Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
The Australian Renewable Energy Agency (ARENA) committed AUD 44.9 million to Calix Limited to build a demonstration plant for its Zero Emissions Steel Technology (ZESTY), targeting up to 30,000 tonnes per year of low-carbon hydrogen direct reduced iron (HDRI) and hot briquetted iron (HBI) using renewable electricity and hydrogen instead of coking coal. The funding builds on prior ARENA-funded engineering studies and also supports early-stage engineering for a larger commercial-scale ZESTY plant, positioning low-emissions iron/steel as a strategic priority industry for Australia.
The Australian Renewable Energy Agency (ARENA) committed AUD 19.8 million to the NeoSmelt joint venture to fund a front-end engineering design (FEED) study for a direct reduced iron-electric smelting furnace (DRI-ESF) pilot plant at Kwinana, Western Australia, aimed at proving Pilbara iron ore can be converted into lower-carbon iron without a coking-coal blast furnace. The consortium, founded by BlueScope, BHP and Rio Tinto, welcomed Woodside Energy and Mitsui Iron Ore Development as new equal-equity participants alongside the grant announcement. Total project cost is AUD 48.85 million, with the study running from May 2025 to August 2026 ahead of a targeted final investment decision.