Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
On 19 December 2023, the Thai Cabinet endorsed the second phase of the national electric-vehicle support programme ("EV 3.5") covering 2024-2027, following its approval by the National Electric Vehicle Policy Committee. The Excise Department published the implementing Notification on 28 December 2023; the regime entered into force on 1 January 2024. EV 3.5 combines (i) per-vehicle purchase subsidies of THB 50,000-100,000 for battery-electric passenger cars and pick-ups, (ii) a reduction in excise duty on BEV passenger cars priced ≤ THB 7 million from 8% to 2%, and (iii) up to 40% import-duty relief on Completely Built-Up (CBU) BEV passenger cars priced ≤ THB 2 million during 2024-2025. Participating OEMs must offset CBU imports with domestic Thai production at a 1:2 ratio by end-2026 and 1:3 by end-2027, or face clawback of the granted incentives. The package is the operational successor to EV 3.0 (2022-2023) and was designed to lock in the wave of Chinese-OEM gigafactory and assembly investment that EV 3.0 attracted (BYD Rayong, MG/SAIC, GAC AION, Great Wall Motor, NETA, Changan, Chery). By the August 2025 EV-Board meeting Thailand had logged > THB 137 billion in approved EV-supply-chain investment under the combined EV 3.0 + EV 3.5 envelope. EV 3.5 is the central instrument in Thailand's "EV Hub of ASEAN" industrial strategy and the principal regional competitor to Indonesia's nickel-anchored EV-cluster bid and Vietnam's Decree 182 investment-support fund.
On 23 October 2023 Manono Lithium SAS — a joint venture between Zijin Mining's overseas subsidiary Jinxiang Lithium Limited (~55% stake) and the DRC state-owned entity COMINIERE (~35-39%) — secured the exploration licence for the northeast block of the Manono Lithium Project (formerly disputed PR 13359-NE) after Congolese courts returned full title to COMINIERE, which then invited Zijin to jointly develop it. A mining licence was granted in September 2024, and Zijin commissioned initial lithium production at the site in June 2026, targeting approximately 120,000 t/yr LCE in 2026 and up to 270,000–320,000 t/yr at full capacity. Manono NE is now among the world's largest lithium mines under Chinese operational control, deepening China's existing hold over DRC critical-mineral output (CMOC cobalt/copper, CNMC/Sinohydro copper) and establishing the DRC as a top-tier lithium producer inside the Chinese supply-chain sphere.
Regulation (EU) 2023/1781, published in the Official Journal on 18 September 2023 and in force from 8 October 2023, establishes the EU Chips Act: a three-pillar framework targeting 20% of global semiconductor production by 2030 (up from approximately 9% in 2022) by mobilising EUR 43bn in public and private investment. Pillar 1 (Chips for Europe Initiative, EUR 3.3bn committed from EU budget) funds R&D, pilot production lines, and design infrastructure. Pillar 2 creates a fast-track permitting regime for "Integrated Production Facilities" (IPFs) and "Open EU Foundries" (OEFs) that qualify as being in the Union's interest. Pillar 3 establishes a supply-chain monitoring mechanism and grants the Commission power to mandate priority orders from designated facilities during a declared semiconductor crisis.
Regulation (EU) 2023/1542 establishes a comprehensive EU statutory framework for all battery categories (portable, SLI, LMT, EV, industrial), imposing supply-chain due-diligence obligations for cobalt, lithium, nickel, and natural graphite; mandatory recycled-content thresholds; carbon-footprint declarations; a digital battery passport; and ambitious collection and recycling-efficiency targets, with rolling application dates running from February 2024 through August 2036. It repeals Battery Directive 2006/66/EC and applies to every economic operator placing batteries on the EU market, binding every EV, consumer-electronics, and stationary-storage supply chain that relies on DRC cobalt, Australian/Chilean lithium, Indonesian/Philippine nickel, and Chinese/Mozambican graphite.
On 9 January 2024 the Norwegian Parliament (Stortinget) endorsed the government's White Paper Meld. St. 25 (2022–2023) by an 80–20 vote, authorising the opening of approximately 281,000 km² of Arctic continental-shelf area between mainland Norway, Jan Mayen and Svalbard for commercial seabed-mineral exploration. The decision operates under the 2019 Seabed Minerals Act (havbunnsmineralloven) and made Norway the first Western/NATO sovereign jurisdiction to authorise large-scale deep-sea mining for energy-transition critical minerals (polymetallic sulphides, manganese crusts containing copper, cobalt, lithium, zinc and rare earths). The Energy Ministry prepared a first licensing round in 2024 but the Støre government postponed it in December 2024 after budget-negotiation pressure from the Socialist Left (SV) party; the statutory authorisation remains in force.
Canada's Fighting Against Forced Labour and Child Labour in Supply Chains Act (S.C. 2023, c. 9; "Bill S-211") received Royal Assent on 11 May 2023 and entered into force on 1 January 2024. It imposes a binding annual supply-chain disclosure obligation on government institutions and in-scope private-sector entities (any two of: ≥CAD 20m assets, ≥CAD 40m revenue, ≥250 employees) requiring a public report by 31 May each year detailing steps taken to prevent and reduce the risk of forced or child labour in their supply chains. The Act also amends the Canadian Customs Tariff (Schedule 9898.00.00) to extend the existing import prohibition on goods produced with forced labour to also cover goods produced with child labour, enforced at the border by the Canada Border Services Agency (CBSA). Criminal penalties of up to CAD 250,000 apply for non-compliance, false reporting, or obstruction.
On 4 January 2023 the Union Cabinet of India, chaired by Prime Minister Narendra Modi, approved the National Green Hydrogen Mission with an initial financial outlay of ₹19,744 crore (≈USD 2.3 bn) covering FY2023-24 through FY2029-30. The bulk of the outlay — ₹17,490 crore — funds the Strategic Interventions for Green Hydrogen Transition (SIGHT) programme for electrolyser-manufacturing incentives and green-hydrogen production incentives. ₹1,466 crore is allocated to pilot projects (steel, mobility, shipping, ports, decentralised hydrogen), ₹400 crore to R&D, and ₹388 crore to other Mission components (skilling, regulatory framework, certification). The Ministry of New and Renewable Energy (MNRE) is the lead implementing agency. Headline targets by 2030: at least 5 MMT/year of domestic green-hydrogen production capacity, with ≈125 GW of associated additional renewable- energy capacity, mobilisation of >₹8 lakh crore (≈USD 100 bn) of total investment, creation of >600,000 jobs, and avoidance of ≈50 MMT/year of CO₂ emissions. The Mission is positioned as the supply-chain underpinning for India's hard-to-abate decarbonisation (refining, fertilisers, steel) and as the basis for a green-hydrogen export industry leveraging India's low-cost solar resource. MNRE notified the SIGHT scheme guidelines on 28 June 2023, splitting the programme into Component I (Electrolyser Manufacturing Incentive, ₹4,440 crore) and Component II (Green Hydrogen Production Incentive, ₹13,050 crore for Mode-1; subsequent Mode-2A and Mode-2B tranches added for sector-specific tenders). Solar Energy Corporation of India (SECI) is the implementing agency for both components and runs the competitive reverse-auction tenders.