Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
Kazakhstan's Department of Atomic Energy signed a new Subsoil Use Agreement (SUA) for production at the Akdala uranium deposit, effective 29 March 2026, replacing the expired March 2001 contract. Subsoil rights are held by YUGHK LLP (South Mining and Chemical Company Joint Venture), in which Uranium One (a Rosatom subsidiary) owns 70% and Kazatomprom 30%. The deposit holds approximately 1,500 tonnes of uranium reserves and is expected to operate through 2030, after which the asset is subject to trust management transfer to Kazatomprom as the national company. The renewal was signed expressly to prevent disruption to the technological process and maintain social stability in the region, preserving Rosatom's controlling stake in a single producing Kazakhstani deposit at a time when Kazakhstan is otherwise tightening state control over strategic mineral assets.
The Kyrgyz Republic's parliament adopted on 13 June 2024 — and President Sadyr Japarov signed into law on 27 June 2024 — amendments to the Law "On Subsoil" (No. 49 of 19 May 2018) that lift the constitutional-status prohibition on geological exploration, prospecting, and development of uranium and thorium deposits enacted in 2019 under President Jeenbekov. The law simultaneously invalidates the standalone 2019 prohibition statute and introduces a voluntary state-equity transfer mechanism allowing mining-rights holders to transfer company shares to the state for strategically important gold and coal deposits. Together with the January 2024 Presidential Decree No. 5 (Polymetals and REE National Project), the amendment forms the second pillar of President Japarov's mining reset, re-opening the Kyzyl-Ompol uranium-REE-ilmenite deposit in Issyk-Kul oblast (est. 2,000+ tU resource + significant Th₂O₃, REE, and ilmenite by-products) to Western and Asian operators for the first time since 2019.
On 27 December 2017 President Nursultan Nazarbayev signed Code No. 125-VI ZRK "On Subsoil and Subsoil Use," a wholesale recodification replacing the 2010 Subsoil Use Law that entered into force on 29 June 2018 (with certain provisions deferred to 1 January 2019). The Code establishes the licensing architecture for all mineral extraction in Kazakhstan — the world's leading uranium producer (~40% of global U₃O₈ output, ~22,000 tU/yr) and a top-11 oil exporter (~1.8 mbpd) — covering solid minerals, hydrocarbons, and uranium under a single codified framework. For solid minerals the Code introduces a liberalised "first-come first-served" auction-free licence model for non-strategic deposits and a state-tender model for strategic deposits, alongside subsoil-use rights transfer and pledge provisions governing all M&A in the sector. For uranium the Code codifies the National Atomic Company Kazatomprom's statutory role as state operator over all uranium blocks, with government priority pre-emption rights and mandatory Kazatomprom participation in all production licences. For hydrocarbons the Code establishes the concession and production-sharing framework governing the pre-salt Caspian mega-projects (Tengiz, Karachaganak, Kashagan) and the model contract architecture for petroleum products. Horizontal obligations — local Kazakh-content procurement floors, social-package requirements, and environmental-restoration mine-closure security — apply across all subsoil-use categories. Structurally this Code is the parent statute for every subsequently filed KZ action: the 2023-12-28 REE Comprehensive Plan and the 2025-12-26 Kazatomprom uranium-priority amendments both operate under delegated authority created by this Code.