Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
The Government of Kazakhstan, under Prime Minister Olzhas Bektenov, launched a second-generation geological exploration programme allocating 240 billion tenge (~USD 500 million) over 2026–2028 across 20 projects covering approximately 100,000 km² at 1:50,000 scale in 11 regions (Akmola, Aktobe, Almaty, East Kazakhstan, Karaganda, Kostanay, North Kazakhstan, Mangystau, Turkistan, Abai, Ulytau). The programme targets copper, gold, lead, zinc, rare earth elements, barite, and bauxite deposits using aerogeophysical, geochemical, and seismic-exploration methods together with Earth remote-sensing data analysis. It represents a ~50% uplift over the USD 469 million invested cumulatively in geological exploration over the prior 15 years, and modernises Soviet-era 1:200,000-scale mapping to 1:50,000-scale resolution across priority areas of 30,000 km² annually. The programme directly peers Western critical- minerals supply-diversification efforts anchored by the November 2025 US–Kazakhstan Critical Minerals MOU and the EU–Kazakhstan Strategic Partnership Roadmap 2025–2026.
On 26 December 2025 the President of Kazakhstan signed a law amending the Code "On Subsoil and Subsoil Use" with respect to the hydrocarbon and uranium sectors, followed on 30 December 2025 by a parallel set of amendments implementing presidential instructions on broader subsoil-use governance. Both packages take effect on 2 March 2026. The uranium amendments grant the National Atomic Company Kazatomprom (KAP) a statutory priority right to obtain exploration licences over prospective uranium areas listed in the State Subsoil Fund Management Programme, and to reserve blocks containing uranium mineralisation or deposits. Where uranium mineralisation is discovered on a solid-mineral block held by a third-party subsoil-user, an extension of that licence is conditional on the licensee surrendering the uranium-bearing block to the State; private subsoil-users no longer obtain priority production rights for uranium they discover. The amendments also raise the minimum direct or indirect Kazatomprom interest in any uranium mining project from 50% to 75%, and permit subsequent transfer to investors or joint-venture partners only subject to that 75% floor. The 30 December 2025 package establishes the National Geological Service as a non-privatisable national operator subordinate to the authorised subsoil-exploration agency and as the operator responsible for managing geological information; it also creates a Unified Subsoil Use Platform digital infrastructure (open geological-information database integrated with the Unified State System for Management of the Fuel and Energy Complex). The hydrocarbon track of the law shortens block-reservation periods and pushes unallocated plots into electronic-auction allocation to accelerate competitive exploration. The amendments accompany an announced USD 500m state geological-exploration programme.
On 18 July 2025 Kazakhstan's Parliament adopted Law No. 215-VIII ZRK "On Amendments and Additions to Certain Legislative Acts of the Republic of Kazakhstan on Taxation Matters," which abolishes the legacy priority-investment-project and special-investment-contract regimes under the Entrepreneurial Code and replaces them with three new contractual instruments — the Investment Agreement, the Investment Obligations Agreement, and the Simplified Investment Contract — effective 1 January 2026. The law is the binding legal operationalisation of the October 2024 Concept of Investment Policy until 2029 (filed), the US-Kazakhstan Critical Minerals MOU of November 2025 (filed), and the EU-Kazakhstan Strategic Partnership Roadmap 2025-2026 (filed), providing a contractual-certainty architecture for the USD 150 billion FDI-attraction target that previous "priority investment project" frameworks lacked. A statutory effectiveness-evaluation obligation (first of its kind in Central Asia) for assessing the socio-economic impact of granted investment preferences enters force separately on 1 July 2026.
Kazakhstan's Code of the Republic of Kazakhstan No. 214-VIII ZRK ("On Taxes and Other Mandatory Payments to the Budget"), signed by President Kassym-Jomart Tokayev on 18 July 2025 and effective 1 January 2026, replaces the 2017 Tax Code (Code No. 120-VI ZRK) with a wholesale recodification of the Kazakh tax regime. The most consequential IPTM-relevant provision restructures the uranium mineral extraction tax (MET) from a flat 6% rate to a differentiated schedule of 4–18% tiered by annual production volume per subsoil use agreement, supplemented by uranium-price-band surcharges of 0.5–2.5% above $70–$110/lb thresholds. The code also introduces a tenfold MET reduction for processing man-made mineral formations (mining waste / tailings reclamation) to incentivise circular-economy mineral recovery, and for exploration or production licenses issued after 31 December 2026, replaces MET with a tiered royalty regime — ore 13%, concentrate 10%, refined metals 7% — grandfathering existing operating projects under MET. The processing-grade discount (ore → concentrate → metal) is an explicit incentive to push value-added steps onshore within Kazakhstan. Directly material to Kazatomprom (NAC Kazatomprom JSC), the world's largest uranium producer supplying approximately 43% of global output, and to all solid-mineral operators (chromium, copper, zinc, gold) commencing new subsoil use agreements after January 2027.
On 27 December 2017 President Nursultan Nazarbayev signed Code No. 125-VI ZRK "On Subsoil and Subsoil Use," a wholesale recodification replacing the 2010 Subsoil Use Law that entered into force on 29 June 2018 (with certain provisions deferred to 1 January 2019). The Code establishes the licensing architecture for all mineral extraction in Kazakhstan — the world's leading uranium producer (~40% of global U₃O₈ output, ~22,000 tU/yr) and a top-11 oil exporter (~1.8 mbpd) — covering solid minerals, hydrocarbons, and uranium under a single codified framework. For solid minerals the Code introduces a liberalised "first-come first-served" auction-free licence model for non-strategic deposits and a state-tender model for strategic deposits, alongside subsoil-use rights transfer and pledge provisions governing all M&A in the sector. For uranium the Code codifies the National Atomic Company Kazatomprom's statutory role as state operator over all uranium blocks, with government priority pre-emption rights and mandatory Kazatomprom participation in all production licences. For hydrocarbons the Code establishes the concession and production-sharing framework governing the pre-salt Caspian mega-projects (Tengiz, Karachaganak, Kashagan) and the model contract architecture for petroleum products. Horizontal obligations — local Kazakh-content procurement floors, social-package requirements, and environmental-restoration mine-closure security — apply across all subsoil-use categories. Structurally this Code is the parent statute for every subsequently filed KZ action: the 2023-12-28 REE Comprehensive Plan and the 2025-12-26 Kazatomprom uranium-priority amendments both operate under delegated authority created by this Code.