Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
Indonesia's Ministry of Energy and Mineral Resources (ESDM) issued Ministerial Decree No. 144.K/MB.01/MEM.B/2026, effective 15 April 2026, fundamentally restructuring the Nickel Ore Benchmark Price (Harga Patokan Mineral, HPM) formula that governs the minimum domestic transaction price for ore sales from IUP/IUPK miners to downstream processors. For the first time the HPM uses a multi-element comprehensive pricing formula incorporating by-product credits for cobalt, iron, and chromium alongside nickel content, and raises the Correction Factor (CF) for 1.6%-grade ore from 17% to 30% (a ~76% increase), with an inverse-linear ±1% CF adjustment per ±0.1% grade variance. The reform also shifts HPM measurement from dry-metric-ton (US$/dmt) to wet-metric-ton (US$/wmt) with explicit moisture-content deduction, covers 10 minerals including bauxite, and replaces Kepmen ESDM No. 268.K/2025. The measure redistributes economic rent from the downstream Chinese-backed HPAL/RKEF processing complex toward upstream Indonesian miners, tightening margins across Indonesia's ~50%-of-global-supply nickel-ore industry.
Indonesia's Ministry of Energy and Mineral Resources (ESDM) confirmed it has officially cut the 2026 nickel-ore Work Plan and Budget (RKAB) production ceiling to 260–270 million wet metric tonnes (wmt), down from the ~379 million wmt approved for 2025 — a reduction of roughly one-third. Actual 2026 production is targeted at approximately 209–210 million tonnes. Minister Bahlil Lahadalia framed the cut as a supply-demand balancing measure to stabilise nickel prices and conserve reserves; the government first signalled the production control on 23 December 2025, after which world nickel prices rose from roughly US$14,800/t under oversupply to above US$17,000–18,800/t. This is the operative 2026 application of the annual RKAB cycle established by Permen ESDM 17/2025.