Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
On 1 February 2026 Finance Minister Nirmala Sitharaman, presenting the Union Budget 2026-27, announced the launch of India Semiconductor Mission (ISM) 2.0 — the second-phase national semiconductor industrial-policy framework succeeding ISM 1.0 (2021, INR 76,000 crore). The Budget makes an initial INR 1,000 crore provision for ISM 2.0 in FY 2026-27 and raises the Electronics Components Manufacturing Scheme (ECMS) outlay from INR 22,919 crore to INR 40,000 crore. ISM 2.0's distinct architecture centres on four strategic priorities not in ISM 1.0: (i) indigenous semiconductor equipment, chemicals, gases and materials production, (ii) full-stack Indian semiconductor IP design, (iii) industry-led R&D and skills/training centres, and (iv) domestic and global supply-chain integration. Total mission outlay reported as approximately INR 1-1.2 lakh crore (~USD 12-14bn) is being finalised; Cabinet clearance and the formal scheme launch are expected by mid-2026.
Gujarat Chief Minister Bhupendra Patel announced the Gujarat Electronics Component Manufacturing Policy 2025 (GECMP-2025) on 22 June 2025, making Gujarat the first Indian state with a dedicated sectoral stack-on-top instrument to the central Electronics Components Manufacturing Scheme (ECMS) notified by MeitY on 28 March 2025. Under GECMP-2025, any project approved by MeitY under ECMS and physically located in Gujarat is eligible for a state-matched fiscal incentive equal to the central incentive (PLI / capex subsidy) disbursed under ECMS, released by the state within 30 days of the central tranche. The policy targets INR 35,000 cr in new investment and covers multi-layer / HDI printed circuit boards, lithium-ion cells, SMD passive components, display modules, camera modules, sub-assemblies and the capital machinery required for their production. A separate R&D track provides up to INR 12.5 cr per Gujarat-based recognised institution to establish Centres of Excellence, Finishing Schools or Applied Research Laboratories. Initial applications closed 31 July 2025.
The Union Cabinet approved the Semicon India Programme on 15 December 2021, establishing the India Semiconductor Mission (ISM) as the nodal agency. The programme offers fiscal support of up to 50% of project cost for silicon semiconductor fabs, compound semiconductor facilities, display fabs, ATMP/OSAT units, and chip design. Total outlay: Rs 76,000 crore (approximately $10.2bn at 2021 exchange rates). By February 2024, the Cabinet had approved three major semiconductor units under ISM: Tata Electronics with PSMC (semiconductor fab, Dholera, Rs 91,526 crore), Tata Electronics OSAT (Morigaon, Assam, Rs 27,120 crore), and CG Power OSAT (Rs 7,584 crore), totalling over Rs 1.26 lakh crore in committed investment from private applicants.