Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
Yacimientos de Litio Bolivianos (YLB), Bolivia's state lithium SOE, signed a USD 1.030bn services contract on 26 November 2024 with Hong Kong CBC Investment Ltd. (a CATL-CMOC-BRUNP consortium) to build and operate two direct-lithium-extraction (DLE) plants on the Salar de Uyuni — one rated at 10,000 t/yr and one at 25,000 t/yr lithium carbonate, for combined 35,000 t/yr nameplate capacity. Bolivia retains a 51% sovereign share through YLB; CBC supplies financing, EDL technology and offtake. The contract was transmitted to the Asamblea Legislativa Plurinacional and the Chamber of Deputies' Plural Economy, Production and Industry Commission approved it by majority in mid-2025 (Bill No. 197/2024-2025); full plenary ratification remained pending as of May 2026, with a parallel Colcha K mixed-court suspension order on FPIC (free, prior and informed consent) grounds.
Yacimientos de Litio Bolivianos (YLB), Bolivia's state lithium SOE, signed a contract in September 2024 with Uranium One Group — a subsidiary of Russia's Rosatom state nuclear corporation — for the design, construction, and initial operation of an industrial direct-lithium-extraction (DLE) carbonation plant at Salar de Uyuni, with initial capacity of 14,000 t/yr lithium carbonate (expandable to 25,000–45,000 t/yr), representing a total investment exceeding USD 970 million and a 51%/49% profit-split in Bolivia's favour. The contract was approved by Bolivia's Comisión de Economía Plural in February 2025 amid corruption allegations, then suspended by parliamentary motion on 14 February 2025; a Bolivian court issued a further precautionary suspension order on 27 May 2025 on human-rights, environmental, and Mother Earth rights grounds, while the Arce government continued to insist on legislative ratification through at least 29 May 2025.
Australia's Future Made in Australia package, announced in the 2024-25 Federal Budget on 14 May 2024, commits A$22.7bn over 10 years to position Australia as a preferred supplier in the global clean-energy and critical-minerals supply chain. The two flagship production tax incentives are: (1) the Critical Minerals Production Tax Incentive (10% of eligible processing and refining costs for 31 critical minerals) and (2) the Hydrogen Production Tax Incentive (A$2 per kg of eligible renewable or low-emissions hydrogen, 2027-2040). A National Interest Framework administered by DISR determines which investments qualify. The framework act established a Future Made in Australia Coordinator and consolidated existing industrial-support vehicles (NAIF, EFA) under a single policy lens.
Act No. 9 of 2025, given Royal Assent on 14 February 2025, enacts the two production tax credits announced in the May 2024 Future Made in Australia package. Schedule 1 creates the Hydrogen Production Tax Incentive (HPTI): A$2/kg refundable tax offset for eligible renewable hydrogen produced with emissions intensity below 0.6 kgCO2e/kg H2. Schedule 2 creates the Critical Minerals Production Tax Incentive (CMPTI): a refundable 10% tax offset on eligible processing and refining expenditure for the 31 minerals on Australia's Critical Minerals List. Both offsets apply to production occurring between 1 July 2027 and 30 June 2040, capped at 10 years per project, administered by the ATO via new Divisions 419 (CMPTI) and 421 (HPTI) of the Income Tax Assessment Act 1997.