Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
President Daniel Noboa signed Executive Decree 273 on 31 December 2025 (effective 1 January 2026), the most significant overhaul of Ecuador's mining regulation since the 2009 Mining Code. The decree amends the Reglamento General a la Ley de Minería to (i) replace the fixed 3–8% royalty range with a price-indexed sliding scale tied to a trailing three-year LME reference price, (ii) require all mining projects to supply 100% of their electricity needs (no grid draw), (iii) tighten exploration-phase timelines and introduce automatic extinction of concessions where activities do not begin in time, (iv) modify royalty-deduction rules so gold/silver royalties are computed on gross revenue without deductions while small/medium operators of other metals can still deduct refining/transport/benefit costs, and (v) allocate 60% of mining royalties to social projects via decentralised governments (45% provincial, 35% municipal, 20% parochial). The decree was published in Registro Oficial Suplemento 195 of 31 December 2025 and is not retroactive.
Cumhurbaşkanı Kararı No. 10790 (Resmi Gazete 31 December 2025, issue 33124 3rd reprint), in force 1 January 2026, restructures Türkiye's annual import-tariff architecture across 4,344 product lines from non-EU origins. The decree (i) introduces or expands additional customs duty (Ek Mali Yükümlülük / İlave Gümrük Vergisi) of 5%–48% on non-EU imports of iron and non-alloy steel, copper, aluminium, and base-metal household goods; (ii) introduces forward-looking import-surveillance measures across 172 products under 36 notifications, with reference-price floors that cap effective duty relief on under-valued shipments; (iii) updates duties on 324 Customs Tariff Statistical Positions across 21 chapters (219 HS lines raised by 2.4–15 percentage points; 8 lines under HS 7225/7228/8528/8529 raised by 3–14 points; 2 lines reduced by 6 points); (iv) opens duty-free tariff quotas for 35 industrial-product categories — including 27 battery / lithium-cell HS codes through 1 February 2027, 8m m² of plastic-treated textiles through 31 December 2026, and 40,725 tons of organic chemicals and aluminium sheets (16 February–31 December 2026); and (v) imposes a permit regime (6-month validity) on used and refurbished goods. EU and EU-Customs-Union origins remain exempt under A.TR preferential rules; the structural asymmetry vs non-EU partners is the core mechanism. Stated rationale (Ministry of Trade): support domestic production, prevent unfair competition, increase employment, reduce the current-account deficit.
On 30 December 2025 the General Office of the Shanghai Municipal People's Government issued Hufubangui [2025] No. 20, a three-year action plan (1 January 2026 - 31 December 2028) to support the transformation and upgrading of advanced manufacturing. The plan sets quantitative targets — 100 new manufacturing enterprises with annual output above CNY 1 billion by 2028 (cumulative 600+), 500 new above-designated-size supply-chain enterprises, 100+ new national-level green factories, a robot density of 600 units per 10,000 workers, and 70%+ digital-equipment penetration — across next-generation electronics, intelligent connected new-energy vehicles, high-end equipment, advanced materials, green low-carbon and fashion consumer-goods industries, plus emerging bets on the low-altitude economy, commercial aerospace, embodied intelligence (robotics) and biomanufacturing. It is funded through tiered direct subsidies rather than tax relief: one-off R&D subsidies up to CNY 10 million, equipment/new-materials cost-share up to 30% of contract value (capped at CNY 20 million), technical- transformation loan/leasing interest support up to CNY 20 million cumulative, and 0.8-1.3% interest subsidies on component/material backup-inventory financing.
The Huadu District Government Office in Guangzhou (Guangdong Province) issued "Measures for Promoting High-Quality Development of New Energy and Intelligent Connected Vehicle Industries" (花府办规〔2025〕11号), effective upon issuance on 31 December 2025 for a two-year term. The package covers R&D-platform grants (up to RMB 100m per enterprise), model-promotion subsidies (up to RMB 50m per model), an L4+ autonomous-vehicle fleet-scale bonus (up to RMB 20m per enterprise), core-component investment rebates (1% of qualifying investment ≥RMB 50m, capped at RMB 300m), battery-production scale bonuses (up to RMB 60m for 5GWh+ output), at least RMB 200m for a "vehicle-road-cloud" integrated pilot zone (200+ autonomous vehicles, ~2,000 OBU retrofits), per-enterprise autonomous-fleet-operation subsidies (up to RMB 200m for qualifying passenger/cargo fleets), preferential industrial-land pricing (minimum 70% of benchmark rate), and facility-cost subsidies (up to RMB 150m/year for 3-5 years). It is a sub-provincial, district-level instrument implementing national NEV industrial-policy and the 2025-2026 Automobile Industry Stabilization and Growth Work Plan at the local level.
On 26 December 2025 the President of Kazakhstan signed a law amending the Code "On Subsoil and Subsoil Use" with respect to the hydrocarbon and uranium sectors, followed on 30 December 2025 by a parallel set of amendments implementing presidential instructions on broader subsoil-use governance. Both packages take effect on 2 March 2026. The uranium amendments grant the National Atomic Company Kazatomprom (KAP) a statutory priority right to obtain exploration licences over prospective uranium areas listed in the State Subsoil Fund Management Programme, and to reserve blocks containing uranium mineralisation or deposits. Where uranium mineralisation is discovered on a solid-mineral block held by a third-party subsoil-user, an extension of that licence is conditional on the licensee surrendering the uranium-bearing block to the State; private subsoil-users no longer obtain priority production rights for uranium they discover. The amendments also raise the minimum direct or indirect Kazatomprom interest in any uranium mining project from 50% to 75%, and permit subsequent transfer to investors or joint-venture partners only subject to that 75% floor. The 30 December 2025 package establishes the National Geological Service as a non-privatisable national operator subordinate to the authorised subsoil-exploration agency and as the operator responsible for managing geological information; it also creates a Unified Subsoil Use Platform digital infrastructure (open geological-information database integrated with the Unified State System for Management of the Fuel and Energy Complex). The hydrocarbon track of the law shortens block-reservation periods and pushes unallocated plots into electronic-auction allocation to accelerate competitive exploration. The amendments accompany an announced USD 500m state geological-exploration programme.
