Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
Greece enacted Law 5164/2024, published in Government Gazette ΦΕΚ A' 202 on 12 December 2024, amending the Strategic Investments framework of Law 4864/2021 to create a new "Flagship Investments" sub-category with a 45-day strategic-approval procedure, up to 12-year income-tax stabilisation, cash grants, accelerated depreciation, and location-based incentives. Eligible projects explicitly include the production, extraction, refining and processing of EU-designated critical and strategic raw materials (aluminium, lithium, gallium, germanium per Regulation (EU) 2024/1252), circular-economy investments (reuse, repair, recycling), and the shipbuilding and maritime industry. The law is Greece's first foundational statutory alignment to the EU Critical Raw Materials Act and re-anchors Greek industrial-policy architecture to allied CRM and strategic-autonomy objectives.
On 2 August 2024, President Luiz Inácio Lula da Silva sanctioned Lei nº 14.948/2024 (with partial veto, Mensagem nº 741) at a ceremony in the Pecém Industrial-Port Complex in Ceará, following Senate and Chamber approval of PL 2308/2023; the law was published in the Diário Oficial da União on 5 August 2024. The statute establishes Brazil's first comprehensive legal framework for low-carbon hydrogen: it (i) creates the National Low-Carbon Hydrogen Policy (PNH2BC) under the National Energy Policy umbrella, (ii) sets a statutory definition of "low-carbon hydrogen" as fuel/industrial input with lifecycle GHG intensity ≤ 7 kg CO₂e/kg H₂, (iii) institutes the Brazilian Hydrogen Certification System (SBCH2) for origin and emissions accreditation, (iv) creates the Special Incentive Regime for Low-Carbon Hydrogen Production (Rehidro), suspending PIS/Pasep and Cofins for five years on capital-goods, raw-materials and services purchases by qualified producers, and (v) authorises the Programa de Desenvolvimento do Hidrogênio de Baixa Emissão de Carbono (PHBC) — a tax-credit envelope capped at BRL 18.3 bn between 2028 and 2032 (subsequently regulated by Lei nº 14.990/2024 sanctioned 30 September 2024). ANP gains regulatory authority over hydrogen transportation, storage and import/export licensing, while the law amends Leis nºs 9.427/1996 (ANEEL) and 9.478/1997 (Petroleum Law) to integrate hydrogen into the energy-policy and electricity-regulation framework. Industry reporting at sanction cited >USD 30 bn in announced project pipeline, concentrated in Northeast renewable-rich states (Ceará, Bahia, Pernambuco, Rio Grande do Norte) leveraging Pecém, Suape and Açu as hydrogen-derivative export terminals.
On 29 June 2024 the Council of the European Union adopted Council Regulation (EU) 2024/1865 and Council Decision (CFSP) 2024/1864, amending Regulation (EC) No 765/2006 to extend Belarus's sanctions regime so that it mirrors the restrictive measures already in force against Russia, closing routes used to circumvent the Russia sanctions via Belarus. The package bans the import of gold, diamonds, helium, coal and other mineral products (including crude oil) originating in or exported from Belarus; bans the import of goods and technology on the EU Common Military List if of Belarusian origin; extends the export ban on dual-use goods, oil-refining and LNG-liquefaction equipment, maritime-navigation goods and luxury goods to Belarus; prohibits transit via Belarus of EU-exported firearms and ammunition; and broadens the road-transport ban. The measures entered into force on 1 July 2024, the day after publication in the Official Journal.
Peraturan Menteri Energi dan Sumber Daya Mineral (Permen ESDM) No. 6 of 2024, signed by Minister Arifin Tasrif on 30 May 2024 and published in the Berita Negara Republik Indonesia, establishes the procedural framework governing how holders of Mining Business Licences (IUP) and Special Mining Business Licences (IUPK) for copper, iron, lead, and zinc production may continue to sell processed mineral products abroad during the final phase of domestic smelter construction. Licence holders that previously obtained MEMR export recommendations and whose refining facilities have reached commissioning stage but are not yet at full operational capacity may apply for time-bound extensions to sell concentrate and semi-processed ore offshore through 31 December 2024, subject to quarterly physical inspections by the Director General of Minerals and Coal. The regulation is the MEMR-side companion instrument to the same-day Permendag 10/2024 (Ministry of Trade copper-concentrate and anode-sludge export prohibition), together constituting the complete legal architecture of Indonesia's copper hilirisasi (downstream- processing) mandate. Its scope is broader than the Trade Ministry rule: it covers copper, iron, lead, and zinc whereas Permendag 10/2024 targets copper and anode-sludge only, and it operates as the conditional derogation mechanism (MEMR) to Permendag 10/2024's absolute prohibition regime (Trade Ministry).
