Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
France's third Programmation Pluriannuelle de l'Énergie (PPE3), adopted by Décret n° 2026-76 of 12 February 2026 and published in the Journal Officiel on 13 February 2026, sets the framework for public energy policy in metropolitan continental France from 2026 to 2035. The decree codifies a 60% decarbonised-energy-consumption target by 2030 (from 42% in 2023), a 34% electrification share (585 TWh), and a reduction of fossil fuels to 40% of final energy consumption by 2030 (from 58% in 2023). It also formalises the EPR2 new-build programme (6 + 8 optional reactors) within the long-range generation-mix architecture, pairs with the Stratégie Nationale Bas-Carbone (SNBC3) for a net-zero-2050 trajectory, and includes an annex on clean-mobility development (SDMP).
On 26 December 2025, Japan's Cabinet approved the FY2026 (Reiwa 8) national budget, which allocates JPY 122.0 billion (~USD 800m) to the "Next-Generation Innovative Reactor Technology Development and Industrial Base Strengthening Support Project" (次世代革新炉の技術開発・産業基盤強化支援事業), up from JPY 88.9 billion in the FY2025 initial budget plus a JPY 6.0 billion FY2025 supplementary allocation. The programme, administered by ANRE under METI's GX (Green Transformation) Promotion budget, funds technology development and supply-chain build-out for Japan's "innovative light-water reactors" (revised BWR/PWR designs with enhanced passive safety) and small modular reactors under the government's GX2040 Vision. The budget takes effect with Japan's fiscal year on 1 April 2026, subject to ordinary Diet passage in early 2026.
The US Department of Energy selected the Tennessee Valley Authority (TVA) and Holtec Government Services to receive up to $800 million in combined federal cost-shared funding — $400 million each — to accelerate deployment of advanced light-water small modular reactors (SMRs). TVA's award backs a GE Vernova Hitachi BWRX-300 unit at the Clinch River site in Oak Ridge, Tennessee, targeted to be the nation's first commercial SMR (commercial operation targeted early 2030s), with domestic supply-chain partners Scot Forge, North American Forgemasters, BWX Technologies and Aecon. Holtec's award backs deployment of two SMR-300 units at the Palisades Nuclear Generating Station site in Covert, Michigan. The program is intended to expand US SMR manufacturing capacity and seed follow-on domestic and export supply chains.
DOE's Loan Programs Office concurrently finalized a conditional loan commitment and financial close on a USD 1 billion interest-bearing loan to Constellation Energy Generation, LLC, funded under the newly created Energy Dominance Financing Program, to help restart the 835 MW Crane Clean Energy Center (formerly Three Mile Island Unit 1) on the Susquehanna River in Londonderry Township, Pennsylvania. The reactor shut down in 2019 for market reasons (not safety) and was never fully decommissioned; restart is pending NRC licensing approval and is expected to power roughly 800,000 Mid-Atlantic homes, supporting domestic manufacturing and AI-datacenter power demand. A Pennsylvania Building & Construction Trades Council economic-impact study cited in the DOE release estimates ~3,400 direct/indirect jobs, over USD 16 billion in state GDP, and more than USD 3 billion in state/federal tax revenue over the project life.
The UK government confirmed Wylfa on Anglesey, North Wales as the site for the country's first government-backed small modular reactor (SMR) power station, committing over GBP 2.5 billion (~USD 3.3bn) to the programme via state-owned developer Great British Energy – Nuclear (GBE-N). GBE-N named Rolls-Royce SMR as preferred bidder, with an initial three-reactor deployment (scope for five more) targeting grid connection by the mid-2030s and up to 1.5GW of capacity — enough to power roughly three million homes. Site work is set to begin in 2026, subject to final government approvals and contract signature.
On 23 October 2025, Canada's federal Canada Growth Fund (CGF) and the Government of Ontario's Building Ontario Fund (BOF) announced an equity commitment agreement to finance the Darlington New Nuclear Project (DNNP) small modular reactor (SMR) build, led by Ontario Power Generation (OPG). CGF committed up to CAD 2 billion (USD 1.43bn) for a 15% minority stake and BOF committed up to CAD 1 billion (USD 713.5m) for a 7.5% minority stake, with OPG remaining majority owner and operator. The combined CAD 3 billion package funds construction of four grid-scale SMRs — the first commercial SMR deployment among G7 nations — targeting first-unit grid connection by end-2030.
China's Ministry of Finance, General Administration of Customs and State Taxation Administration jointly issued Announcement 2025 No. 10, restructuring VAT refund support across the power-generation sector effective 1 November 2025. Offshore wind power producers gain a new 50% immediate VAT refund running through 31 December 2027, while the prior immediate-refund policy for onshore wind power (in force since 2015 under Cai Shui [2015] No. 74) is repealed outright. Nuclear plants approved but not yet commercially operating as of 31 October 2025 receive a 50% collected-then-refunded VAT rebate for ten years from first commercial operation, but nuclear projects approved after 1 November 2025 receive no VAT refund at all. The measure reallocates state fiscal support within China's power sector toward offshore wind and legacy-pipeline nuclear capacity while withdrawing it from onshore wind and future nuclear approvals.
Namibia's Cabinet at its 22nd meeting on 23 September 2025 approved a Nuclear Industry Strategy mandating uranium value-addition (conversion and fuel fabrication objectives), pre-feasibility studies for Small Modular Reactors, radioisotope production, and industrial irradiation facilities. The strategy establishes the Nuclear Institute of Namibia (NIN) to drive implementation and coordinates with the IAEA on the 19 infrastructure milestones required for nuclear-power-developing countries. Cabinet simultaneously approved amendments to the Atomic Energy and Radiation Protection Act (Act No. 5 of 2005) to create an independent nuclear regulatory authority, a four-stage reactor-licensing framework, and Namibia's first statutory provisions for radioactive waste management; oversight transfers from the Ministry of Mines and Energy to the National Planning Commission (Office of the President).