On 26 December 2025 the Peruvian executive promulgated and published in El Peruano Ley N° 32537, modifying Decreto Legislativo 1293 to extend the Registro Integral de Formalización Minera (REINFO) — Peru's artisanal-and-small-scale mining formalisation registry — through 31 December 2026, or until the new MAPE Law and its regulations enter into force, whichever occurs first. The statute is the parent instrument above DS 009-2025-EM (May 2025) and pushes the formalisation regime — which previously had a 30 June 2025 sunset under Ley 32213 — out by another 18 months. It also (i) orders a national MAPE census run by INEI, MINEM and INGEMMET (to begin within six months and conclude within twelve), (ii) requires REINFO registrants to declare real operational coordinates within 120 days via the Ventanilla Única de Formalización Minera, (iii) compels regional governments to transfer their formalisation paper and digital archives to MINEM within 60 days, and (iv) directs SUNAFIL to issue payroll-compliance verification rules for REINFO holders within 60 days. The law affects ~80,000+ artisanal and small-scale miners and is the statutory ceiling under which Peru's gold and copper-concentrate export chain operates.
Shandong Province's provincial government General Office issued Notice 鲁政办字〔2025〕183号 on 26 December 2025 ("Notice on Several Measures for Fiscal Support of the Integrated Development of Education, Science and Technology, and Talent"), a package of 30 fiscal-support measures running through end-2028. The measures fund R&D grants (up to RMB 30 million for major academician-led projects), talent awards (up to RMB 5 million per person), university-enterprise collaboration funding (up to RMB 15 million/project), an R&D-spend rebate (up to RMB 5 million/year per firm), and a 40%-of-interest subsidy (capped at RMB 500,000 per loan) for bank loans financing technology-achievement commercialization, plus co-financed non-performing-loan risk compensation of up to 90% on those loans. Global Trade Alert logged the interest-payment-subsidy component as a separate intervention tagged with generic extractive-sector codes (coal, crude petroleum, uranium) that do not correspond to any sector language in the underlying notice — the actual measures are horizontal, applying across education, R&D and technology-commercialization activity rather than to any named industry.
On 25 December 2025 Shanghai's Huangpu District Science and Technology Commission and Investment Promotion Office jointly issued Huangkeweigui [2025] No. 3, "Several Measures of Huangpu District on Promoting Brain-Computer Interface Innovation and Transformation Services (Trial)" (informally the "BCI Service 10 Provisions"), effective 24 January 2026 and valid through 31 December 2027. The measures subsidize BCI core- technology R&D and district co-funding of national/municipal projects (up to CNY 2m, 1:1 district match), shared innovation-platform construction (up to 30% of investment, capped CNY 2m), registered medical-device commercialisation (up to 40% of R&D cost, capped CNY 5m/ year per entity), application-demonstration scenarios (up to 30% of investment, capped CNY 2m), enterprise-growth and unicorn/gazelle recognition rewards (CNY 20k-100k), industrial-park operator support (up to CNY 2m/year), equity-financing support (up to 10% of R&D cost, capped CNY 2m, for firms with ≥CNY 20m in equity funding), and international BCI conference/event sponsorship (up to 30%, capped CNY 500k).
On 25 December 2025 Shanghai's Huangpu District Science and Technology Commission and Investment Promotion Office jointly issued Huangkeweigui [2025] No. 2, "Several Measures on Focusing on Translational Medicine to Accelerate Industry-Medicine Integration Innovation and Development," effective 30 days after promulgation (4 February 2026 per Global Trade Alert tracking) and valid through 31 December 2027. The measures subsidize cell-and-gene therapy, mRNA, synthetic biology, regenerative medicine and digital-medicine R&D (up to CNY 2m/year per entity), platform/lab construction (up to 30% of investment, capped at CNY 2m), use of the district's translational-medicine national science facility (up to 50% of annual usage fee, capped at CNY 1m), and domestic Class 1 new-drug clinical trials (Phase I up to CNY 2m, Phase II up to CNY 5m, capped at CNY 50m/year per entity), plus annual support for biopharma industrial- park operators (up to CNY 2m/year).
Zambia enacted the Income Tax (Amendment) (No. 2) Act No. 17 of 2025, assented to 23 December 2025 and effective 1 January 2026, introducing two mining-specific fiscal provisions. First, interest deductibility is capped at 30% of tax EBITDA for all companies, with unrelieved interest carry-forwardable for up to five years (general) or ten years for entities in mining and electricity generation. Second, mining companies deriving at least 75% of gross income in foreign exchange from outside Zambia may maintain their books of accounts in US dollars, reducing FX translation risk for dollar-denominated operators. Both measures are structurally distinct from the concurrent Act No. 10 of 2025 (Minimum Alternative Tax and loss carry-forward cap).
The European Investment Bank signed a EUR 75 million loan with AMAG Austria Metall AG on 19 December 2025 (publicly announced 23 February 2026), financing research, development, digitalisation and environmental-sustainability upgrades at AMAG's aluminium plant in Ranshofen, Upper Austria. The credit is the first EIB operation in Austria under its new TechEU programme (accelerating industrial innovation in Europe) and benefits from InvestEU programme backing. It contributes to a wider AMAG investment programme with total projected costs of EUR 168 million over 2025-2028, and the EIB explicitly frames the financing as advancing the EU objective of a sustainable, diversified and stable supply of critical raw materials, including aluminium.