Indonesia's Ministry of Trade promulgated Peraturan Menteri Perdagangan (Permendag) No. 10 of 2024 on 30 May 2024, amending Permendag 22/2023 on Goods Prohibited for Export. The regulation set 31 December 2024 as the final cutoff for copper-concentrate and anode-sludge exports — extending the original 1 June 2024 ban deadline by seven months — and enforced a full prohibition starting 1 January 2025. The measure is paired with ESDM Regulation No. 6 of 2024 covering the upstream mining-product side, completing the legal architecture of Indonesia's copper "hilirisasi" (downstream-isation) mandate. The ban forces all domestically mined copper concentrate to be smelted and refined inside Indonesia. Two operators are directly affected: PT Freeport Indonesia (PTFI), majority-owned by state holding MIND ID with Freeport-McMoRan as minority partner, which operates the Grasberg mine in Papua and the new Manyar/Gresik smelter in JIIPE; and PT Amman Mineral Nusa Tenggara (subsidiary of PT Amman Mineral Internasional, IDX:AMMN), which operates the Batu Hijau mine in Sumbawa with a smelter under commissioning. A fire at Freeport's Gresik smelter in October 2024 disrupted ramp-up and forced the government to grant a discretionary export-permit extension into 2025 for PTFI, signalling that the ban — while now legally in force — is being enforced flexibly during smelter commissioning rather than as a hard stop. Permendag 10/2024 is the copper-sector equivalent of the 2020 nickel- ore export ban (ESDM 11/2019) and the planned bauxite-ore ban (effective June 2023). Together these three measures complete Indonesia's resource-nationalism package across its three highest-value mineral exports: nickel, bauxite, and copper. Combined domestic smelter capex commitments tied to the copper rule (Freeport Manyar + Amman Sumbawa) total ~USD 6 billion. Indonesia's Finance Ministry estimated forgone export revenue of ~Rp 10 trillion (~USD 640 million per year) from the copper-concentrate ban alone, which the government is treating as an acceptable downstream-policy cost. Severity is set at 4: the action is binding, durable, and reshapes a globally relevant supply chain (Indonesia is ~5% of global mined copper, rising), but discretionary export extensions during smelter commissioning soften near-term enforcement and limit the immediate market shock relative to the harder 2020 nickel rule.
Uganda's Statutory Instrument No. 30 of 2024, gazetted and effective 24 May 2024, prohibits the export of unrefined gold and mandates a minimum purity threshold of 99.9% for all gold export consignments. Exporters must demonstrate compliance via a purity certificate and proof of payment of an export levy of US$200 per kilogram of refined gold. The instrument replaces a previous statutory instrument of the same name that had expired on 30 June 2023, re-enacting and reinforcing the in-country value-addition mandate for Uganda's gold sector.
Australia's Future Made in Australia package, announced in the 2024-25 Federal Budget on 14 May 2024, commits A$22.7bn over 10 years to position Australia as a preferred supplier in the global clean-energy and critical-minerals supply chain. The two flagship production tax incentives are: (1) the Critical Minerals Production Tax Incentive (10% of eligible processing and refining costs for 31 critical minerals) and (2) the Hydrogen Production Tax Incentive (A$2 per kg of eligible renewable or low-emissions hydrogen, 2027-2040). A National Interest Framework administered by DISR determines which investments qualify. The framework act established a Future Made in Australia Coordinator and consolidated existing industrial-support vehicles (NAIF, EFA) under a single policy lens.
Act No. 9 of 2025, given Royal Assent on 14 February 2025, enacts the two production tax credits announced in the May 2024 Future Made in Australia package. Schedule 1 creates the Hydrogen Production Tax Incentive (HPTI): A$2/kg refundable tax offset for eligible renewable hydrogen produced with emissions intensity below 0.6 kgCO2e/kg H2. Schedule 2 creates the Critical Minerals Production Tax Incentive (CMPTI): a refundable 10% tax offset on eligible processing and refining expenditure for the 31 minerals on Australia's Critical Minerals List. Both offsets apply to production occurring between 1 July 2027 and 30 June 2040, capped at 10 years per project, administered by the ATO via new Divisions 419 (CMPTI) and 421 (HPTI) of the Income Tax Assessment Act 1997.