Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
The Customs Tariff Commission of the State Council announced on April 28, 2026 that China will extend zero-tariff treatment (preferential tariff rate of 0%) to all 53 African countries with which it maintains diplomatic relations, effective May 1, 2026 through April 30, 2028. The measure adds 20 African non-LDC nations to the existing zero-tariff scheme already covering 33 African LDCs since December 2024, making China the first major economy to grant full-coverage zero-tariff access to all African diplomatic partners. Coverage extends to all tariff lines except out-of-quota products (where only in-quota rates move to zero); eSwatini is excluded as it maintains diplomatic relations with Taiwan rather than the PRC.
President Peter Mutharika signed an executive order effective 21 October 2025 prohibiting the export of all raw, unprocessed minerals extracted in Malawi, covering uranium, rare earth elements, niobium, graphite, tantalum, bauxite, rutile, gold, copper, diamonds, heavy mineral sands, and all other minerals. Minerals that have been processed, refined, or value-added in Malawi are exempt. The order aligns with an announced National Mining Corporation to oversee mineral production and processing, and introduces fines and sanctions under Malawi law for violations.
On 8 October 2025 South Africa's Public Investment Corporation (PIC) — the state-owned asset manager that invests the Government Employees Pension Fund and other public-sector funds — announced it has set aside ZAR 1.35 billion (~USD 78.7 million) to fund early-stage mining projects, from post-scoping through bankable-feasibility-study stage. Capital is deployed indirectly via private equity, venture capital, specialist mining funds and joint ventures, in tickets of ZAR 100-400 million per project. At least 50% of funded projects must be in South Africa, with the remainder earmarked for copper/cobalt in Zambia and the DRC, rare earths in Malawi, and graphite in Tanzania and Madagascar. The fund explicitly targets minerals aligned with South Africa's Just Energy Transition (JET) and carries BEE Level 2 / Historically Disadvantaged Individuals preference criteria for South African applicants.
At its 34th session in Harare on 5 June 2025, the SADC Committee of Ministers of Trade formally endorsed Angola's accession to the SADC Free Trade Area after Angola submitted its final tariff offer covering 90% of tariff lines — surpassing the SADC standard threshold of 85%. Angola becomes the 14th SADC member state to join the FTA, with implementation targeted for January 2026. The accession ends Angola's longstanding outlier status as the region's second-largest economy operating outside the bloc's duty-free zone, and opens tariff-free corridors between Angola and FTA members including South Africa, Zambia, DRC, Zimbabwe, and Mozambique.
On 25 March 2025 the European Commission adopted the first list of 47 Strategic Projects inside the EU under Article 7 of the Critical Raw Materials Act (Regulation (EU) 2024/1252), followed on 4 June 2025 by 13 Strategic Projects located in third countries — 60 designations in total. The 47 EU projects span 13 Member States and 14 strategic raw materials, with an expected EUR 22.5bn capital-investment envelope; the 13 third-country projects require a further EUR 5.5bn. Designation triggers fast-track permitting (max 27 months for extraction, 15 months for processing/recycling), preferential access to EU/EIB/EBRD finance, and Member State priority status, operationalising the CRMA's 2030 benchmarks (≥10% extraction, ≥40% processing, ≥25% recycling, ≤65% single-country dependence).