Arrêté ministériel n° 00964/CAB.MIN/MINES/01/2025, signed 19 December 2025 by DRC Mines Minister Louis Watum Kabamba, suspends with immediate effect all activities of entities (notably comptoirs d'achat / buying counters, treatment units and similar structures) involved in the purchase, processing, transformation and commercialisation of copper and cobalt minerals sourced from artisanal exploitation across the country. Industrial, legally established mining operators are excluded. The order requires affected entities to submit compliance documentation within ten days, establishes an ad hoc commission to verify administrative, legal, technical and traceability conformity (15-day review window), and obliges operators to demonstrate the lawful origin of their supplies in line with OECD due-diligence guidance. Framed as a "conservatory" measure to restore order in the cupro-cobaltifère value chain and curb illicit exports.
The Agencia Nacional de Minería (ANM) of Colombia formally launched the Ronda Minera Cobre on 15 December 2025, opening a competitive selection process for 14 Áreas Estratégicas Mineras (AEM) across Antioquia, Cesar, La Guajira, and Tolima targeting copper, gold, and polymetallic minerals. The round operates under Contratos Especiales de Exploración y Explotación (CEEE) and operationalises the strategic-minerals designation framework established by ANM Resolución 1006 and Decreto 0977/2024, converting those prior designations into an active tender vehicle for the first time under the Petro government. Each of the 14 AEM blocks was front-loaded with geological certification, environmental viability sign-off, and community-consultation status verification, substantially reducing the regulatory risk that historically has slowed Colombian mining project timelines; evaluation horizon is up to 10 months.
The European Commission approved on 15 December 2025 a EUR 408 million Spanish state aid scheme (SA.119880) under the Clean Industrial Deal State Aid Framework (CISAF), funded by the Recovery and Resilience Facility (RRF), to support decarbonisation of manufacturing industry. The scheme funds direct grants — capped at EUR 200 million per company or project — for investments in electrification, switching to renewable or low-carbon hydrogen, waste heat recovery, and carbon capture, storage and utilisation (CCUS) across a wide range of sectors including chemicals, ceramics, paper and metallurgy. Aid is awarded on a first-come, first-served basis to enterprises of all sizes, inside and outside the EU Emissions Trading System, and cannot finance increases in production capacity; Spain expects the scheme to deliver annual emissions savings of around 1.6 megatonnes of CO2, with beneficiary projects required to become operational within 60 months of the aid grant.
The US Department of Commerce awarded Crucible Metals, LLC — a subsidiary of South Korea's Korea Zinc — USD 210 million in direct CHIPS Incentives Program funding to build a smelter and critical-minerals processing facility in Clarksville, Tennessee. The facility, styled "Project Crucible," is an advanced replica of Korea Zinc's Onsan complex and is expected to cost roughly USD 6.6 billion in capital expenditure (USD 7.4 billion in total project financing), targeting first production in 2029. At full scale it is designed to produce 13 critical and strategic minerals — including gallium, germanium, antimony, indium, bismuth, tellurium, cadmium and palladium alongside roughly 300,000 tons/year of zinc, 200,000 tons/year of lead and 35,000+ tons/year of copper. As a condition of the award, Korea Zinc committed to give the US government and US customers priority access to its existing Korean-refined output of 10 critical minerals beginning in 2026, and the project separately secured conditional Department of War (Office of Strategic Capital) loan support and FAST-41 covered-project permitting status.
The Government of Ontario launched the Critical Minerals Processing Fund (CMPF), a CAD 500 million (~USD 364 million) provincial financial-support program to accelerate processing and refining capacity for critical minerals mined in the province, administered through Invest Ontario. The fund targets nickel, graphite, copper, cobalt and lithium, with a geographic emphasis on the Ring of Fire region northeast of Thunder Bay, and is intended to keep Ontario-mined minerals processed domestically rather than exported raw. It complements a separate CAD 3.1 billion package of loans, guarantees, grants and scholarships supporting Indigenous participation in the province's critical-minerals supply chain, and was first flagged in Ontario's 2025 Budget.
On 12 December 2025 the Finnish Parliament (Eduskunta) approved Act 1361/2025, amending the Mining Minerals Tax Act (kaivosmineraalivero- laki, Act 314/2023) on the basis of government bill HE 127/2025. The amendment raises the value-based royalty on taxable metals contained in mined metallic ores from 0.6% to 2.5% (a 4.2× increase) and lifts the tonnage royalty on industrial minerals and other useful rock from €0.20 to €0.60 per tonne (3× increase). Iron is newly added to the list of taxable metals (alongside silver, gold, cobalt, chromium, copper, lithium, nickel, lead, palladium, platinum, uranium and zinc). Tax revenue is split 80% to the state and 20% to mining municipalities. The amendment enters into force on 1 January 2026.
The Beijing Economic-Technological Development Area (BDA, also known as Yizhuang) Management Committee issued Notice 京技管发〔2025〕33号 on 9 December 2025 ("Several Measures to Accelerate the Cultivation of the Future Energy Industry"), effective through 31 December 2028. The package subsidises R&D, shared technology platforms, industrialisation projects and demonstration deployment across new-type energy storage (solid-state batteries, supercapacitors, flow batteries), clean-energy generation (advanced wind, perovskite solar, hydrogen production/storage), low-carbon transition tech (CCUS, smart grid control) and fusion energy (magnetic and inertial confinement). R&D support runs up to 30% of annual enterprise R&D spend; demonstration-scenario procurement is subsidised up to 30% of cost capped at RMB 500,000 per project; first-of-kind product recognition pays up to RMB 150,000 per project per year. Global Trade Alert logged the underlying state act (95719) as a single "state aid, unspecified" intervention (151443).
