Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
Niger's military-led Conseil des Ministres (CNSP) on March 3, 2026 adopted three decrees terminating the establishment agreements of COMINI SARL, AFRIOR SA, and ECOMINE SA — gold mining and refining companies operating in Niger. The grounds cited are failure to pay taxes, non-submission of annual technical and financial reports, and breach of local-development financing commitments since 2023. Formal notices had been issued to the companies on February 17 and July 23, 2025 before the terminations. The action extends the CNSP's systematic tightening over strategic-resource industries, which also saw uranium licence revocations and a mine nationalisation in 2024–2025.
At the Maiden Mining Local Content Summit held in Takoradi on 18 February 2026, Minerals Commission CEO Isaac Tandoh announced the revocation of more than 300 small-scale mining licences held fraudulently or left dormant, alongside a comprehensive regulatory reset covering all segments of Ghana's mining sector. The reform package includes the repeal of L.I. 2462 (which had permitted mining in forest reserves), introduction of a new medium-scale licensing tier, a sliding-scale gold royalty regime designed to increase state capture during high-price periods, and mandatory local-content thresholds across procurement, employment, and equity participation. Surface-mining operations will be required to use fully Ghanaian-owned contractors; underground-mining contracts must carry at least 50% Ghanaian ownership. The reforms structurally affect large-scale operators including Newmont, AngloGold Ashanti, Zijin Mining, and Atlantic Lithium.
On 24 November 2025 Barrick Mining Corporation and the Government of Mali announced a comprehensive settlement resolving all disputes arising from the Loulo-Gounkoto gold complex, including the June 2025 provisional state administration order. Under the agreement Barrick commits to pay approximately USD 430 million (≈244 billion CFA francs) to Mali in cash and VAT-credit offsets, formally accedes to Mali's 2023 Mining Code (Loi 2023-040), and receives in exchange: cancellation of all charges against Barrick entities and personnel, release of four detained employees, return of three metric tons of previously seized gold (~USD 400 million), termination of the provisional administration, and a ten-year renewal of the Loulo mine permit (which had been set to expire in February 2026). Full operational control was restored to Barrick on 18 December 2025.
On 16 June 2025 the Tribunal de Commerce de Bamako issued an order placing Barrick Mining's Loulo-Gounkoto gold complex — one of the world's top-10 gold producers at ~720 koz/yr — under provisional state administration for six months, appointing expert-comptable Soumana Makadji as provisional administrator and tasking state mining holding SOREM-SA with operational oversight. Barrick immediately filed for ICSID arbitration and provisional measures. Operations restarted under state management in Q3 2025. A negotiated settlement dated 24 November 2025 saw Barrick pay approximately USD 430 million to Mali to resolve all disputes; provisional administration was terminated and full operational control returned to Barrick in December 2025.
On 13 June 2025 the Ministry of Environment (MoE) and the Ministry of Mines and Energy (MME) jointly issued Interministerial Prakas No. 4838, amending Cambodia's environmental-impact-assessment classification rules for all construction and mining business projects. The Prakas mandates that all businesses conducting construction and mining projects — including artisanal enterprises (investment <USD 50,000) and small-scale enterprises (USD 50,000–250,000) previously outside the formal EIA architecture — must sign an environmental-protection letter and file it with the MME prior to commencing operations; no project may operate in areas designated off-limits by the MME. The first joint MoE+MME prakas on environmental compliance extends Cambodia's EIA architecture to the full spectrum of mining-sector operators, building on the Environmental and Natural Resources Code (June 2023) and Prakas No. 8 (February 2024, EIA consulting-firm accreditation standards), and cross-references Prakas No. 3591 (May 2025) for the investment-size classification thresholds.
Senegalese President Bassirou Diomaye Faye signed Décret n° 2024-1502 on 31 July 2024, suspending all artisanal and industrial mining operations and barring the issuance of new mining exploration and exploitation titles within a 500-metre corridor along the left bank of the Faleme River until 30 June 2027. The measure was adopted in Council of Ministers on 18 July 2024 following a ministerial mission to the zone in May 2024, and is motivated by severe environmental degradation, public-health risks from mercury and sediment contamination, and border-security concerns along the Senegal-Mali boundary in the OMVS basin.