Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
The Australian Renewable Energy Agency (ARENA) announced up to AUD 45 million in funding for Fortescue's Solar Innovation Hub, a 500 MW test bed within Fortescue's 1.5 GW solar PV development pipeline at the Cloudbreak Solar Farm in the Pilbara region of Western Australia. The funding uses a portfolio structure covering up to 10 individual demonstration projects under one agreement, including Built Robotics' automated pile-driving technology and 5B's rapid-deployment Maverick solar system, aimed at cutting installed solar costs and supporting ARENA's Ultra Low-Cost Solar goal of 30% module efficiency at 30 cents/watt installed cost by 2030. Global Trade Alert logged the grant as a trade-distorting subsidy to Fortescue's solar manufacturing and deployment activity.
On 2 August 2024, President Luiz Inácio Lula da Silva sanctioned Lei nº 14.948/2024 (with partial veto, Mensagem nº 741) at a ceremony in the Pecém Industrial-Port Complex in Ceará, following Senate and Chamber approval of PL 2308/2023; the law was published in the Diário Oficial da União on 5 August 2024. The statute establishes Brazil's first comprehensive legal framework for low-carbon hydrogen: it (i) creates the National Low-Carbon Hydrogen Policy (PNH2BC) under the National Energy Policy umbrella, (ii) sets a statutory definition of "low-carbon hydrogen" as fuel/industrial input with lifecycle GHG intensity ≤ 7 kg CO₂e/kg H₂, (iii) institutes the Brazilian Hydrogen Certification System (SBCH2) for origin and emissions accreditation, (iv) creates the Special Incentive Regime for Low-Carbon Hydrogen Production (Rehidro), suspending PIS/Pasep and Cofins for five years on capital-goods, raw-materials and services purchases by qualified producers, and (v) authorises the Programa de Desenvolvimento do Hidrogênio de Baixa Emissão de Carbono (PHBC) — a tax-credit envelope capped at BRL 18.3 bn between 2028 and 2032 (subsequently regulated by Lei nº 14.990/2024 sanctioned 30 September 2024). ANP gains regulatory authority over hydrogen transportation, storage and import/export licensing, while the law amends Leis nºs 9.427/1996 (ANEEL) and 9.478/1997 (Petroleum Law) to integrate hydrogen into the energy-policy and electricity-regulation framework. Industry reporting at sanction cited >USD 30 bn in announced project pipeline, concentrated in Northeast renewable-rich states (Ceará, Bahia, Pernambuco, Rio Grande do Norte) leveraging Pecém, Suape and Açu as hydrogen-derivative export terminals.
Act No. 9 of 2025, given Royal Assent on 14 February 2025, enacts the two production tax credits announced in the May 2024 Future Made in Australia package. Schedule 1 creates the Hydrogen Production Tax Incentive (HPTI): A$2/kg refundable tax offset for eligible renewable hydrogen produced with emissions intensity below 0.6 kgCO2e/kg H2. Schedule 2 creates the Critical Minerals Production Tax Incentive (CMPTI): a refundable 10% tax offset on eligible processing and refining expenditure for the 31 minerals on Australia's Critical Minerals List. Both offsets apply to production occurring between 1 July 2027 and 30 June 2040, capped at 10 years per project, administered by the ATO via new Divisions 419 (CMPTI) and 421 (HPTI) of the Income Tax Assessment Act 1997.