Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
Argentina's Ministry of Economy issued Resolución 1254/2025 (Boletín Oficial, 27 August 2025) approving the adhesion of Generación Eléctrica Argentina Renovable I SA's dedicated branch ("GEAR I SDE") to the Régimen de Incentivo para Grandes Inversiones (RIGI) under Law 27.742, for the 180 MW "P.E. Olavarría" wind farm in Olavarría, Buenos Aires province. The declared total investment is USD 275.59 million (USD 255.11 million in computable assets), granting the project RIGI's 30-year tax, customs and FX-stability package. GEAR I SDE's accession dates to 25 July 2025; it must reach 40% of the minimum qualifying investment within two years and complete the minimum by 30 November 2027. The plant is designed to supply ArcelorMittal Acindar's Argentine steel plants directly rather than to export power, substituting an estimated 20% of national electricity consumption equivalent for the offtaker and qualifying for import-tariff relief on capital goods under Law 27.742 Article 190.
Argentina's Ministry of Economy issued Resolución 938/2025, amending Resolución 256/2000, the import-duty regime for capital goods that constitute large industrial investment projects. The amendment adds electric-energy-generation projects to the regime's eligible activities (previously limited to production lines), cuts the mandatory local-content purchase requirement to 10% of imports' total FOB value, extends the compliance window to one year after project approval, shortens the mandatory asset-holding period to 12 months after startup (or until guarantee release, whichever is first), and pushes the accounting/closeout deadline for pre-Dec-18-2024 pending projects to December 31, 2026. The measure took effect the day after its July 11, 2025 publication in the Boletín Oficial.
On 11 April 2025 President Javier Milei signed Decreto de Necesidad y Urgencia 269/2025, published in the Boletín Oficial on 14 April 2025 (edición Nº 35.647). The decree repealed Decreto 28/2023, formally lifting the cepo cambiario — the foreign-exchange restrictions that had been in continuous operation in some form since November 2011. Operative provisions include elimination of the 80/20 export-proceeds-channelling mandate, removal of individual USD purchase and wire-transfer caps, permission for companies to repatriate post-1-January-2025 dividend profits, and replacement of the daily crawling-peg with a band float within a $1,000–$1,400 ARS/USD corridor with BCRA floor/ceiling intervention rules. The measure was coordinated with the IMF Extended Fund Facility (USD 20bn total; USD 15bn 2025 free-availability tranche) approved 11 April 2025, and operationalises the currency-stability guarantee embedded in the RIGI large- investment regime (Law 27.742, July 2024).