Loading…
Loading…
Structured register of government actions in the geoeconomic space — export controls, tariffs, sanctions, FDI screening, subsidies, industrial-policy laws — cross-referenced into the country, minerals, and ETF surface. Charter: docs/IPTM_CHARTER.md.
Severity 1-5 is the qualitative impact rating (1=minor, 5=structural). The bilateral-trade-grounded quant scorer is the next IPTM milestone. RBI (Register Breadth Index) is a complementary structural-breadth indicator from scripts/py/iptm/breadth.py; divergence between RBI and severity is itself informative (high-sev / low-RBI = strategic chokepoint; low-sev / high-RBI = broad but shallow). Every action has at least one primary source URL. Verify-or-don't-file. See also themes, timeline, graph, sankey, map, country exposure, sector exposure, material exposure (+ graph), weekly briefs, portfolio scan, escalation monitor, trans-shipment hubs. Internal triage tools (RSS-poller candidate feed, source-feed health) live under /admin/candidates + /admin/sources. Subscribe via Atom feed (accepts ?country=CN, ?material=lithium, ?issuer=BIS, ?type=export_control, ?etf=SOXX, ?company=NVDA, ?minSeverity=4, ?year=2026, ?q=…) or pull /api/iptm/actions.
South African Cabinet on 25 June 2025 approved a three-part package to revitalise the domestic ferrochrome sector: (i) placement of chrome ore under export control via the International Trade Administration Commission (ITAC) under the International Trade Administration Act 71 of 2002, requiring an export permit prior to dispatch; (ii) initiation of work on a chrome ore export tax (rate not finalised; market reporting cites 25%); (iii) expanded SEZ incentives for ferrochrome smelters and a negotiated electricity- tariff relief mechanism. The DTIC notice formally placing chrome ore under export control was published in Government Gazette No. 53477 General Notice 6712 on 3 October 2025 with a 30-day public-comment window closing 31 October 2025; the final permit regime takes effect upon subsequent ministerial gazette notice. South Africa accounts for >70% of seaborne chrome ore exports, so the regime is globally material to stainless-steel supply chains.
On 30 May 2025, South Africa's Minister of Electricity and Energy, Dr Kgosientsho Ramokgopa, announced five preferred bidders under Bid Window 3 of the Battery Energy Storage Independent Power Producer Procurement Programme (BESIPPPP), covering up to 616 MW/2,464 MWh of battery storage capacity across five sites in the Free State supply area, representing R9.5 billion in investment. Award of preferred-bidder status is conditioned on binding local-content and economic-empowerment requirements: minimum 40% black shareholding in each IPP project company, up to 30% black shareholding by construction contractors (up to 42% in operations), over R3.7 billion in local content spend during construction and operations, and R184 million ring-fenced for supplier development and skills training. Reuters/industry reporting identifies Mulilo (four sites) and Scatec of Norway (one site) as the winning IPPs.
South African Cabinet on 20 May 2025 approved the publication of the Draft Mineral Resources Development Bill (MRDB) 2025, gazetted by Minister of Mineral and Petroleum Resources Gwede Mantashe to amend the Mineral and Petroleum Resources Development Act (MPRDA). The Bill streamlines mining-rights administration by aligning with NEMA and the National Water Act, introduces a new licensing regime for artisanal and small-scale mining, and acts as the legislative implementing instrument for the Critical Minerals and Metals Strategy approved at the same Cabinet sitting. Public-comment window ran through 13 August 2025; the Bill has not yet been enacted.