In the early hours of 11 December 2025 the Council of the EU and the European Parliament reached provisional political agreement in trilogue on the "EU Pharma Package" — the revised pharmaceutical Regulation (COM 2023/0131) and Directive (COM 2023/0132) — the most significant overhaul of EU pharmaceutical legislation in over two decades. The package replaces Directive 2001/83/EC (Community Code on medicinal products for human use) and Regulation (EC) 726/2004 (the EMA Regulation), and consolidates the orphan-medicine (Regulation 141/2000) and pediatric-medicine regulations into a single framework. Headline provisions: (i) a new "8+1(+1)(+1)" IP-incentive architecture — 8 years of regulatory data protection plus 1 year of market protection, with up to two additional 12-month extensions for products addressing unmet medical need or new active substances meeting comparative-trial conditions, capped at 11 years total; (ii) an EU-wide list of critical medicines under enhanced governance via the Medicines Shortages Steering Group (MSSG) and an EMA "list of critical shortages in the EU"; (iii) mandatory shortage-prevention plans on marketing-authorisation holders for prescription medicines and Commission-designated products; (iv) modernisation of clinical-trial requirements, environmental-risk assessment, antimicrobial stewardship, and a transferable-exclusivity-voucher (TEV) regime to incentivise novel antibiotic R&D. The COREPER I committee endorsed the compromise text on 6 March 2026 and final adoption by Parliament and Council is expected during summer 2026, with the regulatory framework becoming applicable in 2028.
Vietnam's 15th National Assembly adopted the Law on Investment 2025 (Law No. 143/2025/QH15) at its 10th session on 11 December 2025, effective 1 March 2026. The law replaces the 2020 Law on Investment (Law 61/2020/QH14) as the umbrella FDI framework. Article 19 lets foreign investors establish enterprises in Vietnam without a prior investment project, unlocking holding-company / regional-headquarters structures. A fast-track Special Investment Procedure (SIP) covers industrial parks, export-processing zones, hi-tech parks, concentrated digital-technology zones, free-trade zones, international financial centres and economic-zone functional areas, targeting semiconductor, data-centre and 5G/digital-infrastructure capex. Appendix IV abolishes 38 conditional business sectors and adjusts 20 others (from 1 July 2026 only 199 conditional sectors remain). Operationalised by Decree 96/2026/ND-CP (issued and effective 31 March 2026) and Decree 103/2026/ND-CP for outbound investment.
On 4 December 2025, the United States and the Democratic Republic of the Congo signed a Strategic Partnership Agreement on Trade and Investment, executed at a White House trilateral ceremony alongside the parallel U.S.-Rwanda framework and witnessed by President Trump, President Tshisekedi (DRC), and President Kagame (Rwanda). The Agreement creates a Strategic Minerals Reserve (SMR) and a Strategic Asset Reserve (SAR) under DRC sovereignty, gives U.S. persons preferential access to SAR assets, and commits DRC and its state-owned enterprises to route at least 30% of their commercialised cobalt volumes through the Sakania-Lobito Corridor within five years. A Joint Steering Committee (JSC) co-chaired by State and DRC's Ministry of Economy holds its inaugural meeting on 4-5 February 2026, designating the initial SAR asset list and launching implementation. The DFC announced a proposed equity investment in a Gécamines-Mercuria copper/cobalt joint venture as the first commercial vehicle under the framework.
On 3 December 2025, Export Finance Australia (EFA) disclosed a €120 million (~AU$196 million) loan commitment to Vulcan Energy Resources' Phase One Lionheart Project in Germany's Upper Rhine Valley, which will produce battery-quality lithium hydroxide monohydrate (LHM) from geothermal brine while co-generating renewable heat and power. The loan is part of a syndicated, multi-country export-credit package alongside Germany's KfW Raw Materials Fund, the European Investment Bank, Export Development Canada, Denmark's EIFO, France's Bpifrance Assurance Export, and Italy's SACE, financing a project with total capital cost of ~€2.193 billion (~AU$3.9 billion). Phase One targets 24,000 tonnes per annum of LHM, enough for roughly 500,000 electric vehicles.
Pakistan's Directorate General of Customs Valuation (Karachi), acting under the Federal Board of Revenue, issued Valuation Ruling No. 2029/2025 on 3 December 2025, fixing new minimum customs values for imports of eleven aroma and aromatic chemicals used in perfumes and cosmetics — Citronellol, Coumarin, Dihydro Myrcenol, Eugenol, Geraniol, Linalool, Musk Ambrette, Sandela, Eucalyptus Oil, Peppermint Oil, and Vanillin — sourced primarily from China. The ruling was triggered by representations from domestic importer M/s Franscent (Pvt.) Ltd., which alleged systematic under-invoicing of these products, and was determined under Section 25(9) read with Sections 25(5) and 25(6) of the Customs Act, 1969, after the Directorate found transaction-value and comparable-goods valuation methods unworkable due to sparse and inconsistent import data. Clearance Collectorates were instructed to enforce accurate CAS-number and chemical-identity declarations to prevent misclassification against the new benchmark values.
Russia's Government adopted Resolution N° 1958 on 29 November 2025, amending Resolution N° 313 of 9 March 2022 to add eight commodity positions to Appendix 3 — the list of dual-use goods banned for export to "unfriendly" states. The added items are specialty electro-optical and semiconductor materials: lithium niobate, zinc telluride, gadolinium-gallium garnet, gallium arsenide, gallium phosphide, unprocessed and processed quartz wafers/plates, and polished tellurium-oxide prisms. These materials are inputs to electro-optical components (modulators, acousto-optic devices, IR/laser optics) with both civil and military (guidance, imaging) applications. The measure took effect 1 December 2025 and runs through the underlying ban's 31 December 2027 expiry; it applies to all countries except Eurasian Economic Union member states.
