Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
CEER, Saudi Arabia's PIF-backed electric-vehicle manufacturer, signed 16 commercial localisation agreements worth over SAR 3.7 billion (~USD 986 million) with domestic and international suppliers at the fourth PIF Private Sector Forum in Riyadh on 9 February 2026. The agreements cover components including EV coolants, brake fluids, aerodynamic covers, front-end modules, polymer compounds, automotive glazing, HVAC systems and body-shop equipment, and build on SAR 5.5 billion in agreements signed at the same forum in 2025. CEER states the localisation drive targets sourcing 45% of vehicle materials and components from Saudi companies by 2034.
On 9 December 2025, Saudi Arabia's Local Content & Government Procurement Authority (LCGPA) issued the December 2025 batch expansion of its Mandatory List — a binding instrument requiring government entities, state-owned enterprises, and sub-contractors to source listed products exclusively from Saudi domestic manufacturers meeting the LCGPA-defined local-content threshold. The December 2025 expansion brings the list to approximately 1,444 national products across 16 sectors, effective 1 March 2026, with LCGPA targeting a total of approximately 2,000 products by end-2026. The Mandatory List operationalises the demand-side layer of Saudi Arabia's Vision 2030 / National Industrial Strategy (NIS) industrial-policy stack, directly restricting foreign-supplier access to Saudi annual government-procurement budgets estimated at SAR 500 billion+ across central government, Aramco, PIF-portfolio entities, Ma'aden, SEC, STC, Saudi Post, and Saudi Railway.
On 1 December 2025, Saudi Arabia's Local Content & Government Procurement Authority (LCGPA) signed localization and knowledge-transfer agreements with four domestic manufacturers — Al-Sweedy Electric, Al-Sahel Company, Al-Zamel Company, and Composite Materials Company — to establish local production of polymer (fibre-composite) street-lighting poles, displacing imported metal and plastic poles. The initiative was run as a competitive "localization opportunity" tender (opened via LCGPA's Localization of Industry & Knowledge Transfer program, submissions closed 14 February 2025) under the sponsorship of the Public Investment Fund's Oil Sustainability Program, which promotes polymer/composite substitutes for hydrocarbon-linked feedstocks. Once qualifying domestic production is established, the product is slated for addition to LCGPA's Mandatory List, which would require government entities, SOEs, and their sub-contractors to source the item exclusively from the approved local manufacturers.
Saudi Arabian Mining Company (Ma'aden), MP Materials Corp., and the US Department of Defense signed a binding term sheet on November 19, 2025 to establish a joint venture that will build and operate a rare earth refining and separation facility in the Kingdom of Saudi Arabia. Ma'aden holds a minimum 51% controlling stake; MP Materials and the DoD together hold the remaining 49%. The facility will process rare earth feedstock from Saudi and global sources to produce separated light and heavy rare earth oxides, with a validity window to commercial agreement extending through March 31, 2027.
Saudi Arabia's General Authority of Foreign Trade (GAFT), chaired by Dr. Majed Alkassabi, issued its final affirmative determination on 29 June 2025 imposing definitive anti-dumping duties on longitudinally-welded circular stainless-steel pipes and tubes originating in or exported from the People's Republic of China and Taiwan. Duty rates range from 6.5% to 27.3% depending on exporter, effective 30 June 2025, following an investigation opened 2 May 2024 on a domestic-industry complaint. The measure runs for five years, with the Zakat, Tax and Customs Authority (ZATCA) directed to collect the duty at the border.
Saudi Arabia's General Authority of Foreign Trade (GAFT), under Chairman Dr. Majed Alkassabi, issued a final affirmative determination imposing definitive anti-dumping duties on Sulphonated Naphthalene Formaldehyde (SNF) — a concrete superplasticiser/water- reducing admixture — originating in or exported from China and Russia. The decision was published in the official gazette on 2 December 2024 and took effect 3 December 2024, directing the Zakat, Tax and Customs Authority to collect duties in the range of 18.12%-34% for five years (to 2 December 2029). The investigation was initiated 20 November 2023 following a complaint from the Saudi domestic industry.
Royal Decree No. M/140, dated 19 Shawwal 1441H (11 June 2020), promulgated Saudi Arabia's Mining Investment Law, replacing the 2004 Mining Investment Law (Royal Decree M/47). The law establishes a modern licensing framework under the Ministry of Industry and Mineral Resources (MIM) and the Saudi Geological Survey (SGS), introduces five license categories (reconnaissance, exploration, exploitation, small-mine, building-materials quarry), permits 100% foreign ownership in mining, and sets out royalty and fiscal terms aligned with Vision 2030's goal of developing an estimated $1.3 trillion in identified mineral wealth. The law took effect on 1 January 2021 and serves as the statutory parent of every Saudi mining licensing round and strategic minerals initiative launched since that date.