Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
The European Commission approved France's €1.1 billion state aid scheme (SA.120765) under Section 6.1 of the Clean Industrial Deal State Aid Framework (CISAF), authorising a tax credit (Crédit d'Impôt Industrie Verte — C3IV) for strategic investments that add new cleantech manufacturing capacity in solar PV, onshore and offshore wind technologies, heat pumps, and battery technologies. The scheme is available across the whole of France until 31 December 2028 and is the eighth CISAF cleantech-manufacturing- capacity approval, bringing cumulative CISAF cleantech support to over €10 billion. It is the first CISAF approval delivered via a tax-credit instrument, distinct from the grant-based architectures used in the parallel Germany SA.121215, Greece SA.117469, and Luxembourg SA.120921 approvals.
The European Investment Bank signed a EUR 400 million, seven-year loan agreement with Swedish hygiene and health group Essity on 29 January 2026 (EIB project ref. 20210374, "Essity Health and Hygiene Products RDI") to finance research, development and innovation expenditure at Essity's R&D centres in Sweden, Germany and France over 2025-2028. The financing targets product and process development across Personal Care, Professional Hygiene and medical wound care, with emphasis on replacing fossil-based plastics with bio-based materials, cutting greenhouse-gas emissions and expanding digital manufacturing solutions; roughly 30% of the RDI spend is earmarked for feminine-care and incontinence-product research. Global Trade Alert separately logs the transaction as a "red"-flagged state-linked lending intervention (state act 96020 / intervention 151945).
The European Investment Bank signed a EUR 250 million unfunded partial-delegation risk-sharing operation with Natixis on 19 December 2025 (EIB project ref. 20240252, "Natixis Pan-EU Wind Power Package"), under the EIB's broader Pan-EU Wind Power Package Risk Sharing envelope (ref. 20230650, approved 13 December 2023, EUR 6.5 billion EIB exposure against a total programme size of roughly EUR 104 billion). Natixis will issue advance-payment and performance guarantees to original equipment manufacturers supplying wind farm components — turbines, grid-connection infrastructure, cables, transformer stations and sub-stations — against a total project cost of roughly EUR 4 billion, with the EIB citing an expected mobilisation of approximately EUR 8 billion in wind energy equipment investment across the EU. Global Trade Alert separately logs the transaction as a "red"-flagged state-linked lending-support intervention (state act 95948 / intervention 151841).
The European Investment Bank signed a strategic agreement with Crédit Agricole CIB on 28 November 2025 under which the EIB provides a EUR 500 million counter-guarantee, enabling Crédit Agricole CIB to build a portfolio of bank guarantees worth up to EUR 1 billion for clients supplying new European wind farm projects. The EIB cites an expected leverage of up to EUR 8 billion in real-economy investment across the wind supply chain and electricity grid by 2027, backed by InvestEU and forming part of the EIB's broader EUR 6.5 billion Pan-EU Wind Power Package. Global Trade Alert separately logs the transaction as a "red"-flagged state-linked lending-support intervention (state act 95159).
The European Investment Bank (EIB) signed a EUR 250 million financing package with Nexans SA on 31 July 2025 (project reference 20240854, "Nexans Recycling and Electrification Investment"; publicly announced 22 September 2025), against a total project cost of approximately EUR 382 million. The loan backs Nexans' 2024-2029 research, development and innovation programme for high-, medium- and low-voltage power cables, plus copper-recycling and manufacturing-capacity investments across France, Belgium, Sweden and Norway. The financing is structured as a EUR 190 million tranche carrying an InvestEU guarantee and a EUR 60 million second tranche.
On 18 June 2025 the European Investment Bank (EIB) and the BPCE banking group signed a EUR 300 million loan agreement to expand financing available to French small and medium-sized enterprises (SMEs) active in the security and defence supply chain, delivered through BPCE's Banque Populaire and Caisse d'Epargne networks. It is the first such operation the EIB has signed in France, and the second in Europe, under the EIB's Pan-EU Security & Defence Lending Envelope, which was expanded from EUR 1 billion to EUR 3 billion earlier in 2025 (a first tranche was signed with Deutsche Bank in Germany the preceding week). Funds are earmarked for SMEs investing in cybersecurity, surveillance, resilience, and defence technologies.
On 16 June 2025 the European Investment Bank (EIB) signed a EUR 1.6 billion loan facility with French and Spanish transmission-system operators RTE and Red Eléctrica to finance the Bay of Biscay electricity interconnection, the first submarine power link between the two countries. First tranches totalling EUR 1.2 billion were signed at EIB headquarters in Luxembourg; the project separately holds a EUR 578 million EU Connecting Europe Facility (CEF) grant. The 400 km link (300 km submarine, connecting Cubnezais, France to Gatika, Spain) will raise cross-border exchange capacity from 2,800 MW to 5,000 MW and is expected to enter service in 2028.
On 25 March 2025 the European Commission adopted the first list of 47 Strategic Projects inside the EU under Article 7 of the Critical Raw Materials Act (Regulation (EU) 2024/1252), followed on 4 June 2025 by 13 Strategic Projects located in third countries — 60 designations in total. The 47 EU projects span 13 Member States and 14 strategic raw materials, with an expected EUR 22.5bn capital-investment envelope; the 13 third-country projects require a further EUR 5.5bn. Designation triggers fast-track permitting (max 27 months for extraction, 15 months for processing/recycling), preferential access to EU/EIB/EBRD finance, and Member State priority status, operationalising the CRMA's 2030 benchmarks (≥10% extraction, ≥40% processing, ≥25% recycling, ≤65% single-country dependence).