Russia's Government adopted Resolution N° 1947 on 28 November 2025, extending for a fourth consecutive six-month period the temporary ban on the export of waste and scrap of precious metals and of electrical and electronic equipment used principally for precious-metals recovery. The restriction runs from 1 December 2025 through 31 May 2026, covering waste and scrap of gold, silver, platinum, palladium, rhodium, iridium, osmium, and ruthenium, as well as metals plated or clad with precious metals. Carve-outs apply for cathode antimony ingots and small laboratory samples (≤500 g per batch) shipped by refineries for quality verification.
On 24 November 2025, six Beijing municipal departments — the Bureau of Economy and Information Technology, Development and Reform Commission, Science and Technology Commission, Health Commission, Drug Administration and Medical Insurance Bureau — jointly issued Notice 京经信发〔2025〕50号 ("Several Measures to Promote High-Quality Development of the Beijing Medical Device Industry"), effective immediately through 31 December 2028. The 15-measure package subsidises the full medical-device value chain: early-stage innovation (up to RMB 1m per project), product approval/launch (up to RMB 2m per product, RMB 10m annual enterprise cap), industrial-park and public-service infrastructure construction (up to 50% of investment, capped at RMB 50m), supply-chain-resilience R&D for critical components/materials (up to 30% of investment, capped at RMB 30m), AI-diagnostic-model development (up to RMB 30m), smart-factory digitalisation (up to 30% of investment, capped at RMB 30m per project), and international regulatory approval/market entry (up to RMB 1m per product, RMB 3m annual cap; up to RMB 10m for introducing overseas products to China).
UK Export Finance launched the Critical Goods Export Development Guarantee (Critical Goods EDG), a lending-support scheme that offers an 80% government guarantee on commercial finance for UK-based suppliers of critical minerals to UK exporters. Eligible suppliers must produce at least 50% of their critical-mineral goods for UK exporters (lowered to 20% if the firm also earns at least 5% of turnover from overseas sales), and the mineral must appear on the UK Critical Minerals Intelligence Centre's 2024 criticality assessment or the associated growth-minerals list. The scheme targets commercial lending facilities above £25 million and lets suppliers access the guarantee even if they do not export directly, as long as their output feeds into UK exporters' end products.
The Chongqing Municipal Government General Office issued Notice 渝府办发〔2025〕58号 on 2025-11-22, promulgating "Several Policy Measures to Promote High-Quality Development of the Low-Altitude Economy," effective immediately through 2027-12-31. The package comprises eight capped-percentage subsidy tracks covering low-altitude public-service procurement, logistics route operating subsidies (up to RMB 150,000 per route), demonstration projects (up to RMB 20 million), test-flight infrastructure (20% of investment, capped at RMB 5 million), manufacturing R&D and first-of-kind equipment support (up to 30% of receipts, capped at RMB 5 million), national innovation/manufacturing centres (up to RMB 20 million), ground-station infrastructure (20% of investment, capped at RMB 10 million), private-equity fund-manager incentives (1% of invested capital, capped at RMB 10 million cumulative), and AI-compute subsidies (20% of service cost, up to RMB 1 million/year). Global Trade Alert classifies all eight interventions as state aid with a "certainly harmful" (Red) rating.
The Department for Business and Trade, with DSIT, published "Vision 2035: Critical Minerals Strategy" on 22 November 2025 — the UK's first dedicated critical-minerals strategy under the Starmer government, superseding the withdrawn 2022 strategy. DBT commits up to GBP 50 million for new critical mineral projects on top of GBP 165 million in existing support, with the National Wealth Fund providing equity backing (Cornish Lithium GBP 24m in 2023 plus a further GBP 31m commitment in 2025; Cornish Metals GBP 28.6m in 2025; South Crofty Tin GBP 26.8m). Sets 2035 targets of 10% of UK industrial demand from domestic production (extraction + processing + refining), 20% from recycling, and a hard floor of 50,000 tonnes lithium carbonate equivalent produced domestically. Strategy is consciously midstream-and-recycling-tilted rather than upstream-extraction race; pillars are (i) optimise domestic production, (ii) resilient global supply networks via partnerships with US, EU, Canada, Australia, Saudi Arabia, India, Japan (plus Kazakhstan rhenium/vanadium and continued China engagement), (iii) circular economy / recycling, (iv) responsible supply chains.
On 20 November 2025 Russian Prime Minister Mikhail Mishustin signed Government Order No. 3351-r, approving a list of 15 companies selected to receive a combined RUB 4.97 billion in 2025 federal infrastructure subsidies under the "New Opportunities for the Far East" federal project (part of the "Socio-Economic Development of the Far Eastern Federal District" state programme). The two largest line items — RUB 2 billion (~USD 24.7m) each, the programme's legal per-project ceiling — go to OOO "Amur Minerals" for grid connection at its planned mining-and-processing plant on the Malmyzhskoye copper-gold deposit (Khabarovsk Krai) and to OOO "Udokanskaya Med'" (Udokan Copper) for construction of a transport-storage complex at its Udokan copper mining-and-metallurgical combine (Zabaykalsky Krai). Subsidies reimburse a share of investors' capital spending on power grid connection, water/heat networks and access infrastructure, contingent on job-creation and capex targets set out in the order's annex.
On 18 November 2025, during Saudi Crown Prince Mohammed bin Salman's White House visit (17-19 November 2025), the United States and the Kingdom of Saudi Arabia signed a Strategic Framework for Cooperation on Securing Uranium, Metals, Permanent Magnets, and Critical Minerals Supply Chains. The framework was signed by US Secretary of the Interior Doug Burgum and Saudi Minister of Energy H.R.H. Prince Abdulaziz bin Salman, and positions Saudi Arabia (via Ma'aden + Public Investment Fund vehicles) as a regional hub for processing rare earths and producing permanent magnets, supports a US-backed rare-earths refinery in the Kingdom, and channels Saudi capital — alongside the broader USD ~1 trillion Saudi investment commitment in the US announced the same week — into US and allied critical-mineral projects. It is paired with a separate joint declaration on civil nuclear cooperation (Section 123 Agreement contemplated) and was operationalised one day later by the 19 November 2025 binding term sheet between MP Materials, the US Department of War, and Ma'aden to develop a rare-earth refinery in Saudi Arabia (Department of War financing the US side's 49% stake; Ma'aden retaining ≥51%).
