Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
The UK laid the Russia (Sanctions) (EU Exit) (Amendment) Regulations 2026 (SI 2026/543) before Parliament on 19 May 2026; it came into force on 20 May 2026. The instrument inserts a new Chapter 4KA (regulations 46Z23A-46Z23G) into the Russia (Sanctions) (EU Exit) Regulations 2019, prohibiting the import into the UK of uranium (HS 2844.10/2844.20/2844.30) that originates in or is consigned from Russia, the direct or indirect acquisition of Russian-origin or Russia-located uranium, and the supply or delivery of uranium from Russia to a third country — plus associated technical assistance, financial services/funds, and brokering services. Each prohibition carries a criminal offence with a reasonable-cause-to- suspect defence, subject to narrow exceptions and licensing grounds at regulations 16-19 of the amending instrument. The same instrument separately extends the existing ban on imports of relevant (2709-origin) Russian crude to cover oil products refined from that crude in a third country (new regulations 46Z9F-46Z9I).
President Tokayev signed Decree U2600001233 on 15 April 2026, formally adopting the Strategy for the Development of the Nuclear Industry of the Republic of Kazakhstan until 2050. The 30-year framework marks a structural pivot for the world's largest uranium producer (~45% of global mined supply) from a raw-ore export model toward domestic nuclear-energy sovereignty, targeting at least three operational NPPs by 2050 (a fourth under assessment), 5% of national electricity from nuclear by 2035, and 50% combined nuclear and renewables by 2050. The strategy mandates SMR evaluation for regional deployment, a 1% R&D levy on uranium miners' production costs through 2030, and the development of a Kazakh "nuclear cluster" producing high-value fuel-cycle goods and services rather than raw uranium concentrate alone.
Kazakhstan's Department of Atomic Energy signed a new Subsoil Use Agreement (SUA) for production at the Akdala uranium deposit, effective 29 March 2026, replacing the expired March 2001 contract. Subsoil rights are held by YUGHK LLP (South Mining and Chemical Company Joint Venture), in which Uranium One (a Rosatom subsidiary) owns 70% and Kazatomprom 30%. The deposit holds approximately 1,500 tonnes of uranium reserves and is expected to operate through 2030, after which the asset is subject to trust management transfer to Kazatomprom as the national company. The renewal was signed expressly to prevent disruption to the technological process and maintain social stability in the region, preserving Rosatom's controlling stake in a single producing Kazakhstani deposit at a time when Kazakhstan is otherwise tightening state control over strategic mineral assets.
On 2 February 2026 Kazatomprom disclosed in its 4Q25 Operations and Trading Update that it had amended multiple Subsoil Use Agreements (SUAs) to reduce the total 2026 licensed annual production ceiling from 32,777 tU to 29,697 tU — a reduction of approximately 3,080 tU (~9.4%). The primary driver is construction and commissioning delays at the Budenovskoye uranium deposit (JV with Uranium Energy Corp / UrAsia, Kazatomprom 51%), preventing the planned ramp-up. Revised 2026 production guidance of 27,500–29,000 tU on a 100% basis sits below the revised licensed ceiling, indicating that actual deliveries will be further constrained; force-majeure notices were issued to long-term offtake counterparties affected by the Budenovskoye shortfall. Kazakhstan accounts for approximately 43% of global primary uranium mine supply, making even a licensed-capacity adjustment a material signal for the global U3O8 and UF6 supply curve.