Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
On 8 October 2025 the Australian Government (Albanese) and Queensland Government (Crisafulli) jointly announced up to AUD 600 million in co-funding — split evenly at AUD 300 million each — to keep Glencore's Mount Isa copper smelter and Townsville copper refinery operating through at least 2028. Funding is structured as three tranches of up to AUD 200 million released over three years, contingent on completion of a transformation study and further review points. The package protects more than 600 direct jobs at the smelter/refinery plus roughly 500 further jobs at the adjacent Phosphate Hill facility, and preserves roughly half of Australia's total copper smelting capacity. It follows Glencore's October 2023 announcement of intended closure and a July 2025 end-of-operations notice, with Glencore describing the deal as a short-term lifeline after absorbing sustained financial losses.
President Trump signed Proclamation 10962 on 30 July 2025, imposing a 50% Section 232 tariff on imports of semi-finished copper products (pipes, wires, rods, sheets, tubes, foils) and copper-intensive derivative products (cables, connectors, electrical components, pipe fittings) effective 12:01 a.m. ET on 1 August 2025. The proclamation also authorises the Commerce Secretary to impose a 25% domestic-sales requirement and export controls on high-quality copper scrap, and lays out a phased schedule for refined-copper tariffs (15% from 1 Jan 2027, 30% from 1 Jan 2028) contingent on a Commerce review report due 30 June 2026. Copper input materials (ores, concentrates, cathodes, anodes) and copper scrap itself are exempt from the 50% tariff. The original 90-day "inclusions" process for expanding the derivative list was terminated by a follow-on April 2026 proclamation that consolidated authority with Commerce + USTR.
South African Cabinet on 20 May 2025 approved the publication of the Draft Mineral Resources Development Bill (MRDB) 2025, gazetted by Minister of Mineral and Petroleum Resources Gwede Mantashe to amend the Mineral and Petroleum Resources Development Act (MPRDA). The Bill streamlines mining-rights administration by aligning with NEMA and the National Water Act, introduces a new licensing regime for artisanal and small-scale mining, and acts as the legislative implementing instrument for the Critical Minerals and Metals Strategy approved at the same Cabinet sitting. Public-comment window ran through 13 August 2025; the Bill has not yet been enacted.