Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
The European Investment Bank signed its first-ever loan to N-ERGIE Aktiengesellschaft on 12 May 2026, a EUR 200 million long-term facility to finance renovation, reinforcement and digitalisation of N-ERGIE Netz GmbH's electricity distribution infrastructure in northern Bavaria, particularly the Nuremberg metropolitan region. The financing covers overhead lines, underground cables, substations, and network control/automation systems, and is intended to accommodate renewable-generation connection and rising electricity demand from electromobility and heat pumps over the 2025-2026 investment programme.
The European Commission approved Germany's €3.8 billion industrial electricity price relief scheme (Industriestrompreis, State Aid Case SA.120495) on 16 April 2026 under Section 5 of the Clean Industrial Deal State Aid Framework (CISAF), covering the period 1 January 2026 to 31 December 2028. The scheme compensates companies in 91 electricity- and trade-intensive sectors for electricity costs above a reference wholesale price floor, subject to a binding conditionality requiring reinvestment of at least 50% of aid in decarbonisation assets within 48 months. The Commission approved the German scheme as part of a coordinated three-Member-State decision also covering parallel Bulgarian and Slovenian electricity price relief schemes, with the combined package totalling approximately €4.22 billion. This is the largest individual CISAF disbursement approved to date, at 11.4× the scale of the parallel Bulgaria SA.120414 scheme (€334m), and establishes the Section-5 upper-bound precedent for EU energy-intensive-industry relief.
The European Commission approved Slovenia's €90 million industrial electricity price relief scheme (State Aid Case SA.120965) on 16 April 2026 under Section 5 of the Clean Industrial Deal State Aid Framework (CISAF), covering the period 1 January 2026 to 31 December 2028. The scheme compensates Slovenian energy-intensive companies for electricity costs above a reference wholesale price floor of €50/MWh, with payouts made twice yearly based on expected consumption, subject to a requirement that at least 50% of aid received be reinvested in decarbonisation or energy-efficiency assets. The approval was issued as part of a coordinated three-Member-State Commission decision (IP/26/815) covering parallel schemes in Bulgaria (SA.120414, €334m) and Germany (SA.120495, €3.8bn), with total package value of approximately €4.22 billion.
The European Commission approved Bulgaria's Electricity Price Relief Scheme (State Aid Case SA.120414) under the Clean Industrial Deal State Aid Framework (CISAF), authorising €334 million for energy-intensive industries over a three-year corridor from 1 July 2025 to 30 June 2028. Aid is delivered via a reduction on beneficiaries' monthly electricity bills through their suppliers, subject to a minimum price floor of €50/MWh. This is the first EU member-state scheme approved under the CISAF framework, establishing the precedential template for subsequent CISAF approvals across the EU industrial base.
On 6 February 2026, Texas Governor Greg Abbott announced a USD 14,076,031 grant from the Texas Semiconductor Innovation Fund (TSIF) to Coherent Corp. to accelerate scaled production of 6-inch Indium Phosphide (InP) wafers at its Sherman, Texas facility. The grant supports a broader USD 154 million capital-investment project that will establish what the announcement describes as the world's first 6-inch InP wafer fabrication plant, consolidating Coherent's North American semiconductor operations. InP wafers underpin photonics components used in data-center interconnects, telecommunications, AI compute networking, advanced sensing, and 6G wireless/satellite links. TSIF was established under the Texas CHIPS Act signed by Abbott in 2023.
Brazil's national development bank BNDES approved BRL 280 million (approx. USD 49m) in financing for WEG S.A. to renovate an existing plant and build new capacity for what BNDES describes as Brazil's largest and most modern battery energy-storage-system (BESS) factory, in Itajaí, Santa Catarina. The operation is the first contract under a joint BNDES/Finep public call for strategic-minerals and energy-transition industrial investment ("Mais Inovação"). Announced 4 February 2026; as of the announcement the financing was approved but not yet formally contracted, so this is filed as `stage: proposed` pending contracting.