Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
On 29 December 2025, Brazil's national development bank BNDES approved R$1.13 billion (~USD 205 million) in financing for Companhia Siderúrgica Nacional (CSN) to modernise three industrial plants at the Usina Presidente Vargas in Volta Redonda (RJ). R$625.8 million comes through the Finem credit line for sintering-plant emissions-control upgrades (new electrostatic precipitators and bag filters) that partly reimburse investments CSN made since 2023 to satisfy a Term of Adjustment of Conduct (TAC) with Rio de Janeiro's state environmental agency (INEA). A further R$500 million comes through the BNDES Mais Inovação programme for innovative machinery, IT equipment and IoT technology services. BNDES states the financing "fortalece a cadeia produtiva nacional de equipamentos" (strengthens the national equipment supply chain), giving the operation a domestic-content-preference dimension alongside its environmental/innovation financing purpose.
Brazil's national development bank BNDES is financing a BRL 3.7 billion (~USD 693 million) loan, drawn from the Fundo da Marinha Mercante (Merchant Marine Fund), to LHG Logística — the logistics arm of LHG Mining (Grupo J&F) — to build a fleet of 400 barges and 15 pushboats for transporting iron ore and manganese by inland waterway from Corumbá (Mato Grosso do Sul) roughly 2,500 km via the Paraguai/Paraná river system to the Nueva Palmira transshipment terminal in Uruguay. The vessels are being built over four years at six Brazilian shipyards; BNDES estimates the project lifts the national inland-cargo fleet by 16% and generates about 5,500 direct and indirect jobs, with 87% of funds applied in Brazil's North and Northeast regions.
The Australian Renewable Energy Agency (ARENA) committed AUD 44.9 million to Calix Limited to build a demonstration plant for its Zero Emissions Steel Technology (ZESTY), targeting up to 30,000 tonnes per year of low-carbon hydrogen direct reduced iron (HDRI) and hot briquetted iron (HBI) using renewable electricity and hydrogen instead of coking coal. The funding builds on prior ARENA-funded engineering studies and also supports early-stage engineering for a larger commercial-scale ZESTY plant, positioning low-emissions iron/steel as a strategic priority industry for Australia.
The Australian Renewable Energy Agency (ARENA) committed AUD 19.8 million to the NeoSmelt joint venture to fund a front-end engineering design (FEED) study for a direct reduced iron-electric smelting furnace (DRI-ESF) pilot plant at Kwinana, Western Australia, aimed at proving Pilbara iron ore can be converted into lower-carbon iron without a coking-coal blast furnace. The consortium, founded by BlueScope, BHP and Rio Tinto, welcomed Woodside Energy and Mitsui Iron Ore Development as new equal-equity participants alongside the grant announcement. Total project cost is AUD 48.85 million, with the study running from May 2025 to August 2026 ahead of a targeted final investment decision.