Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
The Union Cabinet chaired by Prime Minister Narendra Modi approved on 5 May 2026 two new semiconductor manufacturing units under the India Semiconductor Mission (ISM) Phase 1: Crystal Matrix Limited (CML) — India's first GaN-based compound-semiconductor and Mini/Micro-LED display fabrication facility (INR 3,068 crore, Dholera, Gujarat) and Suchi Semicon Private Limited (SSPL) — an OSAT facility for discrete semiconductors (INR 868 crore, Surat, Gujarat). Cumulative investment INR 3,936 crore (~USD 400mn); 2,230 skilled jobs at full ramp. This constitutes the 12th and final batch of ISM Phase 1 approvals, closing the first-phase envelope before ISM 2.0 (filed 2026-02-01) takes over.
On 1 February 2026 Finance Minister Nirmala Sitharaman tabled India's Union Budget 2026-27, with Customs Notification No. 02/2026-Customs (dated 1 Feb 2026, effective 2 Feb 2026) implementing the customs-duty package. The notification zero-rates basic customs duty (BCD) on (i) capital goods imported for domestic processing of critical minerals — crushing, beneficiation, refining, chemical-processing, separation/purification, and metallurgical/alloy-making equipment; (ii) capital goods for lithium-ion cell manufacturing for battery energy storage systems (BESS), extending the 2024-25 EV-cell exemption to stationary storage; and (iii) twelve additional critical minerals plus cobalt powder and lithium-ion battery scrap, on top of the 25 critical minerals already exempted in the FY2024-25 budget. In parallel, critical minerals (including monazite / rare-earth concentrate) are migrated from the customs-exemption notification mechanism into the First Schedule of the Customs Tariff Act at Nil BCD, effective 1 May 2026 — a tariffisation step that locks the rate into primary legislation rather than annually renewable notification. The Budget also commits to dedicated critical-mineral / rare-earth-magnet processing corridors in Andhra Pradesh, Odisha, Kerala and Tamil Nadu. Structurally this is the fiscal/tariff layer underneath the National Critical Mineral Mission (NCMM, Jan 2025) and the National Manufacturing Mission (Feb 2025): NCMM funds capex and overseas asset acquisition (₹34,300 cr), this Budget removes the import-duty drag on the equipment needed to actually run domestic processing lines. It complements the REPM scheme (Nov 2025) for sintered rare-earth magnets and Semicon Mission 2.0 (Feb 2026) on the demand side for refined critical minerals.
On 1 February 2026 Finance Minister Nirmala Sitharaman, presenting the Union Budget 2026-27, announced the launch of India Semiconductor Mission (ISM) 2.0 — the second-phase national semiconductor industrial-policy framework succeeding ISM 1.0 (2021, INR 76,000 crore). The Budget makes an initial INR 1,000 crore provision for ISM 2.0 in FY 2026-27 and raises the Electronics Components Manufacturing Scheme (ECMS) outlay from INR 22,919 crore to INR 40,000 crore. ISM 2.0's distinct architecture centres on four strategic priorities not in ISM 1.0: (i) indigenous semiconductor equipment, chemicals, gases and materials production, (ii) full-stack Indian semiconductor IP design, (iii) industry-led R&D and skills/training centres, and (iv) domestic and global supply-chain integration. Total mission outlay reported as approximately INR 1-1.2 lakh crore (~USD 12-14bn) is being finalised; Cabinet clearance and the formal scheme launch are expected by mid-2026.