Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
The Ecuadorian National Assembly approved on 26 February 2026 (vote 77-70, urgent-economic-matter procedure) the Ley Orgánica para el Fortalecimiento de los Sectores Estratégicos de Minería y Energía, the statutory complement to President Daniel Noboa's Decreto Ejecutivo 273 of 31 December 2025. The law was published in the Quinto Suplemento of Registro Oficial on 2 March 2026 with no presidential objection and entered into force the same day. It comprises 28 articles, two general provisions and one transitory provision. The mining title codifies the 3–8% sliding royalty scale and channels 60% of royalty receipts to social investment via decentralised governments (45% provincial / 35% municipal / 20% parochial) — the legislative anchor for the regime introduced by Decree 273. The energy title amends the Ley Orgánica del Servicio Público de Energía Eléctrica to recognise distributed generation, self-supply and autonomous energy districts, and establishes exception-route participation for foreign state-owned enterprises and popular/solidarity-economy organisations alongside private capital. A controversial Galápagos-adjacent provision permitting expedited mining/energy procedures has triggered domestic constitutional challenge.
President Daniel Noboa signed Executive Decree 273 on 31 December 2025 (effective 1 January 2026), the most significant overhaul of Ecuador's mining regulation since the 2009 Mining Code. The decree amends the Reglamento General a la Ley de Minería to (i) replace the fixed 3–8% royalty range with a price-indexed sliding scale tied to a trailing three-year LME reference price, (ii) require all mining projects to supply 100% of their electricity needs (no grid draw), (iii) tighten exploration-phase timelines and introduce automatic extinction of concessions where activities do not begin in time, (iv) modify royalty-deduction rules so gold/silver royalties are computed on gross revenue without deductions while small/medium operators of other metals can still deduct refining/transport/benefit costs, and (v) allocate 60% of mining royalties to social projects via decentralised governments (45% provincial, 35% municipal, 20% parochial). The decree was published in Registro Oficial Suplemento 195 of 31 December 2025 and is not retroactive.
On 23 April 2025 CMOC Group (HKG:3993) announced the acquisition of TSXV-listed Lumina Gold Corp — 100% owner of the Cangrejos (Los Cangrejos) gold-copper project in El Oro Province, southwestern Ecuador — via a court-sanctioned plan of arrangement at C$1.27/share (C$581M / ~USD 420M); the transaction closed on 24 June 2025 through a Singapore subsidiary, making Cangrejos Ecuador's largest primary gold deposit under full Chinese operational control. On 27 April 2026 CMOC's Ecuadorian subsidiary ODIN Mining del Ecuador signed a 26-year exploitation contract with Ecuador's Ministry of Energy and Mines committing >$1.7B in total investment (~$54M advance royalties, $34M paid on signing); commercial production is targeted for 2028 at ~11.5 t/yr gold (~370,000 oz/yr), making the state-projected total revenues $4.39B over the mine life. The acquisition extends CMOC's critical-mineral portfolio — anchored in DRC cobalt/copper — into Ecuadorian gold and copper, concentrating a globally significant undeveloped gold-copper deposit under Chinese operational control ahead of the competing 2026 Ecuador–US Critical Minerals Bilateral Framework.
President Daniel Noboa signed Executive Decree 435 on 23 October 2024, creating the Comité Nacional de Integridad del Sector Minero (CONIM) as a permanent inter-institutional coordination body chaired by the Secretaría General de Integridad Pública and composed of eight ministries plus SRI and UAFE, with a mandate to develop annual sector-risk assessments, formulate strategic action plans, and coordinate joint operations against illegal mining. The decree also orders ARCOM to update and reopen the Catastro Minero Nacional within six months (deadline 23 April 2025), the first cadastre reopening since the 2018 closure, sequentially executed as: small non-metallic mining (June 2025), metallic mining (September 2025), and all regimes (end 2025). This is the foundational executive instrument anchoring the post-2018 Ecuadorian mining-FDI revival pipeline and an IMF-EFF conditionality item for the 2026 reform cycle.