Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
On 3 December 2025, Export Finance Australia (EFA) disclosed a €120 million (~AU$196 million) loan commitment to Vulcan Energy Resources' Phase One Lionheart Project in Germany's Upper Rhine Valley, which will produce battery-quality lithium hydroxide monohydrate (LHM) from geothermal brine while co-generating renewable heat and power. The loan is part of a syndicated, multi-country export-credit package alongside Germany's KfW Raw Materials Fund, the European Investment Bank, Export Development Canada, Denmark's EIFO, France's Bpifrance Assurance Export, and Italy's SACE, financing a project with total capital cost of ~€2.193 billion (~AU$3.9 billion). Phase One targets 24,000 tonnes per annum of LHM, enough for roughly 500,000 electric vehicles.
On 18 September 2025, the Australian Government published the Net Zero Plan 2050 and six sectoral emissions-reduction plans covering Electricity & Energy, Industry, Transport, Built Environment, Agriculture & Land, and Resources. The Net Zero Plan establishes the overarching policy architecture to achieve Australia's 62–70% emissions-reduction target (below 2005 levels) by 2035 and net zero by 2050, structured around five "CLEAN" strategic priorities. The six sector plans provide detailed decarbonisation pathways, capex envelopes, and policy-instrument linkages that frame operation of the Future Made in Australia Act, the Critical Minerals Production Tax Incentive, the Capacity Investment Scheme, and the Safeguard Mechanism for the following decade. The plans were released simultaneously with Australia's updated 2035 Nationally Determined Contribution submitted to the UNFCCC.
On 19 August 2025 the Australian Renewable Energy Agency (ARENA) opened applications for the Battery Breakthrough Initiative (BBI), an AUD 500 million capital-grant and production-incentive program to build domestic battery manufacturing capability across the value chain, from active materials to finished cells and packs. The program was first announced in the May 2024 Federal Budget as a pillar of the Future Made in Australia agenda and the National Battery Strategy, and is designed to strengthen supply-chain resilience by leveraging Australia's position as the world's largest lithium producer and a major nickel/cobalt/graphite supplier. Funding was subsequently cut to AUD 142.32 million in the 2026 Federal Budget (see amendments).