Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
The US Department of Energy's Office of Nuclear Energy, via its Idaho Operations Office, issued Funding Opportunity Announcement DE-FOA-0003538 on 15 December 2025, making USD 57 million available for the Fiscal Year 2026 Consolidated Innovative Nuclear Research (CINR) program. Individual awards range from a USD 3.1 million floor up to several million dollars, open to US universities, national laboratories, and US industry, with a companion FY2026 Phase II Continuation NOFO for previously-funded university teams. Research areas span continued operation of the existing US reactor fleet, deployment of advanced reactors, next-generation nuclear fuel cycles, and maintaining US nuclear-technology leadership.
On 6 November 2025, the US Department of the Interior (DOI) and the US Geological Survey (USGS) released the final 2025 List of Critical Minerals under the Energy Act of 2020 (30 U.S.C. § 1606), expanding the designation from 50 to 60 minerals. The final list adds 10 newly designated commodities — boron, copper, lead, metallurgical coal, phosphate, potash, rhenium, silicon, silver, and uranium — based on updated supply-chain disruption modelling, public comment, and interagency recommendations. The list constitutes the foundational statutory anchor for downstream US critical-minerals policy instruments including DPA Title III awards, DOE LPO Title 17 loan eligibility, IRA Section 45X Advanced Manufacturing Production Credit eligibility, Section 30D FEOC determinations, BIS export-control predicate assessments, Section 232 trade-investigation predicates, and CFIUS critical-technology triggers under 31 CFR § 800.215.
BIS published a final rule on August 18, 2023, amending the Export Administration Regulations (EAR) to implement decisions reached at the Nuclear Suppliers Group (NSG) plenary meetings in Nur-Sultan (June 2019) and Warsaw (June 2022). The rule revises five existing Export Control Classification Numbers (ECCNs) on the Commerce Control List (CCL) to align with multilateral commitments made by NSG participating governments. Changes include decontrolling water-hydrogen sulfide exchange tray columns from ECCN 1B22, clarifying isotope purification scope in ECCN 1B231, and updating mass-unit terminology in ECCN 3A233. The rule takes effect immediately upon publication.
The Department of Commerce Bureau of Industry and Security (BIS) added 91 entities (across 96 entries) to the Entity List under 15 CFR Part 744, in direct response to Russia's further invasion of Ukraine on 24 February 2022. The listed entities span ten destinations — Belize, Estonia, Kazakhstan, Latvia, Malta, Russia, Singapore, Slovakia, Spain, and the United Kingdom — and include Russian military research institutes, shipbuilding facilities, aerospace and electronics manufacturers, and suspected front companies in third countries used to circumvent EAR controls. A license is required for all items subject to the EAR; the review policy is denial for 86 entities and case-by-case (for US Government-supported space programs) for five.