Portaria Normativa GM/MME nº 120/2025, published in the Diário Oficial da União on 14 November 2025 by the Ministério de Minas e Energia, regulates the Política de Debêntures para Projetos de Transformação de Minerais Estratégicos para a Transição Energética. It sets the eligibility criteria, classification methodology and project-approval pipeline (under Decreto 11.964/2024 and Leis 12.431/2011 and 14.801/2024) for tax-exempt incentivised debentures and infrastructure debentures financing the downstream transformation of cobalt, copper, lithium, nickel and rare earths into battery and permanent-magnet inputs (lithium carbonate/hydroxide, cobalt sulfate, nickel sulfate, battery-grade copper foil, rare earth oxides/ chlorides/metals/alloys). MME estimates ~R$5.2 bn/year in unlocked private investment (R$3.7 bn transformation + R$1.5 bn mining/ beneficiation, with up to 49% of bond proceeds usable on linked upstream activities).
On 13 November 2025, the United States and the Republic of Korea released a Joint Fact Sheet reaffirming the July 2025 announcement of the Korea Strategic Trade and Investment Deal — the first standalone US-Korea trade-and-investment agreement since the 2012 KORUS FTA. USTR issued the implementing Federal Register notice (90 FR 55964, Notice 2025-21940) on 3 December 2025, effective 4 December 2025, with retroactive HTSUS application to 1 November 2025 for autos and auto parts and to 14 November 2025 for reciprocal-tariff goods, timber, lumber, derivatives, and certain aircraft and aircraft parts. On the US tariff side: (i) the country-specific IEEPA reciprocal tariff on Korean originating goods is set at the higher of the KORUS FTA / MFN rate or 15% (parallel to the Japan and EU framework deals); (ii) the Section 232 tariffs on autos, auto parts, timber, lumber and wood derivatives are reduced to 15% (no incremental duty when the pre-existing KORUS/MFN rate already meets or exceeds 15%); (iii) Korean exports of qualifying goods on the Potential Tariff Adjustments for Aligned Partners (PTAAP) list are exempt from reciprocal tariffs (covering generic pharmaceuticals and unavailable natural resources); (iv) Section 232 pharmaceuticals capped at 15%; semiconductors granted MFN-style "no less favourable" treatment in any future sectoral deal. On the investment side, Korea commits to a USD 350bn package: USD 150bn into US shipbuilding ("Approved Investments") plus USD 200bn into US strategic industries via a separate Strategic Investments MOU, with annual currency-funding cap of USD 20bn. Non-tariff commitments include streamlined US biotech approvals on the Korean side, US meat and cheese market access, fair treatment for US digital services, removal of Korea's 50,000-unit cap on US vehicles meeting FMVSS, and joint WTO support for the moratorium on customs duties on electronic transmissions.
Bangladesh Bank's Foreign Exchange Policy Department issued FE Circular No. 46 on 12 November 2025, extending the existing 0.30% special cash-assistance (export subsidy) on net FOB value of readymade garment (RMG) and textile exports — previously payable only to manufacturer-exporters producing in their own factories under FE Circular No. 01/2020 — to output manufactured and exported through sub-contracting arrangements, at the same 0.30% rate and same terms. Eligibility is conditioned on the principal firm holding an operating factory of its own and both parties following the 2019 Sub-Contracting Guideline for the RMG industry and the 2024 rules for direct export-oriented garment establishments operating bonded warehouses; pure trading firms with no production capacity are excluded. The change applies to goods shipped from the circular's issuance date onward.
Emissions Reduction Alberta (ERA), a provincial Crown corporation funded through Alberta's Technology Innovation and Emissions Reduction (TIER) carbon-levy system, launched a CAD 22.4 million (approx. USD 16 million) Methane Reduction Deployment Program on 2025-11-12. The program funds up to 50% of eligible project costs, capped at CAD 1 million per project, for owners and operators of upstream and midstream oil and gas facilities in Alberta to deploy commercial-ready methane detection, measurement and reduction technologies. Global Trade Alert logs the program as a trade-distorting financial grant given its effect on the relative cost competitiveness of Alberta oil and gas production versus other producing jurisdictions.
The Australian Renewable Energy Agency (ARENA) awarded a AUD 25.3 million grant to Sydney-based startup SunDrive Solar to scale and commercialise its copper-metallisation solar cell technology at its Kurnell (New South Wales) facility, taking the process from R&D toward a 300 MW commercial-scale production line. The technology replaces silver — the metallisation material used in conventional solar cell manufacturing — with copper, a direct response to silver prices having nearly tripled over three years while the solar industry now consumes roughly a third of global industrial silver supply. The grant builds on an earlier AUD 14 million ARENA award and is delivered under the Advancing Renewables Program, with equipment partners Maxwell and Vistar supporting production-tool development, cost modelling and module testing.
Japan's Cabinet adopted a Cabinet Order on 11 November 2025 (promulgated 14 November 2025, effective 14 February 2026) amending Appended Table 1 of the Export Trade Control Order (輸出貿易管理令) to add three new list-control item categories: (i) peptide synthesizers and related components (Item group mapping to Australia Group 2023–2024 plenary dual-use biotechnology controls, aligning Japan with the US BIS implementation promulgated December 2024), (ii) powders of refractory metals or their alloys below specified particle-size and purity thresholds — tungsten, molybdenum, niobium, tantalum, and rhenium powders used as additive- manufacturing feedstocks (Item 5(20), implementing a Wassenaar Arrangement plenary outcome on metal-powder dual-use), and (iii) modules, assemblies, or devices incorporating field-programmable logic devices (FPGAs) above specified gate-count and process-node thresholds (Item 7(10-2), extending Japan's semiconductor-component AI-compute perimeter). This is the first discrete Appended Table 1 list-control amendment filed under the post-October-2025 FEFTA catch-all- controls overhaul architecture.
