Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
On 28 January 2026 the European Commission's CINEA agency allocated a EUR 180.03 million grant to Repsol Generación Electrica SA under the 2025 Connecting Europe Facility (CEF) Energy call, funding the "Construction of the Reversible Pumped-Storage Hydroelectric Power Plant AGUAYO II" Project of Common and Mutual Interest in Cantabria, Spain. It was the single largest individual allocation of the round and the only pumped-storage project among the 14 cross-border energy infrastructure projects sharing roughly EUR 650 million from the same call. AGUAYO II will support electricity system flexibility and renewable-energy integration; CINEA states it will reduce curtailment of renewable output by an estimated 1,438 GWh/year (about 7.3% of Spain's total curtailed renewables) and cut CO2 emissions by roughly 566,000 tonnes/year by displacing two nearby combined-cycle gas plants. CINEA formally awarded the grant certificate for the project on 21-22 May 2026 at the 12th Energy Infrastructure Forum in Copenhagen. Commissioning is targeted for 31 December 2030.
The European Investment Bank and Spanish infrastructure and renewables group ACCIONA signed a EUR 120 million loan, the first tranche of a EUR 150 million facility approved by the EIB, to finance research, development, innovation and digitalisation across ACCIONA's water desalination and treatment, construction, renewable-energy and circular- economy businesses. The financing targets automation, robotisation, the Internet of Things, data analytics and applied AI, and is framed by the EIB under its TechEU initiative and 2024-2027 Strategic Roadmap priorities of technological innovation and climate action.
On 23 May 2025, the European Investment Bank (EIB) signed an agreement to provide EUR 700 million (EUR 350 million per project) for the construction of the Bałtyk 2 and Bałtyk 3 offshore wind farms in the Polish Baltic Sea, developed by a joint venture between Norway's Equinor and Poland's Polenergia. The twin fixed-bottom farms, located roughly 30 km off Ustka and Łeba, will have a combined capacity of 1.44 GW (100 turbines of 14.4 MW each) and are expected online in 2028, producing enough power for two million households. The EIB is the largest of roughly 30 lenders in the financing package and describes it as its third major renewables investment in Poland in 2025 and third Baltic Sea offshore-wind financing overall. Global Trade Alert logs the loan as a "red" state-loan intervention on the grounds that EIB multilateral financing to a named commercial joint venture constitutes below-market state-linked support.