Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
France's third Programmation Pluriannuelle de l'Énergie (PPE3), adopted by Décret n° 2026-76 of 12 February 2026 and published in the Journal Officiel on 13 February 2026, sets the framework for public energy policy in metropolitan continental France from 2026 to 2035. The decree codifies a 60% decarbonised-energy-consumption target by 2030 (from 42% in 2023), a 34% electrification share (585 TWh), and a reduction of fossil fuels to 40% of final energy consumption by 2030 (from 58% in 2023). It also formalises the EPR2 new-build programme (6 + 8 optional reactors) within the long-range generation-mix architecture, pairs with the Stratégie Nationale Bas-Carbone (SNBC3) for a net-zero-2050 trajectory, and includes an annex on clean-mobility development (SDMP).
On 16 June 2025 the European Investment Bank (EIB) signed a EUR 1.6 billion loan facility with French and Spanish transmission-system operators RTE and Red Eléctrica to finance the Bay of Biscay electricity interconnection, the first submarine power link between the two countries. First tranches totalling EUR 1.2 billion were signed at EIB headquarters in Luxembourg; the project separately holds a EUR 578 million EU Connecting Europe Facility (CEF) grant. The 400 km link (300 km submarine, connecting Cubnezais, France to Gatika, Spain) will raise cross-border exchange capacity from 2,800 MW to 5,000 MW and is expected to enter service in 2028.
South Korea's National Assembly passed the Special Act on the Expansion of the National Electricity Network (Law No. 20844) on 19 February 2025 as part of the bipartisan "Energy Trifecta Bill," with promulgation on 25 March 2025 and entry into force on 26 September 2025. The act creates an expedited siting, permitting, and compensation framework for trunk transmission-grid construction, consolidating 35 previously separate regulatory approvals into a single streamlined procedure and targeting a >30% reduction in grid-build timelines. It directly addresses the electricity-infrastructure bottleneck constraining semiconductor fab clusters (Yongin, Pyeongtaek, SK Hynix HBM), sovereign AI datacenter build-out, and EV/battery gigafactory load growth — structurally distinct from the K-Chips Act (fiscal incentives) and the Semiconductor Special Act (regulatory framework), as it unblocks the physical power-delivery constraint those programmes depend on.