Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
The Union Cabinet chaired by Prime Minister Narendra Modi approved on 5 May 2026 two new semiconductor manufacturing units under the India Semiconductor Mission (ISM) Phase 1: Crystal Matrix Limited (CML) — India's first GaN-based compound-semiconductor and Mini/Micro-LED display fabrication facility (INR 3,068 crore, Dholera, Gujarat) and Suchi Semicon Private Limited (SSPL) — an OSAT facility for discrete semiconductors (INR 868 crore, Surat, Gujarat). Cumulative investment INR 3,936 crore (~USD 400mn); 2,230 skilled jobs at full ramp. This constitutes the 12th and final batch of ISM Phase 1 approvals, closing the first-phase envelope before ISM 2.0 (filed 2026-02-01) takes over.
The Union Cabinet chaired by Prime Minister Narendra Modi approved on 12 August 2025 four new semiconductor manufacturing units under the India Semiconductor Mission (ISM) Phase 1: SiCSem Private Limited (Silicon Carbide compound-semiconductor fab, Odisha, with UK partner Clas-SiC Wafer Fab Ltd.), 3D Glass Solutions Inc. (advanced glass-substrate packaging, Odisha), Continental Device India Private Limited / CDIL (discrete power-semiconductor expansion, Punjab), and Advanced System in Package Technologies / ASIP (OSAT unit with South Korea's APACT Co. Ltd, Andhra Pradesh). Cumulative investment INR 4,600 crore (~USD 525mn); 2,034 skilled jobs at full ramp. This brought total approved ISM Phase 1 projects to 10 across 6 states, with cumulative committed investment of approximately INR 1.60 lakh crore (~USD 18bn).
The Government of Maharashtra, Transport Department, notified the Maharashtra Electric Vehicle Policy 2025 on 23 May 2025 (Government Resolution No. 202505231834008229) after Cabinet approval on 28 April 2025, with retroactive effect from 1 April 2025 through 31 March 2030. The five-year policy carries an INR 1,993 crore (~USD 235 mn) headline outlay — comprising approximately INR 1,740 crore in purchase incentives, INR 100 crore in charging-infrastructure viability gap funding, and balance allocations for manufacturing incentives, R&D, skilling, and scrappage support — representing a 114% increase over the INR 930 crore outlay of the prior 2021–2025 policy. Targets include ~30% of all new vehicle registrations in Maharashtra to be electric by 2030, a charging station every 25 km on state and national highways, and a 10% base-price subsidy on electric two- and three-wheelers, private and public buses, and passenger vehicles (with an additional 5% top-up for goods-carrying 3W/4W, agricultural tractors, and combine harvesters). The instrument is sectoral and EV-only — distinct from the umbrella Maharashtra Industry, Investment & Services Policy 2025 (filed separately).
The Union Cabinet approved the Electronics Components Manufacturing Scheme (ECMS) on 28 March 2025, notified by the Ministry of Electronics and Information Technology (MeitY) via Gazette Notification CG-DL-E-08042025-262341 on 8 April 2025. The scheme has an original outlay of Rs 22,919 crore (~USD 2.7bn) over six years (FY26-FY31, with an optional one-year gestation period), raised to Rs 40,000 crore in the Union Budget 2026-27. ECMS targets passive components, multi-layer PCBs, lithium-ion battery cells, camera modules, display assembly, electromechanicals, bare-component sub-assemblies and capital equipment for semiconductor and electronics manufacturing -- the ecosystem feeding the existing large-scale-electronics PLI and the India Semiconductor Mission. The scheme targets investment of Rs 59,350 crore, production of Rs 4,56,500 crore and 91,600 direct jobs.
The Union Cabinet approved the Semicon India Programme on 15 December 2021, establishing the India Semiconductor Mission (ISM) as the nodal agency. The programme offers fiscal support of up to 50% of project cost for silicon semiconductor fabs, compound semiconductor facilities, display fabs, ATMP/OSAT units, and chip design. Total outlay: Rs 76,000 crore (approximately $10.2bn at 2021 exchange rates). By February 2024, the Cabinet had approved three major semiconductor units under ISM: Tata Electronics with PSMC (semiconductor fab, Dholera, Rs 91,526 crore), Tata Electronics OSAT (Morigaon, Assam, Rs 27,120 crore), and CG Power OSAT (Rs 7,584 crore), totalling over Rs 1.26 lakh crore in committed investment from private applicants.
The Union Cabinet approved the Production Linked Incentive (PLI) Scheme for Specialty Steel on 22 July 2021; the scheme was notified in the Gazette of India on 29 July 2021 by the Ministry of Steel and detailed scheme guidelines were published on 20 October 2021. Total outlay: Rs 6,322 crore (~USD 850m) over five years (FY 2024-25 through FY 2028-29). The scheme covers five product categories (coated/plated products, high-strength / wear-resistant steel, specialty rails, alloy steel and steel wires, and electrical steel) across 19 sub-categories, and offers incentives of 4-12% on incremental sales for end-to-end domestic specialty-steel production with melted-and-poured input requirement. PLI 1.1 reopened applications on 6 January 2025; PLI 1.2 (third round) was launched in 2025-2026 with a revised four-category / 22-sub-category structure and incentive rates up to 15%.
The Department of Pharmaceuticals notified the Production Linked Incentive (PLI) Scheme for Promotion of Domestic Manufacturing of Critical Key Starting Materials (KSMs), Drug Intermediates (DIs) and Active Pharmaceutical Ingredients (APIs) on 21 July 2020 via Gazette Notification, with an outlay of Rs 6,940 crore (~USD 920m) over FY 2020-21 to FY 2027-28. The scheme covers 41 identified critical bulk-drug products across four target segments — fermentation-based (Key Fermentation; Niche Fermentation) and chemical synthesis-based (Key Chemical Synthesis; Niche Chemical Synthesis) — paying 20% incentive on incremental sales for fermentation-based products (years 1-4) tapering to 15% (year 5) and 5% (year 6), and a flat 20% over 5 years for chemically-synthesised products. The stated objective is to reduce India's ~70% bulk-drug import dependence on China by establishing greenfield domestic manufacturing capacity with at least 90% domestic value addition for fermentation products and 70% for chemical-synthesis products.
The Union Cabinet approved the Production Linked Incentive (PLI) Scheme for Large Scale Electronics Manufacturing on 21 March 2020, with the scheme notified in the Gazette of India on 1 April 2020. Total outlay: Rs 40,995 crore (~$5.5bn) over five years. The scheme extends incentives of 4% to 6% on incremental sales (over FY 2019-20 base year) to eligible companies manufacturing mobile phones (invoice value >= Rs 15,000) and specified electronic components including ATMP units. Approved beneficiaries include Samsung, Foxconn, Wistron, Pegatron, and Indian firms Dixon, Lava, and Bhagwati (Micromax).