Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
On 19 June 2026, President Mamadi Doumbouya chaired a strategic meeting in Conakry with industrial, semi-industrial and artisanal gold operators and gold-buying counters, announcing that "l'exportation de l'or brut appartient désormais au passé" — a formal and permanent prohibition on exporting unrefined gold mined in Guinea. All gold must henceforth be refined domestically, primarily via the state-backed Nimba Gold Refinery (Gbessia, Conakry), before any international sale. Operators who continue exporting raw gold risk suspension or revocation of their operating licence and mining convention. The measure extends Guinea's Simandou 2040 local-transformation doctrine — already applied to bauxite and iron ore — to the gold sector for the first time.
On 11 November 2025 President Mamadi Doumbouya officially inaugurated start of operations at the Simandou Integrated Project — Africa's largest greenfield mine-and-infrastructure asset — at a ceremony attended by the presidents of Rwanda and Gabon, China's Vice-Premier, and PMs from Côte d'Ivoire and Sierra Leone. The project comprises Blocks 1–2 (WCS: Winning International / China Hongqiao / Baowu) and Blocks 3–4 (SimFer: Rio Tinto 53% / Chinalco-led JV 47%), connected by 622 km of multi-use trans-Guinean railway to barge and transhipment port facilities at Forécariah, operated by Compagnie du TransGuinéen (CTG). Combined design capacity is up to 120 Mt/yr of high-grade (~65% Fe) iron ore, the largest single addition to seaborne supply since Vale's S11D ramp in 2016, structurally reshaping Australia-Brazil price competition and China's iron-ore import geography.
On 3 February 2024 Guinea's National Transition Council (CNT) ratified three inter-linked conventions structuring the Simandou integrated iron-ore mega-project: (i) the co-development agreement for the 670km Trans-Guinéen rail and Morebaya/Forécariah port, executed via the Compagnie du TransGuinéen (CTG) JV between the Republic of Guinea, Winning Consortium Simandou (WCS) and Rio Tinto Simfer; (ii) the WCS operating framework for blocks 1–2; and (iii) the bilateral adjustments to Simfer's amended-and-consolidated base convention covering blocks 3–4 with Rio Tinto and Chinalco/Baowu participation. Estimated integrated capex USD 15–20bn; first commercial shipment from Forécariah occurred in November 2025 with President Mamadi Doumbouya attending. At full ramp Simandou is designed for ~120 Mt/yr of high-grade (~65% Fe) ore — the largest single addition to seaborne iron-ore supply since Vale's S11D (2016).