Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
Peru's Ministry of Energy and Mines (MINEM) issued Decreto Supremo N° 002-2026-EM on 5 March 2026, modifying Decreto Supremo N° 017-2018-EM (Reglamento del Mecanismo de Racionamiento de Gas Natural) to establish a binding six-tier priority order for natural gas allocation whenever the rationing mechanism is formally activated during declared energy emergencies. Tiers prioritise residential and regulated commercial consumers at the top, followed by CNG vehicle/public-transport stations, regulated industrial consumers by volume threshold, independent consumers with firm contracts, and interruptible-contract holders at the base. The decree imposes binding obligations on natural-gas producers, pipeline-transport concessionaires, distribution concessionaires, and LNG-plant operators to optimise production and supply during declared emergencies, with Osinergmin empowered to grant temporary regulatory exemptions. The decree was triggered by the 2 March 2026 Megantini district rupture of Transportadora de Gas del Perú's (TGP) main Camisea pipeline, which reduced supply to approximately 9–10% of normal capacity and forced Cálidda (Lima/Callao distributor) to cut gas to 850 industrial users and all thermal power plants.
The European Commission approved on 28 January 2026, under EU State aid rules (Article 107(3)(c) TFEU and the 2022 Guidelines on State aid for climate, environmental protection and energy), a EUR 3.1 billion Spanish scheme to support electricity production from new or substantially refurbished high-efficiency combined heat and power (CHP) plants. The scheme runs for ten years (28 January 2026 to 27 January 2036) and pays a two-component reward premium — investment compensation set through competitive auctions plus quarterly-updated operational compensation tied to electricity, fuel and CO2 prices — to CHP operators using natural gas (with a minimum 10% renewable-hydrogen-ready capability), bioliquids, biogas, or solid biomass. The Commission found the scheme's positive effects on Spain's energy-efficiency and decarbonisation targets outweigh potential competition distortions.
The Mexican federal government published the Programa Sectorial de Energía 2025-2030 (PMSE) in the Diario Oficial de la Federación on 22 December 2025, establishing a binding five-year state-led energy-planning mandate for the Sheinbaum administration (2024-2030). The PMSE mandates a 54-46 state-to-private electricity generation mix, sets a 35 GW new clean-generation target by 2030 (13.6 GW from CFE + 22 GW from private/state/community projects), and formally supersedes the prior market-led Estrategia Nacional de Energía 2018-2032 and PRODESEN architecture. The Program is legally mandatory for all federal public administration entities including CFE, PEMEX, CENACE, and CENAGAS, operationalising the 2024 constitutional reform that restored CFE and PEMEX to strategic-sector status under Articles 27 and 28 of the Constitution.
The US Department of Energy selected the Tennessee Valley Authority (TVA) and Holtec Government Services to receive up to $800 million in combined federal cost-shared funding — $400 million each — to accelerate deployment of advanced light-water small modular reactors (SMRs). TVA's award backs a GE Vernova Hitachi BWRX-300 unit at the Clinch River site in Oak Ridge, Tennessee, targeted to be the nation's first commercial SMR (commercial operation targeted early 2030s), with domestic supply-chain partners Scot Forge, North American Forgemasters, BWX Technologies and Aecon. Holtec's award backs deployment of two SMR-300 units at the Palisades Nuclear Generating Station site in Covert, Michigan. The program is intended to expand US SMR manufacturing capacity and seed follow-on domestic and export supply chains.
The UK government confirmed Wylfa on Anglesey, North Wales as the site for the country's first government-backed small modular reactor (SMR) power station, committing over GBP 2.5 billion (~USD 3.3bn) to the programme via state-owned developer Great British Energy – Nuclear (GBE-N). GBE-N named Rolls-Royce SMR as preferred bidder, with an initial three-reactor deployment (scope for five more) targeting grid connection by the mid-2030s and up to 1.5GW of capacity — enough to power roughly three million homes. Site work is set to begin in 2026, subject to final government approvals and contract signature.
On 23 October 2025, Canada's federal Canada Growth Fund (CGF) and the Government of Ontario's Building Ontario Fund (BOF) announced an equity commitment agreement to finance the Darlington New Nuclear Project (DNNP) small modular reactor (SMR) build, led by Ontario Power Generation (OPG). CGF committed up to CAD 2 billion (USD 1.43bn) for a 15% minority stake and BOF committed up to CAD 1 billion (USD 713.5m) for a 7.5% minority stake, with OPG remaining majority owner and operator. The combined CAD 3 billion package funds construction of four grid-scale SMRs — the first commercial SMR deployment among G7 nations — targeting first-unit grid connection by end-2030.