Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
Kazakhstan's Department of Atomic Energy signed a new Subsoil Use Agreement (SUA) for production at the Akdala uranium deposit, effective 29 March 2026, replacing the expired March 2001 contract. Subsoil rights are held by YUGHK LLP (South Mining and Chemical Company Joint Venture), in which Uranium One (a Rosatom subsidiary) owns 70% and Kazatomprom 30%. The deposit holds approximately 1,500 tonnes of uranium reserves and is expected to operate through 2030, after which the asset is subject to trust management transfer to Kazatomprom as the national company. The renewal was signed expressly to prevent disruption to the technological process and maintain social stability in the region, preserving Rosatom's controlling stake in a single producing Kazakhstani deposit at a time when Kazakhstan is otherwise tightening state control over strategic mineral assets.
On 2 February 2026 Kazatomprom disclosed in its 4Q25 Operations and Trading Update that it had amended multiple Subsoil Use Agreements (SUAs) to reduce the total 2026 licensed annual production ceiling from 32,777 tU to 29,697 tU — a reduction of approximately 3,080 tU (~9.4%). The primary driver is construction and commissioning delays at the Budenovskoye uranium deposit (JV with Uranium Energy Corp / UrAsia, Kazatomprom 51%), preventing the planned ramp-up. Revised 2026 production guidance of 27,500–29,000 tU on a 100% basis sits below the revised licensed ceiling, indicating that actual deliveries will be further constrained; force-majeure notices were issued to long-term offtake counterparties affected by the Budenovskoye shortfall. Kazakhstan accounts for approximately 43% of global primary uranium mine supply, making even a licensed-capacity adjustment a material signal for the global U3O8 and UF6 supply curve.
On 27 December 2017 President Nursultan Nazarbayev signed Code No. 125-VI ZRK "On Subsoil and Subsoil Use," a wholesale recodification replacing the 2010 Subsoil Use Law that entered into force on 29 June 2018 (with certain provisions deferred to 1 January 2019). The Code establishes the licensing architecture for all mineral extraction in Kazakhstan — the world's leading uranium producer (~40% of global U₃O₈ output, ~22,000 tU/yr) and a top-11 oil exporter (~1.8 mbpd) — covering solid minerals, hydrocarbons, and uranium under a single codified framework. For solid minerals the Code introduces a liberalised "first-come first-served" auction-free licence model for non-strategic deposits and a state-tender model for strategic deposits, alongside subsoil-use rights transfer and pledge provisions governing all M&A in the sector. For uranium the Code codifies the National Atomic Company Kazatomprom's statutory role as state operator over all uranium blocks, with government priority pre-emption rights and mandatory Kazatomprom participation in all production licences. For hydrocarbons the Code establishes the concession and production-sharing framework governing the pre-salt Caspian mega-projects (Tengiz, Karachaganak, Kashagan) and the model contract architecture for petroleum products. Horizontal obligations — local Kazakh-content procurement floors, social-package requirements, and environmental-restoration mine-closure security — apply across all subsoil-use categories. Structurally this Code is the parent statute for every subsequently filed KZ action: the 2023-12-28 REE Comprehensive Plan and the 2025-12-26 Kazatomprom uranium-priority amendments both operate under delegated authority created by this Code.