Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
On 11 November 2025 President Mamadi Doumbouya officially inaugurated start of operations at the Simandou Integrated Project — Africa's largest greenfield mine-and-infrastructure asset — at a ceremony attended by the presidents of Rwanda and Gabon, China's Vice-Premier, and PMs from Côte d'Ivoire and Sierra Leone. The project comprises Blocks 1–2 (WCS: Winning International / China Hongqiao / Baowu) and Blocks 3–4 (SimFer: Rio Tinto 53% / Chinalco-led JV 47%), connected by 622 km of multi-use trans-Guinean railway to barge and transhipment port facilities at Forécariah, operated by Compagnie du TransGuinéen (CTG). Combined design capacity is up to 120 Mt/yr of high-grade (~65% Fe) iron ore, the largest single addition to seaborne supply since Vale's S11D ramp in 2016, structurally reshaping Australia-Brazil price competition and China's iron-ore import geography.
On 18 September 2025 the Bundestag adopted the Gesetz zur Errichtung eines Sondervermögens "Infrastruktur und Klimaneutralität" (SVIKG), authorising up to EUR 500 bn of additional federal borrowing over a twelve-year horizon outside the constitutional debt brake, on the basis of the new Article 143h Grundgesetz inserted by the March 2025 constitutional amendment. The envelope splits into up to EUR 100 bn for Länder and municipal infrastructure (channelled via the companion Länder- und Kommunal-Infrastrukturfinanzierungsgesetz, LuKIFG, passed 9 October 2025), EUR 100 bn transferred to the Klima- und Trans- formationsfonds (KTF) in annual instalments through 2034, and up to EUR 300 bn for additional federal investments in transport, energy/ heat, hospital, education, digitalisation, civil protection and R&D infrastructure. Investments are eligible retroactively from 1 January 2025 and may be approved through 31 December 2036; loan repayment begins no later than 1 January 2044. SVIKG is the largest single industrial-finance instrument launched by an EU member state in the post-2022 industrial-policy cycle.