation fleet, not its core distribution/waste/water business. Crystalline-silicon photovoltaic cells are the base material of the solar plants Hera is building and operating (e.
Silver — trace additive. Silver-paste front/back electrode contacts are standard in crystalline-silicon PV cells; Hera's exposure here is a small per-panel quantity across its PV fleet, not a bulk input.
Scope. The non-critical remainder of the bill of materials — structural steel, polymers, glass and the like — is not tracked here because it is not supply-constrained: this section covers the constrained inputs, which is where policy risk concentrates, not a full bill of materials.
The top 5 are ranked mechanically — what the instrument does (its transmission class: an export ban is not a reporting duty), × how close to law (stage-derived likelihood band, never a probability) × how much of your tracked bill of materials it touches. Each unfolds as a chain: trigger → what it hits → the response the instrument actually calls for. A measure touching a material you produce can be an opportunity, not a threat.
TZ · stage awaiting-signature → high likelihood · touches silicon · flagged 28 Jun 2026, 101d pending
The same Finance Bill 2026/27 already tabled (Parliament-passed 23 June 2026, effective 1 July 2026) inserts a NEW export levy of "10% of the FOB value of the cargo OR TZS 200 per kilogram, whichever is higher" on exports of quartz minerals (HS 25. 06) and feldspar (HS 2529. 10. 00) via amendment to the Export Tax Act, Cap. 196 — a distinct beneficiation-forcing EXPORT-TAX instrument that pushes raw quartz/feldspar exporters toward in-country value-addition. 196), and neither existing entry mentions it; (2) material-relevant — quartz HS 25. 06 covers high-purity/silica quartz feeding the silicon→semiconductor/solar value chain, so a Tanzanian export tax re-prices a raw-silica supply node; the same "rocks to riches" beneficiation logic Tanzania applies elsewhere; (3) part of the wider African raw-mineral-export-tax wave (cf. Zimbabwe 10% lithium-concentrate levy, Namibia unprocessed-mineral ban, Guinea bauxite reference price).
source ↗Silicon — structural component, but only within Hera's own (small, growing) generation fleet, not its core distribution/waste/water business. Crystalline-silicon photovoltaic cells are the base material of the solar plants Hera is building and operating (e.
This changes the form of what TZ exports, not whether you can buy: raw/unprocessed exports are restricted while domestically processed material stays available — that is the measure's own mechanism. Your TZ-origin raw feed becomes processed-only; the route is a value-added purchase or a TZ processing partner, not a supplier switch.
Secondary — only if you need to avoid TZ entirely: silicon supply outside TZ is 🇨🇳 CN 86%, 🇧🇷 BR 3.9%, 🇳🇴 NO 2.8% (shares renormalised after removing TZ).
PE · stage passed-committee → elevated likelihood · touches silver · flagged 14 Jun 2026, 115d pending
Reduces maximum idle-concession period from 30 to 15 years (initial production deadline unchanged at 10 yr; penalty extension cut from 20 yr to just 5 yr); eliminates irrevocable legal status of mining concessions for first time in Peruvian law history, making concessions revocable by administrative authority; introduces higher annual fees and stronger production/investment requirements; threatens legal certainty for Peru's undeveloped copper and silver project pipeline — Peru = #2 copper, #4 silver, #1 lead, #2 zinc globally
source ↗Silver — trace additive. Silver-paste front/back electrode contacts are standard in crystalline-silicon PV cells; Hera's exposure here is a small per-panel quantity across its PV fleet, not a bulk input.
The filed text doesn't state this instrument's mechanism clearly enough to classify, so we don't guess a response — the measure text above is the read.
EU · stage awaiting-signature → high likelihood · touches silicon · flagged 15 Jun 2026, 114d pending
Establishes the first legally binding "safe level" benchmark for EU strategic stocks of each of the 17 strategic raw materials listed in the CRMA Annex I; benchmarks used as reference by Member States, financial institutions, and industrial consumers to assess strategic supply risk; mandated every 2 years, so this is the first edition setting the baseline; informs CRMA Art. 23 monitoring obligations and is the evidential basis for Art. 24 corporate-reporting thresholds
source ↗Silicon — structural component, but only within Hera's own (small, growing) generation fleet, not its core distribution/waste/water business. Crystalline-silicon photovoltaic cells are the base material of the solar plants Hera is building and operating (e.
This is a reporting / disclosure obligation — it does not prohibit importing from anywhere, so there is no supplier to switch and we list none. What you must do is what the measure's own text above describes: map the supply chain it covers, run the audit, and file. Its text states no filing deadline — we don't invent one.
Mapping your supply chain is exactly the work this obligation requires — your MacroLens exposure report is that map's starting point.
