Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
On 3 February 2026 the European Commission opened an in-depth Phase II investigation under the Foreign Subsidies Regulation (FSR) — the second FSR ex officio case and the first targeting the renewable-energy wind-OEM sector — into whether Xinjiang Goldwind Science & Technology Co., Ltd. and its EU affiliates received Chinese foreign subsidies (grants, preferential tax treatment, and state-bank preferential financing) that distort competition for wind-turbine supply and services in the EU internal market. The case (FS.100143) follows the April 2024 preliminary-review opening and subjects Goldwind to an 18-month Phase II investigation with potential redressive-measures decision. The action structurally extends the FSR enforcement perimeter from security equipment (Nuctech, FS.100068) into the green-transition energy-equipment supply chain.
On 28 January 2026 the European Commission's CINEA agency allocated a EUR 103.69 million grant to Delgaz Grid SA (Romania), Elektroenergien Sistemen Operator EAD (Bulgaria) and Transelectrica (Romania) under the 2025 Connecting Europe Facility (CEF) Energy call, funding the "CARMEN: Smart Grids Increasing RES and Interconnectivity in the SEE Region" Project of Common and Mutual Interest. The grant supports cross-border smart-grid works to strengthen electricity interconnection and renewable-energy integration between Romania and Bulgaria. It is one of 14 cross-border energy infrastructure projects sharing roughly EUR 650 million from the same call round. CINEA formally awarded the grant certificate for the project on 21 May 2026 at the Energy Infrastructure Forum.
On 28 January 2026 the European Commission's CINEA agency allocated a EUR 180.03 million grant to Repsol Generación Electrica SA under the 2025 Connecting Europe Facility (CEF) Energy call, funding the "Construction of the Reversible Pumped-Storage Hydroelectric Power Plant AGUAYO II" Project of Common and Mutual Interest in Cantabria, Spain. It was the single largest individual allocation of the round and the only pumped-storage project among the 14 cross-border energy infrastructure projects sharing roughly EUR 650 million from the same call. AGUAYO II will support electricity system flexibility and renewable-energy integration; CINEA states it will reduce curtailment of renewable output by an estimated 1,438 GWh/year (about 7.3% of Spain's total curtailed renewables) and cut CO2 emissions by roughly 566,000 tonnes/year by displacing two nearby combined-cycle gas plants. CINEA formally awarded the grant certificate for the project on 21-22 May 2026 at the 12th Energy Infrastructure Forum in Copenhagen. Commissioning is targeted for 31 December 2030.
The European Investment Bank signed the first EUR 231 million tranche (EUR 16m + EUR 50m + EUR 165m) of a EUR 271 million green loan to Italy's Sunprime Holdings Srl on 22 December 2025, under the EIB-approved "Project Sophocles" solar-and-battery programme (project reference 20250247, approved 27 August 2025). The financing backs a EUR 487 million multi-year investment programme deploying roughly 280 MWp of small-scale solar PV across multiple Italian sites plus 80 MW and 270 MW of four-hour battery energy storage. A further EUR 40 million tranche signed in February 2026, and the programme was subsequently expanded to a EUR 507 million EIB/Natixis CIB co-financing package announced in March 2026. Global Trade Alert logs the December tranche as a "red" state-loan intervention on grounds that below-market EIB financing is a trade- and competition-distorting subsidy to a domestic renewable-energy developer.
The European Investment Bank signed a EUR 200 million multi-beneficiary intermediated loan (guarantee) with IKB Deutsche Industriebank AG on 15 December 2025, under the "IKB Loan for Midcaps MBIL" operation. The facility backs a total lending volume of roughly EUR 400 million to German mid-sized and large corporates, with a 30% Climate Action and Environmental Sustainability window earmarked for renewable energy (primarily solar PV and onshore wind) and energy-efficiency investments in industry. Per the EIB project record, the signed allocation splits EUR 48.6 million to energy, EUR 11.4 million to industry/construction, and EUR 140 million to general credit lines. Global Trade Alert separately logs the transaction as a "red"-flagged state-linked lending-support intervention.
The European Investment Bank signed a EUR 100 million (SEK 1.1 billion) loan agreement with Holmen, a Swedish forest-industry group, to finance the expansion of the company's onshore wind generation capacity in northern Sweden's electricity price regions. The financing, signed 30 October 2025 and announced via EIB press release on 3 November 2025, supports the European Commission's RePowerEU initiative and is intended to strengthen energy-intensive industry supply and Europe's clean-power resilience. Global Trade Alert logged the loan as a state-loan intervention on 30 October 2025.
The European Investment Bank signed a EUR 400 million (USD 469 million) intermediated framework loan with Norddeutsche Landesbank (NordLB) on 30 September 2025, under the "NordLB Renewable Energy 2" operation. NordLB on-lends the EIB funds at long-term, below-market financing conditions to eligible renewable-energy projects — mainly photovoltaic, onshore wind and battery storage — located predominantly in Germany and other EU countries, with the intermediated structure designed to extend financing to smaller projects that would not otherwise access direct EIB funding. Global Trade Alert separately logs the transaction as a "red"-flagged state-loan intervention.
At the first-ever EU-Central Asia Summit in Samarkand (4 April 2025), the European Commission and Kazakhstan endorsed the EU-Kazakhstan Strategic Partnership Roadmap 2025-2026, operationalising the 7 November 2022 MoU on Sustainable Raw Materials, Batteries, and Renewable Hydrogen with concrete two-year workstreams: geological exploration cooperation, joint R&I programmes (Horizon Europe linkages), skills and training cooperation, and promotion of ESG standards aligned with the EU Critical Raw Materials Act (CRMA, Reg. (EU) 2024/1252). The Roadmap positions Kazakhstan as the EU's primary Central-Asian CRMA Strategic Partner under Art. 37, unlocking a potential multi-billion-EUR Global Gateway financing pipeline and structurally rebalancing KZ critical-mineral export flows away from China/Russia dependencies.
The European Commission published Implementing Regulation (EU) 2025/261 in the Official Journal on 10 February 2025, imposing definitive anti-dumping duties on imports of biodiesel (fatty-acid mono-alkyl esters / FAME and paraffinic gasoils from synthesis or hydro-treatment of non-fossil origin / HVO) originating in China. Duties range from 10.0% (EcoCeres, an individually-examined producer) to 21.7%–35.6% for other exporters, applied on top of the MFN import duty, covering an estimated €1.4 billion of annual EU-bound Chinese biodiesel flows. The regulation supersedes provisional duties imposed under CR (EU) 2024/2163 and explicitly excludes Sustainable Aviation Fuel (SAF) from the AD scope while introducing mandatory SAF import-registration tracking.
On 3 April 2024 the European Commission opened two simultaneous FSR Phase II in-depth investigations — the second and third ever under the Foreign Subsidies Regulation (Regulation 2022/2560) — concerning a Romanian public-procurement procedure for the design, construction and operation of a 454.97 MW EU-co-funded photovoltaic park (Rovinari Est). The first investigation targeted the ENEVO Group consortium including LONGi Solar Technologie GmbH (German subsidiary wholly owned by HK-listed LONGi Green Energy Technology Co., Ltd.); the second targeted Shanghai Electric UK Co. Ltd. and Shanghai Electric Hong Kong International Engineering Co., Ltd. (Chinese SOE). Both respondents withdrew from the procurement procedure after the Commission's opening; the Commission subsequently closed both investigations. This was the first FSR Phase II enforcement action in the renewable-energy / solar-PV sector and the first targeting a private Chinese-listed company's EU subsidiary.