Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
On 14 September 2026 the European Commission adopted a Delegated Regulation (reference C(2026)6323) amending Annex I of Regulation (EU) 2021/821 to add newly-controlled dual-use items implementing the 2025 multilateral cycle of the Wassenaar Arrangement, MTCR, Australia Group, and NSG. New entries include semiconductor fabrication equipment (atomic layer deposition, EUV inspection systems, wafer cleaning), advanced computing ICs with digital processing units, ceramic matrix composites, additive-manufacturing systems for energetic materials, and chemical vapor deposition equipment for silicon carbide fibre production. The regulation is not yet in force: it now enters the standard two-month European Parliament/Council non-objection scrutiny period before publication in the Official Journal.
On 25 March 2025 the European Commission adopted the first list of 47 Strategic Projects inside the EU under Article 7 of the Critical Raw Materials Act (Regulation (EU) 2024/1252), followed on 4 June 2025 by 13 Strategic Projects located in third countries — 60 designations in total. The 47 EU projects span 13 Member States and 14 strategic raw materials, with an expected EUR 22.5bn capital-investment envelope; the 13 third-country projects require a further EUR 5.5bn. Designation triggers fast-track permitting (max 27 months for extraction, 15 months for processing/recycling), preferential access to EU/EIB/EBRD finance, and Member State priority status, operationalising the CRMA's 2030 benchmarks (≥10% extraction, ≥40% processing, ≥25% recycling, ≤65% single-country dependence).
The EU Critical Raw Materials Act (Regulation (EU) 2024/1252) entered into force on 23 May 2024 after publication in the EU Official Journal on 3 May 2024. The Act sets binding 2030 benchmarks for the Union: ≥10% of annual consumption from domestic extraction, ≥40% from domestic processing, ≥25% from domestic recycling, and a strict ≤65% concentration limit from any single third country for each strategic raw material. It establishes a list of 17 strategic raw materials and 34 critical raw materials, creates a "Strategic Project" fast-track permitting regime (≤27 months for extraction, ≤15 months for recycling), and mandates joint purchasing and supply-risk stress tests for large EU manufacturers.
Regulation (EU) 2023/1115, adopted 31 May 2023 and in force 29 June 2023, requires all EU operators and traders placing seven in-scope commodities and their derived products on the EU market — or exporting them from the EU — to file due-diligence statements certifying that goods are deforestation-free (no land cleared after 31 December 2020) and produced in compliance with the relevant legislation of the country of origin. A Commission-administered risk-classification system assigns producer countries to low, standard, or high-risk tiers with differentiated due-diligence burdens. Application was subsequently postponed twice: to 30 December 2026 for large operators (Reg (EU) 2024/3234 and Reg (EU) 2025/2650).