The Beijing Economic-Technological Development Area (BDA, also known as Yizhuang) Management Committee issued Notice 京技管发〔2025〕25号 ("Several Measures to Accelerate the High-Quality Development of Industrial Finance"), effective 11 November 2025 through 31 December 2028. It renews and supersedes the prior version (京技管发〔2024〕33号, issued 24 December 2024) of the same "industrial finance 20 measures" (产业金融二十条) program. The package subsidises the district's finance-for-industry ecosystem: newly licensed financial institutions receive capital-scaled grants (e.g. RMB 5 million + 1% of paid-in capital for institutions with RMB 100-300 million in capital, rising in tiers to a cap of RMB 60 million for larger institutions); branch-office openings receive RMB 2-4 million one-off grants; venture-capital fund managers receive rewards of 2-4% of capital deployed (capped at RMB 500,000/project); leasing and factoring firms with RMB 500 million+ capital receive 0.5% landing bonuses (capped at RMB 25 million); and tech-credit "risk compensation funds" reimburse partner banks for small/micro-enterprise loan losses. State media reporting on the program's prior iteration cited a maximum single-policy-item award of RMB 80 million. Global Trade Alert logged the underlying state act (95362) as a single "state aid, unspecified" intervention (150867).
On 6 November 2025, the US Department of the Interior (DOI) and the US Geological Survey (USGS) released the final 2025 List of Critical Minerals under the Energy Act of 2020 (30 U.S.C. § 1606), expanding the designation from 50 to 60 minerals. The final list adds 10 newly designated commodities — boron, copper, lead, metallurgical coal, phosphate, potash, rhenium, silicon, silver, and uranium — based on updated supply-chain disruption modelling, public comment, and interagency recommendations. The list constitutes the foundational statutory anchor for downstream US critical-minerals policy instruments including DPA Title III awards, DOE LPO Title 17 loan eligibility, IRA Section 45X Advanced Manufacturing Production Credit eligibility, Section 30D FEOC determinations, BIS export-control predicate assessments, Section 232 trade-investigation predicates, and CFIUS critical-technology triggers under 31 CFR § 800.215.
Canada's Budget 2025 (released 4 November 2025) creates the First and Last Mile Fund (FLMF), allocating $371.8 million over four years starting in 2026-27 to Natural Resources Canada to address transport and utility bottlenecks connecting near-term critical-minerals production sites to deep-water ports and downstream processing facilities. The fund absorbs the existing Critical Minerals Infrastructure Fund and leverages its envelope to provide up to $1.5 billion in total support through 2029-30. The FLMF is structurally distinct from the CMSF (equity/debt vehicle), the CMETC (exploration tax credit), and the Clean Tech ITC (manufacturing tax credit) — it is the infrastructure-grant instrument completing Canada's critical-minerals programme architecture.
The General Office of the Fujian Provincial People's Government issued Min Zheng Ban [2025] No. 30, "Several Measures to Promote the Development of the Artificial Intelligence Industry and Empowerment Applications in Fujian Province," on 2025-11-04. The notice implements the national "AI+" initiative at provincial level via three quantified subsidy tracks: a talent-recruitment supplement of RMB 200,000/year per person for AI engineers registered on a provincial core-engineer roster; a compute subsidy covering up to 50% of annual cloud/compute-service spend (capped at RMB 500,000 per firm) for companies purchasing at least RMB 100,000 of computing services per year; and a one-time capital subsidy of up to 50% of build cost (capped at RMB 5,000,000) for qualifying AI innovation platforms. The measure is in force through 2028-12-31 (per GTA state-act revocation date) and is one of a wave of province- and city-level AI industrial-policy notices issued across China in late 2025.
Brazil's national development bank BNDES signed BRL 2.3 billion (~USD 425 million) in credit-line financing with Volkswagen do Brasil on 31 October 2025 at a ceremony at the Anchieta plant (São Bernardo do Campo, SP). The package draws on two BNDES lines: BNDES Mais Inovação, financing development of Volkswagen's hybrid (mild-hybrid, full-hybrid, plug-in-hybrid) vehicle portfolio and ADAS/connectivity engineering projects; and Exim Pré-Embarque, a pre-shipment export-finance line to expand Volkswagen's exports. Volkswagen is Brazil's largest automotive exporter (4.4 million units shipped since 1970 across 147 markets), with exports up 43% year-on-year in Jan-Sep 2025.
On 31 October 2025, Canada's Minister of Energy and Natural Resources Tim Hodgson announced — on the sidelines of the G7 Energy & Environment Ministers' Meeting in Toronto — that the federal government will leverage the Defence Production Act (DPA) to designate critical minerals as defence supplies and build a strategic stockpile, with the Crown acting as buyer of last resort and setting confidential minimum prices to insulate Canadian producers from Chinese price suppression. The announcement was paired with an initial round of 26 investments, partnerships and measures totalling C$6.4 billion in unlocked critical-mineral capital (~C$120m direct federal spend plus up to ~C$1.2 bn in offtake agreements, expressions of interest and export guarantees) and aligned with nine allied countries. It is the first time Canada has invoked DPA stockpiling and priority-procurement powers for non-traditional defence inputs (lithium, nickel, cobalt, copper, rare earths, graphite, uranium) and repositions Canada as an allied-aligned strategic supplier parallel to US DPA Title III action under EO 14241.