BO · stage draft-published → moderate likelihood · touches silver · flagged 17 Jun 2026, 112d pending
New general mining law (distinct from PL-157 lithium/evaporites bill already in index): 20-year tax stability regime for mining projects; eliminates the 12. 5% impuesto adicional IUE-RM on extraordinary commodity-price gains; retains 25% company profits tax (IUE) and 5% royalty; streamlines licensing from current 9–15 years to international norms; enables association contracts between private companies and cooperatives; coordinated with a forthcoming general investment law incorporating fiscal and non-fiscal incentives; framed around reversing 15+ years of investment drought; backing from World Bank; bill to be presented to Asamblea Legislativa Plurinacional after Mining Summit (May 18–20, 2026); target: executive submission late July 2026
source ↗Silver — trace additive. Silver-paste front/back electrode contacts are standard in crystalline-silicon PV cells; Hera's exposure here is a small per-panel quantity across its PV fleet, not a bulk input.
The filed text doesn't state this instrument's mechanism clearly enough to classify, so we don't guess a response — the measure text above is the read.
EU · stage in-consultation → moderate likelihood · touches silicon · flagged 15 Jun 2026, 114d pending
Second wave of CRMA Art. 14 strategic projects (drawn from 160+ applications: 95 EU-domestic + 66 third-country including 40 from strategic-partnership countries) gains fast-track permitting (27-month EU cap, 15-month Member State cap), EIB/EBRD financing-hub priority, and off-taker certainty; 75 battery-value-chain projects + 21 REE-for-permanent-magnets in pool; widens the EU's 2030 extraction/processing benchmarks pipeline beyond the first 60 projects
source ↗Silicon — structural component, but only within Hera's own (small, growing) generation fleet, not its core distribution/waste/water business. Crystalline-silicon photovoltaic cells are the base material of the solar plants Hera is building and operating (e.
This is support, not a threat — it funds, fast-tracks or relaxes rather than restricts. If you have operations, projects or purchases inside its scope, check your eligibility against the measure's own text above.
The Energy and Mineral Resources Ministry (ESDM) and Ministry of Finance announced May 11, 2026 that the implementation of higher tiered royalty rates under Government Regulation (PP) 19/2025 — cover…
1 of 22 filed an explicit in-force stage; the rest (flagged below) default from an absent stage: field, not a filed assertion. Each links to the register entry with its primary source.
For a material it buys, a restriction tightens supply and raises input cost — a headwind. Scores are footprint-adjusted and buyer-relative (0–100, higher = more exposed).
Its sector (utility energy) has no downstream edges in our supply-chain adjacency graph — no downstream signal in the register.
For each bought material: the ex-controller producers a procurement team can actually reach, from the alternatives map (derived 2026-10-07), viability-gated — each name carries its deployment status (with the verbatim dossier phrase it rests on), a capture check against the measure being escaped, and any contracted-capacity evidence. Deployable-now names sort first; a developer with zero tonnes is shown demoted, never dressed up as a switch you can make today. Tradability is inherited from the listing layer, never guessed.
+36 more tradable names, ranked below these by the same gate.
lib/policy-transmission.ts): an export prohibition in the measure's name/text → supply restriction; a raw/unprocessed-export limit or local-processing mandate → beneficiation (form change, not unavailability); reporting/disclosure/due-diligence language → compliance obligation; tariff/trade-remedy language → import cost; subsidy/fast-track/relaxation language → support; investment-screening/M&A language → investment control. When the text carries no signal we fall back to the action-type default and label the chip inferred; when neither exists the card says so and derives no response — we never assert a class the evidence doesn't support.lib/iptm-material-country-production.ts; mining stage preferred, refining as fallback — the stage and source year are in each figure's hover text). Ex-issuer supply removes the ISSUING country and renormalises the remaining listed shares (so they sum to 100% of what's left) — alternatives to the country making the rule, never a default ex-China list. Where the issuer holds no measurable share, the card says so plainly instead of implying supply loss.lib/alternative-viability.ts): each named alternative carries a deployment status — operating / ramping / restarting / development / unknown — derived from word-boundary signal phrases in its own dossier (“operating since 1896”, “restarting the … mine”, “FID taken”), and the verbatim matched phrase is shown as the basis so the claim is auditable; a dossier with no signal stays unknown, never guessed. Any evidenced production date is quoted verbatim (“first production targeted H2 2029” → “no tonnes before 2029”) — we never synthesize one. A measure whose own text claims extraterritorial / re-export / de-minimis / foreign-direct-product / percentage-of-value scope triggers the origin-switching warning above the list: such a rule follows the material, not the seller, so a foreign-made alternative can still be captured. Same-issuer register actions targeting an alternative's country and material mark it may be captured, with the entries linked. “Capacity partly committed” lines quote the dossier verbatim — we hold no structured free-capacity numbers and never imply a utilisation figure.How MacroLens tracks this for you. The policy register files new measures daily and this page recomputes from it — the same chokepoints are monitored live on the watchlist and in the full register.