Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
On 15 January 2026, Canada Growth Fund Inc. (CGF), a CAD 15bn federal Crown investment vehicle, announced it will lead an up to US$85 million structured financing for Mangrove Water Technologies Ltd. (Mangrove Lithium), a British Columbia-based lithium refiner. CGF's own commitment is up to US$65 million, alongside continued participation from existing investors Breakthrough Energy Ventures and BMW i Ventures; the CGF tranche closed concurrently with a separate CAD 9 million loan from National Bank of Canada backed by the federal Clean Technology Manufacturing Investment Tax Credit. Proceeds commission Mangrove's 1,000-tonne-per-annum Single Stack Plant in Delta, BC and advance development of a planned 20,000-tonne-per-year full-scale plant, with the government citing the deal as reducing reliance on overseas lithium processing and building an onshore mining-to-refining supply chain.
The US Department of Commerce awarded Crucible Metals, LLC — a subsidiary of South Korea's Korea Zinc — USD 210 million in direct CHIPS Incentives Program funding to build a smelter and critical-minerals processing facility in Clarksville, Tennessee. The facility, styled "Project Crucible," is an advanced replica of Korea Zinc's Onsan complex and is expected to cost roughly USD 6.6 billion in capital expenditure (USD 7.4 billion in total project financing), targeting first production in 2029. At full scale it is designed to produce 13 critical and strategic minerals — including gallium, germanium, antimony, indium, bismuth, tellurium, cadmium and palladium alongside roughly 300,000 tons/year of zinc, 200,000 tons/year of lead and 35,000+ tons/year of copper. As a condition of the award, Korea Zinc committed to give the US government and US customers priority access to its existing Korean-refined output of 10 critical minerals beginning in 2026, and the project separately secured conditional Department of War (Office of Strategic Capital) loan support and FAST-41 covered-project permitting status.
The Government of Ontario launched the Critical Minerals Processing Fund (CMPF), a CAD 500 million (~USD 364 million) provincial financial-support program to accelerate processing and refining capacity for critical minerals mined in the province, administered through Invest Ontario. The fund targets nickel, graphite, copper, cobalt and lithium, with a geographic emphasis on the Ring of Fire region northeast of Thunder Bay, and is intended to keep Ontario-mined minerals processed domestically rather than exported raw. It complements a separate CAD 3.1 billion package of loans, guarantees, grants and scholarships supporting Indigenous participation in the province's critical-minerals supply chain, and was first flagged in Ontario's 2025 Budget.
On 8 October 2025 the Australian Government (Albanese) and Queensland Government (Crisafulli) jointly announced up to AUD 600 million in co-funding — split evenly at AUD 300 million each — to keep Glencore's Mount Isa copper smelter and Townsville copper refinery operating through at least 2028. Funding is structured as three tranches of up to AUD 200 million released over three years, contingent on completion of a transformation study and further review points. The package protects more than 600 direct jobs at the smelter/refinery plus roughly 500 further jobs at the adjacent Phosphate Hill facility, and preserves roughly half of Australia's total copper smelting capacity. It follows Glencore's October 2023 announcement of intended closure and a July 2025 end-of-operations notice, with Glencore describing the deal as a short-term lifeline after absorbing sustained financial losses.
The US Department of War announced a USD 43.4 million Defense Production Act (DPA) Title III award to Alaska Range Resources, LLC — a wholly-owned subsidiary of Nova Minerals Limited — to fund the initial phase of an integrated domestic antimony supply chain at the Estelle Gold and Critical Minerals Project, roughly 150 km northwest of Anchorage, Alaska. The award funds extraction, concentration and refining of stibnite ore into military-grade antimony trisulfide, used in munitions primer production and case hardening. It follows China's December 2024 ban on antimony exports to the US and is intended to establish a "full spectrum" domestic antimony mining and refining hub to reduce reliance on Chinese-controlled supply.
France's Ministry of Industry and Energy, under Minister Marc Ferracci, announced a EUR 200 million green-industry tax credit (crédit d'impôt au titre des investissements dans l'industrie verte, C3IV) for Imerys' EMILI project at Échassières (Allier) — France's first domestic lithium mining and refining operation. The award was made as the project's total construction cost was revised up to EUR 1.8 billion. Once operational (targeted 2030), the site is expected to produce 34,000 tonnes of lithium hydroxide per year, enough to supply around 700,000 electric vehicles and cover over 20% of French battery factories' lithium needs. The award was announced alongside a wider package of C3IV support: seven critical-metals projects received a combined ~EUR 809 million in tax credits, part of ~EUR 5.4 billion in supported critical raw materials investment nationally.
The European Commission approved a EUR 227.9 million (USD ~267.1 million) Innovation Fund grant for TotalEnergies Raffinerie Antwerpen N.V.'s "ARCaDe" (Antwerp Refinery Carbon capture and DeNOx) project, with the grant agreement signed on 22 July 2025. ARCaDe was one of six projects — spanning refinery decarbonisation, hydrogen, ocean energy, plastics recycling, and green heat — invited off the Innovation Fund 2023 general-call (IF23Call) reserve list after eight originally-selected projects withdrew from the March 2025 signing round; the six-project cohort was worth nearly EUR 319 million combined. The project targets carbon capture and NOx-reduction retrofits at TotalEnergies' Antwerp refinery, financed via the EU Emissions Trading System.