Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
The European Investment Bank signed its first-ever loan to N-ERGIE Aktiengesellschaft on 12 May 2026, a EUR 200 million long-term facility to finance renovation, reinforcement and digitalisation of N-ERGIE Netz GmbH's electricity distribution infrastructure in northern Bavaria, particularly the Nuremberg metropolitan region. The financing covers overhead lines, underground cables, substations, and network control/automation systems, and is intended to accommodate renewable-generation connection and rising electricity demand from electromobility and heat pumps over the 2025-2026 investment programme.
The European Investment Bank signed a EUR 600 million first tranche on 5 February 2026 of a EUR 1.9 billion total EIB financing commitment to Greece's Independent Power Transmission Operator (IPTO/ADMIE) for the Dodecanese Interconnection project, against a total project cost of approximately EUR 2.548 billion. The financing was approved by the EIB Board on 19 November 2025. The project builds two converter stations (Corinth and Kos), HVDC submarine cables linking Corinth to Kos, and further submarine power/fibre-optic links from Kos to Rhodes and Rhodes to Karpathos, ending diesel/heavy-fuel-oil-based electricity generation on the Dodecanese islands and connecting them to the Hellenic Electricity Transmission System.
The European Investment Bank approved a EUR 490 million loan on 12 December 2025 to Greece's Independent Power Transmission Operator (IPTO/ADMIE) to finance the North-East Aegean Interconnection project, which will connect the islands of Lemnos, Lesvos, Chios, Samos and Skyros to the mainland transmission grid via 150 kV AC subsea cable interconnectors and gas-insulated substations. The financing was disbursed in three tranches (EUR 50m on 17 December 2025, EUR 238m on 23 December 2025, EUR 202m on 26 January 2026) against a total project cost of approximately EUR 1.628 billion, with the balance funded by EU grants, IPTO's own resources, and other lenders. The project replaces island diesel/heavy-fuel-oil generation with mainland-grid supply and supports EU REPowerEU and renewable-integration objectives.
The European Investment Bank announced a EUR 450 million loan on 4 December 2025 to ORES, the Walloon electricity and gas distribution operator, to finance its 2025-2027 network investment programme across five Walloon provinces (Hainaut, Namur, Walloon Brabant, Luxembourg, Liège). Funds cover new substations, overhead-line replacement, underground-cable reinforcement, smart-meter deployment, and network automation to support renewable-generation connection and e-mobility uptake. The loan is drawn down over two years and repaid over a maximum 20-year term at fixed or variable rates; it is EIB's second loan to ORES, following a EUR 550 million financing signed in 2018, bringing cumulative EIB support for Walloon distribution-grid modernisation to EUR 1 billion.
The European Investment Bank signed a EUR 220 million loan agreement with WEMAG on 12 November 2025 (press release published 9 January 2026) to finance more than one-third of WEMAG Netz GmbH's 2025-2029 electricity distribution grid investment programme in West Mecklenburg, Mecklenburg-Vorpommern. The financing supports new substations, network reinforcement, and grid automation to accommodate renewable-generation connection, electromobility load growth, and heat-pump adoption, and forms part of WEMAG's wider EUR 1.2 billion grid-investment plan through 2033.
The European Investment Bank signed the first tranche (EUR 102.9 million, CZK 2.5 billion) of a EUR 381.8 million (CZK 9.28 billion) financing package with CEPS, the Czech state-owned electricity transmission system operator, on 20 October 2025. The loan, approved by the EIB board on 13 August 2025, finances reinforcement and modernisation of the Czech 400kV transmission network over 2025-2030, covering refurbishment and addition of 509km of lines, out of a total project cost of CZK 12.37 billion (approx. EUR 506 million). A second tranche (EUR 278.9 million) was signed 5 February 2026.
The European Investment Bank signed a EUR 200 million loan with Dolomiti Energia Holding SpA on 6 October 2025 to finance the group's 2030 investment programme. 55% of the funding backs new onshore wind farms in Campania and Puglia (121 MW combined capacity), and 45% finances renovation and development of the power grid in the Autonomous Province of Trento, including new high-voltage lines and substations. 70.5% of the facility is backed by an InvestEU guarantee, and the project is expected to create approximately 500 jobs during implementation.
The European Investment Bank, the Spanish Ministry of Economy, Trade and Business, and Endesa SA agreed a EUR 650 million financing package on 29 September 2025 to modernise, digitalise and reinforce Endesa's electricity distribution network across six Spanish autonomous communities during 2025-2027. The package comprises a EUR 500 million loan channelling NextGenerationEU Recovery Plan funds through Spain's Autonomous Resilience Fund (FRA), plus a EUR 150 million EIB own-funds loan representing the first tranche of a EUR 500 million facility already approved by the Bank. Financing covers smart meters, advanced transformers, grid digitalisation software, new substations and underground cabling, with over half the investment targeted at economically disadvantaged regions.