On 29 October 2025, Brazil's national development bank BNDES, through its capital-markets subsidiary BNDESPAR, launched a public call ("Chamada Pública para Seleção de Fundos de Investimento em Índice de Mercado") to invest up to BRL 1 billion (~USD 187 million) across up to five exchange- traded index funds (ETFs). Each selected fund can receive up to BRL 200 million, capped at 50% of the fund's total assets, split across three equity ETFs, one fixed-income ETF and one hybrid-strategy ETF. Proposals were due 5 December 2025; five funds were subsequently selected, three of them explicitly thematic — infrastructure, clean energy, and a "strategic sectors" index — turning a capital-markets liquidity instrument into a channel for directing state development-bank capital toward BNDES's industrial-policy priorities.
Singapore's Energy Market Authority announced on 27 October 2025 that it will award up to S$44 million under the Advanced Combined Cycle Gas Turbine (CCGT) Incentive Scheme to Keppel's Infrastructure Division and Sembcorp Industries, operators of the first two advanced CCGTs in Singapore. The grant offsets the initial cost disadvantage of adopting higher-efficiency, hydrogen-ready CCGT units — each unit is expected to emit at least 200,000 tonnes less carbon annually than existing plants — with the units to be operational by December 2026 and 2027 respectively. This is a domestic industrial-policy subsidy with no cross-border trade restriction; filed for IPTM's tracking of state financing for power-sector decarbonisation capex.
The Beijing Municipal Science and Technology Commission and the Zhongguancun Science Park Management Committee, jointly with two other municipal departments, issued "Several Measures on Supporting the Construction of the Beijing Future Digital Space Innovation Pilot Zone" on 2025-10-23 (publicly posted 2025-10-27). The "2+3+5" package of ten measures subsidizes frontier-technology demonstration scenarios (up to 30% of certified investment, capped at RMB 10,000,000), original game and digital-content production (RMB 300,000-2,000,000 per award-winning title), key laboratories (up to RMB 5,000,000/year operating funds plus rent discounts on up to 4,000 sqm, for up to 3 years), industry-chain innovation consortia (up to RMB 20,000,000/year, RMB 50,000,000 over 3 years), and incubators (up to RMB 20,000,000 over 3 years), alongside seed/angel/Series-A co-investment minimums via an industry fund. The pilot zone is anchored on the former Shougang steelworks north campus (core area) and the Jin'anqiao AI large-model industry cluster (innovation-coordination area), both in Beijing's Shijingshan district.
President Peter Mutharika signed an executive order effective 21 October 2025 prohibiting the export of all raw, unprocessed minerals extracted in Malawi, covering uranium, rare earth elements, niobium, graphite, tantalum, bauxite, rutile, gold, copper, diamonds, heavy mineral sands, and all other minerals. Minerals that have been processed, refined, or value-added in Malawi are exempt. The order aligns with an announced National Mining Corporation to oversee mineral production and processing, and introduces fines and sanctions under Malawi law for violations.
Five Tianhe District (Guangzhou) government bureaus jointly issued Notice 穗天发改规字〔2025〕3号 on 2025-10-16, promulgating "Several Policy Measures to Accelerate High-Quality Development of the Low-Altitude Economy and Aerospace in Tianhe District," effective 30 days after publication (2025-11-19) through 2027-12-31. The package caps district-scale subsidy tracks covering industrial-park and professional-building recognition (up to RMB 1 million per operator), core-technology R&D grants (up to RMB 1 million/year, scaled by enterprise revenue band), airworthiness-certification support (up to RMB 2 million per enterprise/year), low-altitude logistics and eVTOL route operating subsidies (up to RMB 3 million annual pools each), talent incentives (RMB 100,000/person/year, capped at a RMB 10 million pool), vocational training, and insurance support. Global Trade Alert classifies the measure as state aid with a "certainly harmful" (Red) rating.
On 20 October 2025, President Donald J. Trump and Australian Prime Minister Anthony Albanese signed at the White House the "United States-Australia Framework for Securing of Supply in the Mining and Processing of Critical Minerals and Rare Earths" — a non-binding common-policy instrument committing both governments to provide at least USD 1 billion each in financing within six months (USD 3bn+ joint commitment against an USD 8.5bn project pipeline and a stated USD 53bn recoverable-resource pipeline). The framework establishes a US-Australia Critical Minerals Supply Security Response Group co-led by the US Secretary of Energy and the Australian Minister for Resources, mandates streamlined permitting for mining/separation/processing projects, and explicitly couples the US demand-side architecture (DPA Title III + Defense Logistics Agency stockpile) to Australia's Critical Minerals Strategic Reserve. Concurrent with signing, EXIM issued seven Letters of Interest totalling USD 2.2bn (unlocking up to USD 5bn) to Arafura Rare Earths, Northern Minerals, Graphinex, La Trobe Magnesium, VHM, RZ Resources, and Sunrise Energy Metals; the US Department of War separately committed to a 100 metric-ton-per-year advanced gallium refinery in Western Australia, and Australia took USD 200m concessional equity in the Alcoa-Sojitz Wagerup gallium project and USD 100m equity in the Arafura Nolans rare-earths project.
The Government of Canada and the Province of Manitoba jointly launched the Climate and Economy Solutions Program (CESP), providing up to CAD 23 million (~USD 16.4 million) in grants for cost- and emissions-reducing energy projects in the province. The program is funded primarily through Canada's Low Carbon Economy Fund (Recapitalized Low Carbon Economy Leadership Fund), topped up with roughly CAD 4.5 million from the provincial government, and is administered by Manitoba Environment and Climate Change. Eligible grant recipients include municipalities, Northern Affairs communities, Indigenous communities, multi-unit residential building operators, and businesses/not-for-profits partnering with those entities, for stationary-equipment retrofit and efficiency projects, industrial/commercial vehicle retrofits, self-generated renewable energy and fuel-production projects, and EV-charger installations. The initial application window closed December 1, 2025.